Pink Line 6 of the Mumbai Metro, or the Swami Samarth Nagar-Jogeshwari-Vikhroli-Kanjurmarg Line, is part of the metro system for the city of Mumbai, India. This line is fully elevated.
Plans
The 14.47 km long Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg (Pink Line) is to have 13 stations and cost Rs. 6,672 crore. It is to be an elevated corridor.
It is to connect Swami Samarth Nagar-Lokhandwala in Andheri in the western suburbs to Vikhroli and Kanjurmarg in the eastern suburbs. The stations include Lokhandwala Complex, Adarsh Nagar, Momin Nagar, Jogeshwari-Vikhorli Link Road, Shyam Nagar, Mahakali Caves, SEEPZ Village, Saki Vihar Road, Ram Baug, Powai Lake, IIT Powai, Kanjurmarg (W) and Vikhroli - Eastern Express Highway. Pink Line is to provide interchange with Yellow Line at Adarsh Nagar, with Aqua Line at SEEPZ, with Green Line at Kanjurmarg (West), with Red Line at Jogeshwari Vikhroli Link Road and the Mumbai Suburban Railway at Jogeshwari on Western Railways and Kanjurmarg on Central Railway. Construction is to begin by December 2018.[1] [2] It is to be ready by 2021–22.[3]
Construction
The line was approved by Chief Minister Fadnavis on 19 October 2016. The MMRDA issued a tender to conduct a detailed aerial mapping survey of the alignment in April 2017. Authorities were to determine the location of trees along the alignment with an accuracy of up to 10 cm, utilizing a differential GPS (DGPS), while a digital aerial triangulation system is to help determine the types of trees, their heights and diameters.[4]
Current status
| Sr. No. | Name of Work | Description | Status as of[5] | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 21 May 2019 | July 2019 | Sep 2019 | Oct 2019 | Nov 2019 | Dec 2019 | Jan 2020 | 07 Sep 2020 | 01 Nov 2020 | 01 Mar 2021 | |||||
| 1 | Soil Investigation Works | soil investigation work for pier foundation completed | 39.4% | 45.1% | 58% | 70.66% | 73.84% | 80.79% | 82.18% | 83.26% | 85.82% | 94.18% | ||
| 2 | Utility Works | Works completed | 25.2% | 30.0% | 36.6% | 49.53% | 53.01% | 56.17% | 56.45% | 56.70% | 59.58% | 65.14% | ||
| 3 | Piling Works | piling work for foundations completed | 7.8%% | 9.9% | 14.10% | 18.32% | 23.64% | 30.25% | 33.37% | 45.55% | 48.36% | 59.01% | ||
| 4 | Pile Cap Works | Pile Cap work completed | 0.5% | 0.9% | 2.05% | 4.16% | 6.71% | 11.63% | 14.75% | 28.28% | 34.32% | 48.62 | ||
| 5 | Pier Works | Pier work completed | 0.52 | 2.14% | 3.35% | 5.67% | 7.03% | 19.79% | 24.42% | 37.12% | ||||
| 6 | Station Work | Work is in progress at all the 13 stations | Swami Samarth Nagar, Adarsh Nagar,Jogeshwari (West), Jogeshwari-Vikhroli Link Road, Shyam Nagar,Mahakali Caves, SEEPZ Village, Saki Vihar Road, Rambaug, Powai Lake, IIT Powai, Kanjurmarg (West), Vikhroli (EEH) | 15.82% | 18.00% | |||||||||
Stations
The line will consist of 13 stations starting from Swami Samarth Nagar in Lokhandwala Complex, Andheri (West) to Vikhroli (East). It will have interchanges with Lines 2, 7, 3 and 4.[6]
| Pink Line 6 | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| # | Station Name | Status | Interstation Distance | Connections | Layout | ||||
| English | Marathi | ||||||||
| 1 | Template:Metro | स्वामी समर्थ नगर (लोखंडवाला) | Under Construction | Template:Cvt | None | Elevated | |||
| 2 | Adarsh Nagar | आदर्श नगर | Under Construction | Template:Cvt | Template:Color box (Under Construction) | Elevated | |||
| 3 | Template:Metro | जोगेश्वरी (पश्चिम) | Under Construction | Template:Cvt | Jogeshwari railway station, Western Line (Mumbai Suburban Railway) |
Elevated | |||
| 4 | Template:Metro | जेवीएलआर जंक्शन | Under Construction | Template:Cvt | Template:Color box (Under Construction) | Elevated | |||
| 5 | Shyam Nagar | श्याम नगर | Under Construction | Template:Cvt | None | Elevated | |||
| 6 | Template:Metro | महाकाली लेणी | Under Construction | Template:Cvt | None | Elevated | |||
| 7 | Template:Metro | सीप्झ गाव | Under Construction | Template:Cvt | Template:Color box (Under Construction) | Elevated | |||
| 8 | Template:Metro | साकी विहार रोड | Under Construction | Template:Cvt | None | Elevated | |||
| 9 | Template:Metro | रामबाग (पवई) | Under Construction | Template:Cvt | None | Elevated | |||
| 10 | Template:Metro | पवई तलाव | Under Construction | Template:Cvt | None | Elevated | |||
| 11 | Template:Metro | आयआयटी पवई | Under Construction | Template:Cvt | None | Elevated | |||
| 12 | Template:Metro | कांजूरमार्ग (पश्चिम) | Under Construction | Template:Cvt | Template:Color box (Under Construction), Kanjurmarg railway station, Central Line (Mumbai Suburban Railway) |
Elevated | |||
| 13 | Template:Metro | विक्रोली इइएच | Under Construction | Template:Cvt | None | Elevated | |||
References
- ↑ Work on Mumbai’s Metro-6 corridor to kick off by December. hindustantimes.com. Retrieved 13 August 2018.
- ↑ Mumbai: MMRDA plans to begin work on five more Metro lines by December. The Indian Express(7 April 2017). Retrieved 7 April 2017.
- ↑ Mumbai’s east-west connectivity to get a boost with another Metro corridor. hindustantimes.com(2 March 2017). Retrieved 2 March 2017.
- ↑ MMRDA to begin tree count for Metro 6. mid-day. Retrieved 6 April 2017.
- ↑ https://mmrda.maharashtra.gov.in/its#
- ↑ DPR for Line 6. MMRDA.