Created by ZI Jony
Last edited August 5, 2021

Template:More citations needed


Template:Infobox road Ambala Chandigarh Expressway is four-lane 35 km long,[1] high-traffic density corridor of Ambala-Chandigarh section (km 5.735 to km 39.960 on NH-152 and 0 km to 0.871 km on NH 5) on BOT basis, was completed in 30 months at a cost of Template:INRConvert[2] The expressway has been operational since December 2009 and was constructed by the GMR Group with assistance from the World Bank.

38 km south of Ambala at existing NH152 (Ambala-Pehowa-Narwana-Fatehabad-Sirsa), it connects with under-construction controlled access tolled Ambala–Narnaul Expressway (Trans-Haryana Expressway).

See also

References

  1. Roads-GMR Ambala-Chandigarh Expressways Private Limited. Gmrgroup.in. Retrieved 26 July 2010.
  2. In fast lane, NHAI inks pact to widen Chandigarh section. Financialexpress.com(19 November 2005). Retrieved 19 August 2010.