<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://indianpedia.org/index.php?action=history&amp;feed=atom&amp;title=Kalpasar_Project</id>
	<title>Kalpasar Project - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://indianpedia.org/index.php?action=history&amp;feed=atom&amp;title=Kalpasar_Project"/>
	<link rel="alternate" type="text/html" href="https://indianpedia.org/index.php?title=Kalpasar_Project&amp;action=history"/>
	<updated>2026-07-30T01:58:39Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.45.4</generator>
	<entry>
		<id>https://indianpedia.org/index.php?title=Kalpasar_Project&amp;diff=507779&amp;oldid=prev</id>
		<title>DwainKilgore21 at 23:12, 22 February 2026</title>
		<link rel="alternate" type="text/html" href="https://indianpedia.org/index.php?title=Kalpasar_Project&amp;diff=507779&amp;oldid=prev"/>
		<updated>2026-02-22T23:12:16Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{Short description|Dam in India}}&lt;br /&gt;
{{Use dmy dates|date=November 2019}}&lt;br /&gt;
{{update|date=June 2021}}&lt;br /&gt;
{{Infobox dam&lt;br /&gt;
| name = Kalpasar Dam&lt;br /&gt;
| name_official =&lt;br /&gt;
| image =&lt;br /&gt;
| image_size =&lt;br /&gt;
| image_caption =&lt;br /&gt;
| image_alt =&lt;br /&gt;
| location_map = India&lt;br /&gt;
| location_map_size =&lt;br /&gt;
| location_map_caption =&lt;br /&gt;
| location_map_alt =&lt;br /&gt;
| mapframe = yes&lt;br /&gt;
| mapframe-marker = dam &lt;br /&gt;
| coordinates = {{coord|21|27|21|N|72|24|57|E|display=inline}}&lt;br /&gt;
| country =&lt;br /&gt;
| location =&lt;br /&gt;
| purpose =&lt;br /&gt;
| status =&lt;br /&gt;
| construction_began =&lt;br /&gt;
| opening =&lt;br /&gt;
| demolished =&lt;br /&gt;
| cost =&lt;br /&gt;
| builder =&lt;br /&gt;
| owner =&lt;br /&gt;
| operator =&lt;br /&gt;
| dam_type =&lt;br /&gt;
| dam_crosses =&lt;br /&gt;
| dam_height_foundation =&lt;br /&gt;
| dam_height_thalweg =&lt;br /&gt;
| dam_length =&lt;br /&gt;
| dam_elevation_crest =&lt;br /&gt;
| dam_width_crest =&lt;br /&gt;
| dam_width_base =&lt;br /&gt;
| dam_volume =&lt;br /&gt;
| spillway_count =&lt;br /&gt;
| spillway_type =&lt;br /&gt;
| spillway_capacity =&lt;br /&gt;
| res_name =&lt;br /&gt;
| res_capacity_total =&lt;br /&gt;
| res_capacity_active =&lt;br /&gt;
| res_capacity_inactive =&lt;br /&gt;
| res_catchment =&lt;br /&gt;
| res_surface =&lt;br /&gt;
| res_max_length =&lt;br /&gt;
| res_max_width =&lt;br /&gt;
| res_max_depth =&lt;br /&gt;
| res_elevation =&lt;br /&gt;
| res_tidal_range =&lt;br /&gt;
| lower_dam_type =&lt;br /&gt;
| lower_dam_crosses =&lt;br /&gt;
| lower_dam_height_foundation =&lt;br /&gt;
| lower_dam_height_thalweg =&lt;br /&gt;
| lower_dam_length =&lt;br /&gt;
| lower_dam_elevation_crest =&lt;br /&gt;
| lower_dam_width_crest =&lt;br /&gt;
| lower_dam_width_base =&lt;br /&gt;
| lower_dam_volume =&lt;br /&gt;
| lower_spillway_count =&lt;br /&gt;
| lower_spillway_type =&lt;br /&gt;
| lower_spillway_capacity =&lt;br /&gt;
| lower_res_name =&lt;br /&gt;
| lower_res_capacity_total =&lt;br /&gt;
| lower_res_capacity_active =&lt;br /&gt;
| lower_res_capacity_inactive =&lt;br /&gt;
| lower_res_catchment =&lt;br /&gt;
| lower_res_surface =&lt;br /&gt;
| lower_res_max_length =&lt;br /&gt;
| lower_res_max_width =&lt;br /&gt;
| lower_res_max_depth =&lt;br /&gt;
| lower_res_elevation =&lt;br /&gt;
| lower_res_tidal_range =&lt;br /&gt;
| plant_name =&lt;br /&gt;
| plant_coordinates = &amp;lt;!-- {{coord|..|..|type:landmark|display=inline}}--&amp;gt;&lt;br /&gt;
| plant_operator =&lt;br /&gt;
| plant_commission =&lt;br /&gt;
| plant_decommission =&lt;br /&gt;
| plant_type =&lt;br /&gt;
| plant_hydraulic_head =&lt;br /&gt;
| plant_turbines =&lt;br /&gt;
| plant_pumpgenerators =&lt;br /&gt;
| plant_pumps =&lt;br /&gt;
| plant_capacity =&lt;br /&gt;
| plant_capacity_factor =&lt;br /&gt;
| plant_efficiency =&lt;br /&gt;
| plant_storage_hours =&lt;br /&gt;
| plant_annual_gen =&lt;br /&gt;
| plant_annual_gen_year =&lt;br /&gt;
| website = {{official website}}&lt;br /&gt;
| extra =&lt;br /&gt;
}}&lt;br /&gt;
[[File:Map Gujarat state and districts.png|thumb|right|320px|The [[Gulf of Khambat]] is at the right-lower-center of the map of Gujarat on the [[Arabian Sea]].]]&lt;br /&gt;
&lt;br /&gt;
The &amp;#039;&amp;#039;&amp;#039;Kalpasar Project&amp;#039;&amp;#039;&amp;#039; or the &amp;#039;&amp;#039;&amp;#039;Gulf of Khambhat Development Project&amp;#039;&amp;#039;&amp;#039; envisages building a 30&amp;amp;nbsp;km [[dam]] across the [[Gulf of Khambat]] in India for establishing a huge fresh water [[coastal reservoir]] for [[irrigation]], drinking and industrial purposes.&amp;lt;ref&amp;gt;{{cite web|title=Efficacy of coastal reservoirs to address India&amp;#039;s water shortage by impounding excess river flood waters near the coast (page 49)|url=http://ojs.udspub.com/index.php/jsupp/issue/viewIssue/51/4|accessdate=9 July 2018|archive-url=https://web.archive.org/web/20180726234122/http://ojs.udspub.com/index.php/jsupp/issue/viewIssue/51/4|archive-date=26 July 2018|url-status=dead}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite web |title=International Association for Coastal Reservoir Research|url=http://iacrr.org/publications|archive-url=https://web.archive.org/web/20180726234508/http://iacrr.org/publications|url-status=usurped|archive-date=26 July 2018|accessdate=9 July 2018}}&amp;lt;/ref&amp;gt; The project with 30 km sea dam will have the capacity to store 10 billion cubic meters fresh water, equating to 25% of Gujarat’s average annual rainwater flow, from the rivers like [[Narmada River|Narmada]], [[Mahi River|Mahi]], [[Dhadhar River|Dhadhar]], [[Sabarmati River|Sabarmati]], [[Bhogavo River|Limbdi-Bhagovo]], and two other minor rivers.&amp;lt;ref name=&amp;quot;t1&amp;quot;/&amp;gt; A 10 lane road link will also be set up over the dam, greatly reducing the distance between [[Saurashtra (region)|Saurashtra]] and [[South Gujarat]].&amp;lt;ref&amp;gt;{{cite web|url=http://www.businesskorea.co.kr/english/news/industry/14131-indian-water-project-south-korea-build-sea-wall-india|title=South Korea to Build Sea Wall in India|date=18 March 2016|accessdate=23 March 2016|archive-date=25 March 2016|archive-url=https://web.archive.org/web/20160325090734/http://www.businesskorea.co.kr/english/news/industry/14131-indian-water-project-south-korea-build-sea-wall-india|url-status=dead}}&amp;lt;/ref&amp;gt; The project, which will create world&amp;#039;s largest freshwater lake in marine environment, will cost INR90,000 crore or US$12.75 billion (2015-16 estimates with 8% annual inflation) excluding the cost of [[Tidal power|tidal power plant]].&amp;lt;ref name=&amp;quot;t2&amp;quot;/&amp;gt; Project entails construction of the main &amp;#039;&amp;#039;&amp;quot;Kalpasar dam&amp;quot;&amp;#039;&amp;#039; across Gulf of Khambat and another [[Bhadbhut barrage]] on [[Narmada River|Narmada river]], as well as a canal connecting the two.&amp;lt;ref name=short1/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Spending began in earnest in 2004,&amp;lt;ref name=&amp;quot;in180221&amp;quot;&amp;gt;{{cite news |last1=Shah |first1=Jumana |title=Gujarat government unclear on Kalpasar Dam project after spending crores |url=https://www.indiatoday.in/india/story/despite-spending-rs-30-71-cr-gujarat-govt-unclear-on-viability-of-kalpasar-dam-project-1174787-2018-02-21 |accessdate=26 December 2018 |publisher=India News |date=21 February 2018}}&amp;lt;/ref&amp;gt; and by 2018 INR 250 crore has been spent on various feasibility studies and surveys.&amp;lt;ref name=&amp;quot;t2&amp;quot;/&amp;gt; By July 2019, 25 of the 43 feasibility studies for the ecological, environmental, social and financial impact, etc were complete; 8 more were underway; remaining 10 surveys will take 3 to 5 years to complete i.e. by 2021-23.&amp;lt;ref name=&amp;quot;t2&amp;quot;/&amp;gt; Detailed Project Report (DPR) was intended to be completed by the end of 2018.&amp;lt;ref name=&amp;quot;t3&amp;quot;&amp;gt;{{Cite news|url=https://timesofindia.indiatimes.com/city/ahmedabad/8-kalpsar-feasibility-studies-still-on-govt/articleshow/70198801.cms|title=Eight Kalpsar feasibility studies still on: Gujarat government&lt;br /&gt;
|date=12 July 2019|newspaper=Times of India|language=en-US|access-date=27 December 2019}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;t1&amp;quot;&amp;gt;{{Cite news|url=https://timesofindia.indiatimes.com/city/ahmedabad/gujarat-water-woes-kalpsar-project-dpr-likely-by-year-end/articleshow/62872660.cms|title=Gujarat water woes: Kalpsar project DPR likely by year end|date=11 February 2018|newspaper=Times of India|language=en-US|access-date=27 December 2019}}&amp;lt;/ref&amp;gt; The project, if found feasible, will take at least 20 years (by 2035-38) to complete including 3 to 5 years pre-construction feasibility studies which are presently underway, and further 12 to 15 years of construction thereafter which has not commenced yet.&amp;lt;ref name=&amp;quot;t2&amp;quot;&amp;gt;{{Cite news|url=https://timesofindia.indiatimes.com/city/ahmedabad/kalpasar-to-take-at-least-20-years-if-found-feasible/articleshow/56633405.cms|title=Kalpasar to take at least 20 years, if found feasible|date=18 January 2017|newspaper=Times of India|language=en-US|access-date=27 December 2019}}&amp;lt;/ref&amp;gt; As of 2018, no environmental or other clearances have been obtained for the Kalpasar dam.&amp;lt;ref name=&amp;quot;t1&amp;quot;/&amp;gt; Meanwhile the construction of the [[Bhadbhut barrage]], which is a smaller component of the project, commenced in 2020.&amp;lt;ref name=update1/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
More than 30,000 MCM of water from [[Narmada River|Narmada river]] alone flows out annually into the sea due to the lack of storage capacity and dams, thus experts have been calling for a review of Gujarat&amp;#039;s Water Policy to expedite the Kalpasar project.&amp;lt;ref name=&amp;quot;t4&amp;quot;&amp;gt;{{Cite news|url=https://timesofindia.indiatimes.com/city/ahmedabad/water-equal-to-four-times-narmada-dam-capacity-flowed-into-the-sea/articleshow/71414168.cms|title=Narmada dam capacity flowed into the sea|date=3 October 2019|newspaper=Times of India|language=en-US|access-date=27 December 2019}}&amp;lt;/ref&amp;gt; Few more similar projects are on anvil to harness the surplus flood waters of Indian rivers.&amp;lt;ref&amp;gt;{{Cite journal |last=Sasidhar |first=Nallapaneni |date=May 2023 |title=Multipurpose Freshwater Coastal Reservoirs and Their Role in Mitigating Climate Change |url=https://www.ijee.latticescipub.com/wp-content/uploads/papers/v3i1/A1842053123.pdf |access-date=2023-12-27 |journal=Indian Journal of Environment Engineering |issn=2582-9289 |volume=3 |issue=1|pages=30–45 |doi=10.54105/ijee.A1842.053123 |s2cid=258753397 }}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Background==&lt;br /&gt;
&lt;br /&gt;
=== Etymology ===&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;Kalpasar&amp;#039;&amp;#039; means a lake that fulfills all the wishes (कल्प+सर). The construction of the word is similar to कल्पवृक्ष, the Hindu mythological ‘[[Kalpavriksha|Kalpa Vriksha]]’ ([[Devanagari]]: कल्पवृक्ष) – wishing tree.&amp;lt;ref name=&amp;quot;:0&amp;quot;&amp;gt;{{Cite news|url=http://newser.in/good-news/kalpsar-project-worlds-largest-lake/|title=Kalpsar Project : World&amp;#039;s Largest Lake|date=18 November 2016|newspaper=Newser|language=en-US|access-date=1 January 2017}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===History===&lt;br /&gt;
&lt;br /&gt;
The Gulf of Khambhat was identified as a promising site for tidal power generation by UNDP Expert, Mr. Eric Wilson in the year 1975. Successive governments were then presented in details the possibility of a project, aptly named Kalpasar Project by its visionary Dr. Anil Kane, who conceptualised it in 80s as a feasible project. In 1988–89 a reconnaissance report was prepared for the dam across the Gulf of Khambhat. The report concluded that, assuming sound foundation conditions, the closure of the Gulf was technically feasible.&amp;lt;ref name=recon1&amp;gt;{{cite web|url=http://www.projectsmonitor.com/daily-wire/work-on-gujarats-kalpasar-project-likely-to-commence-by-next-year/|title=Work on Gujarats Kalpasar project likely to commence by next year|date=27 May 2013 |accessdate=29 May 2014}}&amp;lt;/ref&amp;gt; Studies are still going on and the length of the proposed dam is reduced and the tidal power component is dropped. The cost of project is estimated at {{Indian Rupee}} 85,000 crore as of 2022.&amp;lt;ref&amp;gt;{{Cite news|url=http://environmentclearance.nic.in/writereaddata/Online/TOR/04_Jul_2022_10125319044276867Annexure-Pre-feasibilityReport(PFR).pdf|title=Pre-Feasibility: Report Kalpasar Project|date= June 2022|access-date=11 December 2022}}&amp;lt;/ref&amp;gt; It is reported that the project may take 20 years to complete if found feasible and approved.&amp;lt;ref&amp;gt;{{Cite news|url=http://timesofindia.indiatimes.com/city/ahmedabad/kalpasar-to-take-at-least-20-years-if-found-feasible/articleshow/56633405.cms|title=Kalpasar to take at least 20 years, if found feasible – Times of India|work=The Times of India|access-date=15 July 2017}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Project details ==&lt;br /&gt;
&lt;br /&gt;
=== Objectives ===&lt;br /&gt;
&lt;br /&gt;
Kalpasar aims at the creation of a [[fresh water]] coastal reservoir in the [[Gulf of Khambhat]] by the construction of a dam connecting the east and west bank of the Gulf. In the reservoir the runoff from [[Sabarmati River|Sabarmati]], [[Mahi River|Mahi]], [[Dhadhar River|Dhadar]] and [[Narmada River|Narmada]] will be stored, together with the waters from the [[Saurashtra (region)|Saurashtra]] rivers discharging into the [[Gulf of Khambhat]]. The stored waters are to be used for irrigation, domestic and industrial water requirements in the [[Saurashtra (region)|Saurashtra region]].&amp;lt;ref&amp;gt;{{cite web |title=India is not running out of water, water is running out of India|date=26 March 2017 |url=https://www.deccanchronicle.com/opinion/op-ed/260317/by-invitation-india-is-not-running-out-of-water-water-is-running-out-of-india.html|accessdate=9 July 2018}}&amp;lt;/ref&amp;gt; Kalpasar is considered the evident solution for solving on the short as well as on the long term the threatening drinking and irrigation water problems in [[Saurashtra (region)|Saurashtra]].&lt;br /&gt;
&lt;br /&gt;
Once the Gulf is closed, water levels within the reservoir can be controlled while the [[Tide|tidal]] fluctuation outside the reservoir continues and, hence, can be harnessed for the generation of [[Tidal power|tidal energy]].&lt;br /&gt;
&lt;br /&gt;
In addition to fresh water storage and [[tidal power]] generation, Kalpasar also aims at land reclamation, transportation improvements and fisheries development. In accordance with this project, a mega fresh water reservoir will be constructed on the upstream side of the dam by impounding the surplus waters of numerous rivers.&lt;br /&gt;
&lt;br /&gt;
This project, will resolve four vital problems of the [[Gujarat|State of Gujarat]] which are water, electrical power, road-rail transport and development of ports.&amp;lt;ref name=&amp;quot;:0&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===Scope and cost===&lt;br /&gt;
&lt;br /&gt;
====Abandoned original plan and scope====&lt;br /&gt;
[[File:Kalpsar3.jpg|thumb|Map of old proposal scope with larger 64 km long Kalpasar dam and tidal power plant, no longer valid.]]&lt;br /&gt;
&lt;br /&gt;
The original plan envisaged a larger dam along with a tidal power plant. &lt;br /&gt;
&lt;br /&gt;
A [[Government of Gujarat|state government]] release said the Rs 55,000 crore (US$11.7 billion) project, to be completed by 2020, will have a vast fresh water reservoir with gross storage of 16,791 million cubic metres of water, 64&amp;amp;nbsp;km long dam across the Gulf of Khambhat connecting [[Ghogha]] in [[Bhavnagar]] with [[Hansot]] in [[Bharuch District]], reducing the distance between the two by 225&amp;amp;nbsp;km. It will have tidal power generation house with an installed capacity of 5,880 [[megawatt|MW]]. Another estimate was given by the Government in October 2010 which stated the proposed dam to be built just north of [[Bhavnagar]] in the west to Alandar in [[Dahej]] on the east.&amp;lt;ref&amp;gt;{{cite news|url=http://timesofindia.indiatimes.com/india/Gujarat-plans-first-over-the-sea-dam/articleshow/6811046.cms|title=Gujarat plans first over the sea dam|newspaper=The Times of India |date=25 October 2010 |accessdate=29 May 2014}}&amp;lt;/ref&amp;gt; In 2017, the revised project plan reduced the size of lake with only 30 km sea dam instead of original plan of 64 km long dam.&amp;lt;ref name=short1/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==== Revised and reduced current scope ====&lt;br /&gt;
[[File:Kalpasar Dyke Project.jpg|thumb|Map of the new and revised Proposed Kalpasar Project ]]&lt;br /&gt;
In 2017 the scope and size of the dam project was reduced, instead of a longer Kalpasar dam across the Gulf of, it will now have a shorter Kalpasar dam across the Gulf of Khambat along with another [[Bhadbhut barrage]] on Narmada river and a canal connecting these two.&amp;lt;ref name=short1/&amp;gt; The Tidal power project has been dropped from the scope,&amp;lt;ref name=short1/&amp;gt; which could be taken up as a separate project.&lt;br /&gt;
&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Kalpasar dam&amp;#039;&amp;#039;&amp;#039;: The size of Kalpasar dam has been reduced by shifting the alignment towards north, from [[Kala Talav]] village in [[Bhavnagar district]] to [[Aladar]] village north of [[Port of Dahej]] in [[Bharuch district]].&amp;lt;ref name=short1/&amp;gt; &lt;br /&gt;
&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;[[Bhadbhut barrage]]&amp;#039;&amp;#039;&amp;#039;: Since the alignment of &amp;#039;&amp;#039;&amp;quot;Kalpasar dam&amp;quot;&amp;#039;&amp;#039; has been moved further north, the [[Narmada River]] will not flow directly into the Kalpasar dam. Instead Narmada&amp;#039;s water will be diverted to Kalpasar dam by constructing another 1.7 km long [[causeway]]-cum-[[weir]] barrage of 600 million cubic meter storage capacity 25 km upstream of Narmada&amp;#039;s mouth before it enters the sea near [[Bhadbhut]] in Bharuch district.&amp;lt;ref name=short1/&amp;gt;&amp;lt;ref name=short2&amp;gt;[https://timesofindia.indiatimes.com/city/ahmedabad/state-protests-waterway-bodys-plan-to-repurpose-badhbhut-barrage/articleshow/67934902.cms Gujarat protests waterway body’s plan to repurpose Badhbhut barrage], Times of India, 11 February 2019.&amp;lt;/ref&amp;gt;&amp;lt;ref name=short3&amp;gt;[https://timesofindia.indiatimes.com/city/surat/bhadbhut-barrage-only-solution-to-salinity-ingress-in-narmada/articleshow/65494235.cms ‘Bhadbhut barrage only solution to salinity ingress in Narmada], Times of India, 22 April 2018.&amp;lt;/ref&amp;gt; This barrage help prevent [[saltwater intrusion]] in Narmada River.&amp;lt;ref name=short3/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;[[Bhadbhut-Kalpasar canal]]&amp;#039;&amp;#039;&amp;#039;: To transfer the water of narmada river from &amp;#039;&amp;#039;&amp;quot;Bhadbhut barrage&amp;quot;&amp;#039;&amp;#039; to &amp;#039;&amp;#039;&amp;quot;Kalpasar dam&amp;quot;&amp;#039;&amp;#039;, a new 30&amp;amp;nbsp;km long canal with one lac [[cusec]]s water carrying capacity will be constructed from &amp;#039;&amp;#039;&amp;quot;Bhadbhut barrage&amp;quot;&amp;#039;&amp;#039; to &amp;#039;&amp;#039;&amp;quot;Kalpasar dam&amp;quot;&amp;#039;&amp;#039;.&amp;lt;ref name=short1/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;Kalpasar irrigation command and channels&amp;#039;&amp;#039;&amp;#039;: Various canals and channels will be built in the [[Saurashtra (region)|Saurashtra]] to irrigate the farms from &amp;#039;&amp;#039;&amp;quot;Kalpasar dam&amp;quot;&amp;#039;&amp;#039;.&amp;lt;ref name=short1&amp;gt;{{cite news|url=http://timesofindia.indiatimes.com/city/ahmedabad/kalpasar-to-take-at-least-20-years-if-found-feasible/articleshow/56633405.cms|title=Kalpasar to take at least 20 years, if found feasible|newspaper=The Times of India |date=18 January 2017 |accessdate=29 June 2017}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;[https://www.google.com/maps/dir/Kala+Talav,+Gujarat,+India/Aladar,+Gujarat,+India/Bhadbhut,+Gujarat,+India/@22.1004279,71.9807118,9z/data=!3m1!4b1!4m20!4m19!1m5!1m1!1s0x395f4f8974ca8609:0x95f25fb0e54071e1!2m2!1d72.1401322!2d21.8469266!1m5!1m1!1s0x395f79ae40147d2f:0xbac4e33b2fbe1781!2m2!1d72.6683333!2d21.8342294!1m5!1m1!1s0x3be029b65fba9253:0xe08f81c063f2e33a!2m2!1d72.8441629!2d21.6843454!3e0 Current/new alignment map]&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
=== Issues ===&lt;br /&gt;
Narmada river one of the [[List of National Waterways in India|111 waterways in India]] which facilitate the [[water transport in India]], the currently design of Bhadhut barrage by the [[Government of Gujarat|Gujarat government]] would allow only lower capacity class III ships where as the union water transport ministry notification envisages higher capacity class IV ships, consequently union government has asked [[Government of Gujarat|Gujarat government]] to upgrade the design of the barrage and shipping locks to facilitate the navigation of larger class IV ships.&amp;lt;ref name=short2/&amp;gt; &lt;br /&gt;
&lt;br /&gt;
There are other ecological and environmental issues to be addressed as part of various feasibility studies being undertaken.&lt;br /&gt;
&lt;br /&gt;
=== Current status ===&lt;br /&gt;
; Planning stage&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;1975-2004 Endless wait due to poor planning and slow pace of implementation:&amp;#039;&amp;#039;&amp;#039; Conceived in 1975, reconnaissance in 1988–89 and with construction expected to commence in 2012, is a much delayed project.&amp;lt;ref name=recon1/&amp;gt;&amp;lt;ref&amp;gt;{{cite web|url=http://sandrp.in/dams/Why_Modis_54000_crore_legacy_project_KALPSAR_is_doomed_Nov_2010.pdf|title=Modi&amp;#039;s hankering for illusory legacy of mega water project|accessdate=29 May 2014|archive-url=https://web.archive.org/web/20140821011137/http://sandrp.in/dams/Why_Modis_54000_crore_legacy_project_KALPSAR_is_doomed_Nov_2010.pdf|archive-date=21 August 2014|url-status=dead}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
; Feasibility surveys stage&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;2004 - spending began on feasibility surveys:&amp;#039;&amp;#039;&amp;#039;, but work was delayed amid questions about feasibility.&amp;lt;ref name=&amp;quot;in180221&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;2014-17 - ongoing surveys:&amp;#039;&amp;#039;&amp;#039; The entire [[Gulf of Khambhat]] area was undergoing [[Bathymetry|Bathymetric]] and Land Survey for determining sea bed levels under the supervision of [[National Institute of Ocean Technology]] (NIOT, [[Chennai]]).&amp;lt;ref&amp;gt;{{cite web|url=http://www.kalpasarproject.com|title=Kalpasar Project|accessdate=29 May 2014|archive-url=https://web.archive.org/web/20140223092926/http://www.kalpasarproject.com/|archive-date=23 February 2014|url-status=dead}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite web|url=http://newser.in/good-news/kalpsar-project-worlds-largest-lake/|title=Kalpasar Project (Yojana) : World&amp;#039;s Largest Lake|date=18 November 2016 |accessdate=29 June 2017}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;2019 - 25 surveys out of 43 completed, 8 underway, 10 yet to commence:&amp;#039;&amp;#039;&amp;#039; By July 2019, 25 of the 43 feasibility studies for the ecological, environmental, social and financial impact, etc were complete; 8 more were underway; remaining 10 surveys will take 3 to 5 years to complete i.e. by 2021-23.&amp;lt;ref&amp;gt;{{cite web|url=https://repository.tudelft.nl/islandora/object/uuid%3A3ab48021-40fb-47c0-b9d4-995d868ffc3a|title=Hydraulic and morphological impact of a closure dam in the Gulf of Khambhat|accessdate=15 December 2022}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;t2&amp;quot;/&amp;gt; Detailed Project Report (DPR) was intended to be completed by the end of 2018.&amp;lt;ref name=&amp;quot;t3&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
; Construction stage&lt;br /&gt;
* Tenders for the &amp;#039;&amp;#039;&amp;quot;Bhadhut barrage&amp;quot;&amp;#039;&amp;#039; will be issued by December 2019 and construction will commence in 2020.&amp;lt;ref name=update1&amp;gt;[https://timesofindia.indiatimes.com/city/surat/cm-lays-foundation-for-100mld-desalination-plant-in-dahej/articleshow/72312824.cms Gujarat CM Vijay Rupani lays foundation for 100MLD desalination plant in Dahej], Times of India, 1 December 2019.&amp;lt;/ref&amp;gt; The construction of main &amp;#039;&amp;#039;&amp;quot;Kalpasar dam&amp;quot;&amp;#039;&amp;#039; Will take 12 to 15 years, once the construction commences only after 2021-23.&lt;br /&gt;
&lt;br /&gt;
== Other water projects in the area ==&lt;br /&gt;
In December 2019, Chief Minister [[Vijay Rupani|Vijaybhai Rupani]] laid the foundation stone for the 100 MLD water desalination plant in Dahej - which will be operational by 2022 - and 8 more such desalination plants will be built in [[Gujarat]] to meet the water needs of the state&amp;#039;s industry.&amp;lt;ref name=update1/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==See also==&lt;br /&gt;
{{stack|{{Portal|India|Water|Renewable energy}}}}&lt;br /&gt;
{{div col|colwidth=15em}}&lt;br /&gt;
* Similar projects&lt;br /&gt;
** [[Polavaram Project]], under construction in India&lt;br /&gt;
** [[Saemangeum Seawall]], functional in Korea&lt;br /&gt;
** [[Indian Rivers Inter-link]]&lt;br /&gt;
&lt;br /&gt;
* Lists&lt;br /&gt;
** [[Dissolved load|List of rivers by dissolved load]]&lt;br /&gt;
** [[List of drainage basins by area]]&lt;br /&gt;
** [[List of rivers of India by discharge]]&lt;br /&gt;
** [[List of rivers by discharge]]&lt;br /&gt;
** [[List of dams and reservoirs in India]]&lt;br /&gt;
&lt;br /&gt;
* Water management in India&lt;br /&gt;
** [[Environment of India]]&lt;br /&gt;
** [[Groundwater#India|Ground water in India]]&lt;br /&gt;
** [[Interstate River Water Disputes Act]]&lt;br /&gt;
** [[Irrigation in India]]&lt;br /&gt;
** [[National Water Policy]]&lt;br /&gt;
** [[Water scarcity in India]]&lt;br /&gt;
** [[Water supply and sanitation in India]]&lt;br /&gt;
** [[Water pollution in India]]&lt;br /&gt;
{{div col end}}&lt;br /&gt;
&lt;br /&gt;
== References ==&lt;br /&gt;
; Citations&lt;br /&gt;
{{Reflist}}&lt;br /&gt;
&lt;br /&gt;
== External links ==&lt;br /&gt;
* {{official website}}&lt;br /&gt;
&lt;br /&gt;
{{-}}&lt;br /&gt;
{{Hydrography of Gujarat}}&lt;br /&gt;
{{Power stations of Gujarat}}&lt;br /&gt;
{{Authority control}}&lt;br /&gt;
&lt;br /&gt;
[[Category:Water supply infrastructure in India]]&lt;br /&gt;
[[Category:Power stations in Gujarat]]&lt;br /&gt;
[[Category:Tidal power stations in India]]&lt;br /&gt;
[[Category:Proposed tidal power stations]]&lt;br /&gt;
[[Category:Gulf of Khambhat]]&lt;br /&gt;
[[Category:Dams in Gujarat]]&lt;br /&gt;
[[Category:Proposed dams in India]]&lt;br /&gt;
[[Category:Proposed renewable energy power stations in India]]&lt;/div&gt;</summary>
		<author><name>DwainKilgore21</name></author>
	</entry>
</feed>