<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://indianpedia.org/index.php?action=history&amp;feed=atom&amp;title=East_West_Metro_Tunnel</id>
	<title>East West Metro Tunnel - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://indianpedia.org/index.php?action=history&amp;feed=atom&amp;title=East_West_Metro_Tunnel"/>
	<link rel="alternate" type="text/html" href="https://indianpedia.org/index.php?title=East_West_Metro_Tunnel&amp;action=history"/>
	<updated>2026-08-01T02:34:10Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.45.4</generator>
	<entry>
		<id>https://indianpedia.org/index.php?title=East_West_Metro_Tunnel&amp;diff=201023&amp;oldid=prev</id>
		<title>&gt;BrownHairedGirl at 02:09, 22 April 2021</title>
		<link rel="alternate" type="text/html" href="https://indianpedia.org/index.php?title=East_West_Metro_Tunnel&amp;diff=201023&amp;oldid=prev"/>
		<updated>2021-04-22T02:09:29Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{short description|First underwater metro tunnel in India}}&lt;br /&gt;
{{Use dmy dates|date=December 2018}}&lt;br /&gt;
{{Use Indian English|date=December 2018}}&lt;br /&gt;
{{Infobox tunnel&lt;br /&gt;
|other_name= Hooghly River Tunnel&lt;br /&gt;
| image = File:East West Metro Kolkata.png&lt;br /&gt;
| image_size = 300px&lt;br /&gt;
| caption = Underground section starts from Phoolbagan to Howrah Maidan&lt;br /&gt;
| location = {{flagicon|IND}} [[Kolkata metropolitan area]], India&lt;br /&gt;
| status = Under construction &lt;br /&gt;
| start =[[Phoolbagan metro station]], [[Kolkata]]&lt;br /&gt;
| end = [[Howrah Maidan metro station]], [[Howrah]]&lt;br /&gt;
| owner = [[Kolkata Metro Rail Corporation]]&lt;br /&gt;
| operator = [[Kolkata Metro Rail Corporation]]&lt;br /&gt;
| traffic = [[Kolkata]]&lt;br /&gt;
| length = {{convert|10.8|km|mi|abbr=on}} &amp;lt;br /&amp;gt;{{convert|0.520|km|mi|abbr=on}} (underneath Hooghly)&lt;br /&gt;
}}{{Kolkata Metro sidebar}}&amp;#039;&amp;#039;&amp;#039;East West Metro Tunnel&amp;#039;&amp;#039;&amp;#039;&amp;lt;ref&amp;gt;{{cite news|title=Underwater metro tunnel work likely to begin next month|url=http://m.timesofindia.com/city/kolkata/underwater-metro-tunnel-work-likely-to-begin-next-month/articleshow/57283340.cms}}&amp;lt;/ref&amp;gt; is an under-construction underwater river tunnel of [[Kolkata Metro]] in [[Kolkata]], [[West Bengal]]. The river tunnel is constructed underneath [[Hooghly River]]. Tunnel length is {{convert|10.8|km|mi|abbr=on}} and width is {{convert|5.5|m}}. A 520m stretch of the tracks will go through a tunnel under the Hooghly River. The roof of the tunnel would be about 30 metres from the ground level. The tunnel will be completed in 2021.&amp;lt;ref&amp;gt;{{cite news|title=Kolkata Metro’s new line may open in 2018|newspaper= The Hindu Business |url= http://m.thehindubusinessline.com/economy/logistics/kolkata-metros-new-line-may-open-in-2018/article7318953.ece}}&amp;lt;/ref&amp;gt; The tunnel will be the first underwater river tunnel in India.&amp;lt;ref&amp;gt;{{cite news|title= Indias first underwater tunnel for Howrah Kolkata metro almost finishes|url=http://www.oneindia.com/videos/india-s-first-underwater-tunnel-for-howrah-kolkata-metro-almost-finishes-173761.html}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite news|title =Kolkata to get indias first underwater metro |url=http://m.indiatoday.in/story/kolkata-to-get-indias-first-underwater-metro/1/975842.html}}&amp;lt;/ref&amp;gt; The tunnel is used by [[Kolkata Metro Line 2|East West Metro Line]] for metro rail service and constructed by [[Kolkata Metro Rail Corporation]].&amp;lt;ref&amp;gt;{{cite news|title= Kolkata Metro Rail Corporation Ltd.|newspaper =kmrc.in|url=http://www.kmrc.in/}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Construction ==&lt;br /&gt;
[[File:East West metro tunnel.jpg|thumb|right|East West Metro Tunnel, under [[Hooghly River]] – First underwater metro tunnel in India]]&lt;br /&gt;
The section between [[Sealdah metro station]] and [[Mahakaran metro station]] was realigned due to the inability of GoWB to provide land on the surface along the original route. Even on the new alignment a station planned at Wellington had to be dropped as Government of West Bengal  was unable to provide the required land on the surface. Work at Howrah Maidan have started in March 2016. The section between [[Howrah Maidan metro station]] and [[Esplanade metro station]] has been built by Afcons – Transtonnelstroy JV team, two tunnel boring machines from Herrenknecht are being used to dig the tunnel. This section passes through the Hooghly River for a distance of 520 meters. The section under the river is at a depth of 30 meters (roof to ground distance) whereas the average roof to ground distance is 17 meters. The [[Howrah metro station]] on the west side of the river will be at a depth of 30 meters. Tunnelling started from Howrah Maidan side. On 23 May one of the TBM named Rachna completed the tunneling under the Hooghly River in 36 days. The other TBM named Prerna also completed the tunnelling work under the river on 21 June 2017. There were some concerns during tunnelling under Brabourne Road as the tunnel would pass within 100 meters of heritage structures and there were also many old and dilapidated buildings in this section. KMRC received permission from Archaeological Survey of India in June 2017. Residents and shops in the old building were temporarily shifted and the buildings were reinforced before construction of tunnel. Construction of tunnel till Mahakaran station was completed in November 2017. For the Mahakaran–Esplanade section tunnelling of one of the tunnel has been completed on 23 March 2018 the other tunnel has also been completed by April. In this sections also shops and residents of the buildings have been shifted in phased manner before tunnelling. The Esplanade–Sealdah section will be executed by ITD-ITD Cementation JV and was scheduled to start in May 2018.&lt;br /&gt;
[[File:Urban Transport, Kolkata.jpg|thumb|right|Work being done at Howrah Maidan metro station]]&lt;br /&gt;
&lt;br /&gt;
5490 meters of tunnel have been constructed between Subhash Sarovar and Sealdah. This section was constructed by ITD-ITD Cementation JV. All the cross passes between the two tunnels have also been completed. Track laying is being carried out in this section. The tunneling work was stopped due to collapse of building on 3 September 2019 over the [[Bowbazar]] area due to TBM hitting an aquifer. The work resumed in June, 2020 and successfully completed the affected area.&amp;lt;ref&amp;gt;{{Cite web|last=|first=|date=23 June 2020|title=Resumption of tunnelling work of E-W Metro|url=http://www.outlookindia.com/newsscroll/amp/several-residents-in-citys-bowbazar-area-moved-to-hotels-as-work-resumed-for-ew-metro-official/1875184|url-status=live|archive-url=|archive-date=|access-date=6 October 2020|website=Outlook India}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Timelines ==&lt;br /&gt;
&lt;br /&gt;
* 2009: Contract for building the underground section from Subhash Sarabor to Central Station awarded to ITD-ITD Cementation JV.&lt;br /&gt;
* 2009: Physical construction of E–W corridor starts.&lt;br /&gt;
* 2010: Contract for building the underground section from Central to Howrah Maidan awarded to [[Shapoorji Pallonji Group|Afcons]].&lt;br /&gt;
* 2012: Realignment proposed to avoid shifting of 80 families from Bowbazar and hawkers from Brabourne Road.&lt;br /&gt;
* 2015: Realignment approved by [[Indian Railways|Railways]] and JICA in between Sealdah to Howrah station.&lt;br /&gt;
* 2015: Subodh Mullick Square station, a key stop in the revised blueprint, done away with to avoid eviction of hawkers.&lt;br /&gt;
* 2017-March: [[Shapoorji Pallonji Group|Afcons]] nicknames the tunnel boring machines as Prerna and Rachna inspired from the names of daughter of their employee.&lt;br /&gt;
* 2017 – May 23: First TBM completes tunneling the eastbound tunnel under the Hooghly river.&lt;br /&gt;
* 2017 – June 21: Second TBM completes tunneling the westbound tunnel under the river Hooghly.&lt;br /&gt;
* 2017-June: Permission received from [[Archaeological Survey of India]] for construction of tunnel within 100 meters of three heritage buildings.&lt;br /&gt;
* 2017-July: Tram depot at Esplanade shifted to facilitate construction of Metro Station.&lt;br /&gt;
* 2017-July: People from 11 buildings in Brebourne Road evacuated in phased manner when the TBM&amp;#039;s passes below these old buildings.&lt;br /&gt;
* 2017-August: Mini-bus stand at Mahakaran shifted to facilitate the construction of underground station.&lt;br /&gt;
* 2017-December: Tunnelling between Mahakaran station and Esplanade station on going.&lt;br /&gt;
* 2018 – March 23: First TBM named Prerna reaches Esplanade station completing the section from Howrah Maidan to Esplanade. This tunnel will be used by Howrah bound tunnel.&lt;br /&gt;
* 2018 – Apr 5: Second TBM named Rachna completes boring of second tunnel between Howrah Maidan and Esplanade station.&lt;br /&gt;
*2019 – Apr 14: Tunneling stopped due to lack of muck cars, and needed to be upgraded. Work started again after 5 days. &lt;br /&gt;
*2019 – Jun 23: TBMs Rachna &amp;amp; Prerna, after being parked at Curzon Park for few months, are finally being taken out.&lt;br /&gt;
*2019 – July 3: Both the TBMs are successfully taken out and loaded on trailers. With this, Rachna and Prerna&amp;#039;s journey of tunneling under a river comes to an end.&lt;br /&gt;
&lt;br /&gt;
==References ==&lt;br /&gt;
{{Reflist}}{{Kolkata Metro}}&lt;br /&gt;
&lt;br /&gt;
{{coord missing|West Bengal}}&lt;br /&gt;
&lt;br /&gt;
[[Category:Kolkata Metro]]&lt;br /&gt;
[[Category:Railway tunnels in West Bengal]]&lt;br /&gt;
[[Category:2021 in rail transport]]&lt;br /&gt;
[[Category:Proposed rail infrastructure in India]]&lt;br /&gt;
[[Category:Proposed tunnels in Asia]]&lt;/div&gt;</summary>
		<author><name>&gt;BrownHairedGirl</name></author>
	</entry>
</feed>