<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://indianpedia.org/index.php?action=history&amp;feed=atom&amp;title=Jabalpur-Bhusaval_section</id>
	<title>Jabalpur-Bhusaval section - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://indianpedia.org/index.php?action=history&amp;feed=atom&amp;title=Jabalpur-Bhusaval_section"/>
	<link rel="alternate" type="text/html" href="https://indianpedia.org/index.php?title=Jabalpur-Bhusaval_section&amp;action=history"/>
	<updated>2026-07-31T00:56:56Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.45.4</generator>
	<entry>
		<id>https://indianpedia.org/index.php?title=Jabalpur-Bhusaval_section&amp;diff=371503&amp;oldid=prev</id>
		<title>Ajendra69 at 08:23, 25 December 2022</title>
		<link rel="alternate" type="text/html" href="https://indianpedia.org/index.php?title=Jabalpur-Bhusaval_section&amp;diff=371503&amp;oldid=prev"/>
		<updated>2022-12-25T08:23:35Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{short description|Railway section in India}}&lt;br /&gt;
{{Use dmy dates|date=September 2015}}&lt;br /&gt;
{{Use Indian English|date=September 2015}}&lt;br /&gt;
{{Infobox rail line&lt;br /&gt;
 | box_width   = 28em&lt;br /&gt;
 | name        = Jabalpur–Bhusaval section&lt;br /&gt;
 | color       =&lt;br /&gt;
 | logo        = &amp;lt;!-- Do NOT place a non-free image here without complying with WP:NFCC #10c --&amp;gt;&lt;br /&gt;
 | logo_width  = 100 px&lt;br /&gt;
 | image       = WAP-5 at Itarsi.JPG&lt;br /&gt;
 | image_width =&lt;br /&gt;
 | caption     = Goa Express enters Itarsi Junction lies on Jabalpur–Bhusaval section&lt;br /&gt;
 | type        =&lt;br /&gt;
 | system      = &lt;br /&gt;
 | status      = Operational&lt;br /&gt;
 | locale      =  [[Narmada River|Narmada Valley]], [[Tapti River|Tapti Valley]], hilly region in between&lt;br /&gt;
 | start       = [[Jabalpur Junction railway station|Jabalpur]] (Station Code &amp;#039;&amp;#039;&amp;#039;JBP&amp;#039;&amp;#039;&amp;#039;)&lt;br /&gt;
 | end         = [[Bhusaval Junction railway station|Bhusaval]] (Station Code &amp;#039;&amp;#039;&amp;#039;BSL&amp;#039;&amp;#039;&amp;#039;)&lt;br /&gt;
 | stations    = &lt;br /&gt;
 | routes      = [[Howrah–Allahabad–Mumbai line]]&lt;br /&gt;
 | daily_ridership =&lt;br /&gt;
 | open        = 1870&lt;br /&gt;
 | close       =&lt;br /&gt;
 | owner = [[Indian Railways]]&lt;br /&gt;
 | operator    = [[North Central Railway zone|North Central Railway]]&amp;lt;br/&amp;gt;[[West Central Railway zone|West Central Railway]] &lt;br /&gt;
 | character   =&lt;br /&gt;
 | depot       = Itarsi, Bhusaval&lt;br /&gt;
 | stock       = [[Indian locomotive class WDM-2|WDM-2]], WDM-3A, WDM-3D, WDS-6 and WDP-4 diesel locos; and [[Indian locomotive class WAM-4|WAM-4]], [[Indian locomotive class WAP-4|WAP- 4]], [[Indian locomotive class WAG-5|WAG-5]], WAG-7 and WCM-6 electric locomotives.&lt;br /&gt;
 | linelength  = &lt;br /&gt;
 | tracklength = New Alignment from 2004 {{convert|551|km|mi|0|abbr=on}}. Old Alignment until 2004 {{convert|537|km|mi|0|abbr=on}}&lt;br /&gt;
 | tracks      = 2&lt;br /&gt;
 | gauge       = {{Track gauge|5ft6in|lk=on}} [[broad gauge]]&lt;br /&gt;
 | old_gauge   =&lt;br /&gt;
 | minradius   =&lt;br /&gt;
 | racksystem  =&lt;br /&gt;
 | electrification = Electrified&lt;br /&gt;
 | speed       = up to 130 km/h&lt;br /&gt;
 | elevation   =&lt;br /&gt;
 | website     =&lt;br /&gt;
 | map         = {{Jabalpur–Bhusaval section|inline=1}}&lt;br /&gt;
 | map_state   = collapsed&lt;br /&gt;
}}&lt;br /&gt;
The &amp;#039;&amp;#039;&amp;#039;Jabalpur–Bhusaval section&amp;#039;&amp;#039;&amp;#039; is a railway line connecting [[Jabalpur Junction railway station|Jabalpur]], [[Madhya Pradesh]] and {{stnlnk|Bhusaval}}, [[Maharashtra]]. This {{convert|552|km|mi|0|abbr= on}} track is part of the [[Howrah–Allahabad–Mumbai line]], one of the busiest railways in India. The line is under the jurisdiction of [[West Central Railway zone|West Central Railway]] and [[Central Railway zone|Central Railway]].&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
The [[Great Indian Peninsula Railway]]&amp;#039;s pioneering Bombay–Thane line was extended to {{stnlnk|Kalyan}} in May 1854. {{stnlnk|Bhusaval}} station was set up in 1860. In 1866 Bhusaval-Khandwa section was opened. The GIPR connection reached [[Jabalpur Junction railway station|Jabalpur]] from [[Itarsi Junction railway station|Itarsi]] on 7 March 1870,  linking up with the [[East Indian Railway Company]] track there from Allahabad, and establishing connectivity between Mumbai and Kolkata.&amp;lt;ref&amp;gt;{{cite web| url=http://www.irfca.org/faq/faq-hist.html| title=IR History: Early Days – I| work=Chronology of railways in India, Part 2 (1832–1865)| access-date = 17 November 2013}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite web| url=http://www.irfca.org/faq/faq-history2.html| title=IR History: Early Days – II| work=Chronology of railways in India, Part 2 (1870–1899)| access-date = 17 November 2013}}&amp;lt;/ref&amp;gt; Before construction of [[Indira Sagar Dam]] in 2004 on [[Narmada River|Narmada Valley]], the route was {{convert|537|km|mi|0|abbr=on}} long. The old alignment got submerged in 2004 due to [[Indira Sagar Dam]] &amp;amp; a new alignment was made which increased the route distance by {{convert|14|km|mi|0|abbr=on}}.&lt;br /&gt;
&lt;br /&gt;
==Electrification==&lt;br /&gt;
While the Itarsi–Harda sector was electrified in 1990–91, the Harda–Khandwa–Bhusaval sector was electrified the next year.&amp;lt;ref&amp;gt;{{cite web| url = http://irfca.org/docs/electrification-history.html|title = History of Electrification| publisher= IRFCA| access-date = 17 November 2013}}&amp;lt;/ref&amp;gt; The {{convert|605|km|mi}} long Naini Junction–Manikpur Junction–Stana Junction-Katni Junction-[[Jabalpur Junction railway station|Jabalpur]]–[[Itarsi Junction railway station|Itarsi]] route has been completely electrified under Vision 2020 – A Blue print for Railway Electrification Programme.&amp;lt;ref&amp;gt;{{cite web|url=http://www.indianrailways.gov.in/railwayboard/uploads/directorate/planning/downloads/vision_2020_blue_050411.pdf |title=Vision 2020 – A Blueprint for Railway Electrification |publisher=Ministry of Railways |access-date=17 November 2013 |url-status=dead |archiveurl=https://web.archive.org/web/20120710212957/http://www.indianrailways.gov.in/railwayboard/uploads/directorate/planning/downloads/vision_2020_blue_050411.pdf |archivedate=10 July 2012 }}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Speed limits==&lt;br /&gt;
The [[Howrah–Allahabad–Mumbai line]] is classified as &amp;#039;B&amp;#039; class where trains can run up to {{convert|130|kph|mph}}.&amp;lt;ref&amp;gt;{{cite news| url=http://www.irfca.org/faq/faq-pway.html| title=Permanent Way| work=Track Classifications| access-date=17 November 2013 }}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Passenger movement==&lt;br /&gt;
[[Jabalpur Junction railway station|Jabalpur]] (Station Code &amp;#039;&amp;#039;&amp;#039;JBP&amp;#039;&amp;#039;&amp;#039;) and [[Bhusaval Junction railway station|Bhusaval]] (Station Code &amp;#039;&amp;#039;&amp;#039;BSL&amp;#039;&amp;#039;&amp;#039;)are amongst the top hundred booking stations of Indian Railway.&amp;lt;ref&amp;gt;{{cite web|url=http://www.indianrail.gov.in/7days_Avl.html |title=Indian Railways Passenger Reservation Enquiry |work=Availability in trains for Top 100 Booking Stations of Indian Railways |publisher=IRFCA |access-date=17 November 2013 |url-status=dead |archiveurl=https://web.archive.org/web/20140510115649/http://www.indianrail.gov.in/7days_Avl.html |archivedate=10 May 2014 }}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Loco sheds==&lt;br /&gt;
Itarsi diesel shed holds 145+ locos. It has [[Indian locomotive class WDM-2|WDM-2]], WDM-3A, WDM-3D, WDS-6 and WDP-4 diesel locos. This shed serves routes all across central India. Itarsi electric loco shed came up in the 1980s. It holds WAM-4, WAP-4 and [[Indian locomotive class WAG-5|WAG-5]] electric locos. Its WAG-5 locos perform banking duties on the Budni–Barkhera ghat section. Bhusaval electric loco shed has [[Indian locomotive class WAM-4|WAM-4]], [[Indian locomotive class WAP-4|WAP-4]], [[Indian locomotive class WAG-5|WAG-5]], WAG-7 and WCM-6 locomotives.&amp;lt;ref&amp;gt;{{cite web| url = http://www.irfca.org/faq/faq-shed.html |title = Sheds and Workshops| publisher= IRFCA| access-date = 17 November 2013}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
{{Reflist}}&lt;br /&gt;
&lt;br /&gt;
==External links==&lt;br /&gt;
* [http://indiarailinfo.com/arrivals/jabalpur-junction-jbp/529 Trains at Jabalpur]&lt;br /&gt;
* [http://indiarailinfo.com/arrivals/gadarwara-gar/ Trains/42 at Gadarwara]&lt;br /&gt;
* [http://indiarailinfo.com/arrivals/itarsi-junction-et/13 Trains at Itarsi]&lt;br /&gt;
* [http://indiarailinfo.com/arrivals/khandwa-junction-knw/471 Trains at Khandwa]&lt;br /&gt;
* [http://indiarailinfo.com/arrivals/bhusaval-junction-bsl/208 Trains at Bhusaval]&lt;br /&gt;
&lt;br /&gt;
{{Railways in Central India}}&lt;br /&gt;
{{Narmada basin}}&lt;br /&gt;
&lt;br /&gt;
{{DEFAULTSORT:Jabalpur - Bhusaval section}}&lt;br /&gt;
[[Category:5 ft 6 in gauge railways in India]]&lt;br /&gt;
[[Category:Rail transport in Maharashtra]]&lt;br /&gt;
[[Category:Rail transport in Madhya Pradesh]]&lt;br /&gt;
[[Category:Railway lines opened in 1870]]&lt;br /&gt;
[[Category:Jabalpur railway division|*]]&lt;br /&gt;
[[Category:Bhusawal railway division|*]]&lt;br /&gt;
[[Category:Transport in Bhusawal]]&lt;br /&gt;
[[Category:Transport in Jabalpur]]&lt;/div&gt;</summary>
		<author><name>Ajendra69</name></author>
	</entry>
</feed>