Template:Infobox rail line Blue Line, also known as North–South Metro, is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. It consists of 26 operational stations from Dakshineswar to Kavi Subhash, out of which 9 of the stations are elevated, 2 are at-grade and the remaining 15 are underground. With a total distance of Template:Convert, the line connects Dakshineswar and New Garia and uses Template:Track gauge broad gauge tracks. This line was the first underground railway to be built in India, with the first operations commencing in October 1984 and the full stretch that was initially planned being operational by February 1995. On 28 December 2010, Kolkata Metro became the 17th zone of the Indian Railways.[1] Being the country's first, and a completely indigenous process, the construction of the Kolkata Metro Blue Line was more of a trial-and-error affair, in contrast to the Delhi Metro, which has seen the involvement of numerous international consultants. As a result, it took nearly 23 years to completely construct around Template:Convert underground railway from Birpara up to Tollygunge.

It connects Green Line at Esplanade and Orange at Kavi Subhash, and will eventually connect Purple Line at Esplanade and Park Street, Yellow Line at Noapara and Pink Line at Baranagar.

Future Extensions

Public transport experts have suggested that the line be extended from Dakshineswar to Bally (where it can connect with Howrah Division of Kolkata Suburban Railway) and eventually to Dankuni, an emerging industrial hub of Kolkata metropolitan region.

History

File:The Prime Minister, Shri Narendra Modi inaugurates the several railway projects, in West Bengal on February 22, 2021 (3).jpg
Prime Minister Narendra Modi inaugurating the Noapara-Dakshineswar stretch of Blue Line on February 22, 2021.

The laying of the founding stone was done in 1972, but actual construction of Blue Line started only in 1978. Blue Line is Template:Convert long with 26 stations (see above). Running of the first metro car on the line by 1984 was considered a great engineering challenge. Former railways minister A. B. A. Ghani Khan Chowdhury took a massive effort to perform it. The first section opened between Esplanade & Bhawanipore (now called Netaji Bhawan). First day Metro Railway Kolkata was started by Sri Tapan Kumar Nath and Sri Sanjay Sil. There were no connections of this stretch with the two depots at Dum Dum & Tollygunge (Now called Mahanayak Uttam Kumar). So metro cars had to be put down on the track near Esplanade by crane, by directly digging the road surface. Initially, only four-car trains were run until 1986. There were no magnetic gates or escalators at that time and ordinary revolving gates served as exits. The Metro too operated on only a single line. Two years later, Blue Line extended up to Tollygunge, at the southern end. At the same time, the metro service was extended to the double line. Magnetic tickets and more entry gates were also introduced at that time. The number of compartments in each train was increased to eight.

Metro service was also started from Dum Dum, at the northern end, to Belgachia in parallel with the extension of the line to the south. But this short portion was not popular and the service was closed down to be restarted when the entire stretch along the north–south corridor was completed.

After 1986 many political incidents hampered the construction, and work almost stopped for nearly six years. After restarting work, the Dum Dum to Shyambazar metro service was started in 1994. This portion was served by four-car trains. Two months later, the Esplanade – Chandni Chowk section was opened and Chandni Chowk – Central section opened three months later. The service from Dum Dum to Tollygunge started in 1995, with Mahatma Gandhi Road metro station, opening in 1996. During this time, more magnetic gates and escalators were added and the revolving gates were slowly phased out.

In 2009, a large number of stations on Blue Line were renamed by then Minister of Railways Mamata Banerjee.[2]

On 22 February 2021, the Noapara – Dakshineswar stretch was inaugurated by Prime Minister Narendra Modi.

On 21 July 2024, the entire stretch from Dakshineswar to Kavi Subhash, crossed 1.92 lakh passenger mark for the first time on a single day.[3]

On 28 July 2025, cracks were detected in the last four columns of the Line-1 Up platform at Kavi Subhash station, the line's southern terminus. So, the Line-1 platforms of the station were closed to passengers as a safety measure and the trains are being terminated at Shahid Khudiram station. However, the empty rakes would continue to run up to the station for reversal and maintenance at its depot.[4]On investigation, it was found that the damage on the columns supporting the platforms were weakened beyond repair. So, Metro Authorities decided to raze the entire Line-1 complex of the station (keeping the tracks intact) and rebuild it. E-tenders were floated and the work is expected to be completed within ten months.[5]

Timeline

The following dates represent the dates the section opened to the public, not the private inauguration.

colspan="4" style="background:#Template:Rail color;" | History
Extension date Terminals Length
24 October 1984 Esplanade Bhowanipore Template:Convert
12 November 1984 Dum Dum Belgachhia Template:Convert
29 April 1986 Bhowanipur (now Netaji Bhavan) Tollygunge (now Mahanayak Uttam Kumar) Template:Convert
13 August 1994 Belgachhia Shyambazar Template:Convert
2 October 1994 Esplanade Chandni Chowk Template:Convert
19 February 1995 Shyambazar Girish Park Template:Convert
19 February 1995 Chandni Chowk Central Template:Convert
27 September 1995 Central Girish Park Template:Convert
22 August 2009 Tollygunge (Mahanayak Uttam Kumar) Garia Bazar (now Kavi Nazrul) Template:Convert
7 October 2010 Garia Bazar (now Kavi Nazrul) New Garia (now Kavi Subhash) Template:Convert
10 July 2013 Dum Dum Noapara Template:Convert
22 February 2021 Noapara Dakshineswar Template:Convert
Total Dakshineswar New Garia (now Kavi Subhash)Template:Efn Template:Convert

Stations

Template:Main

The stations of this Line are: The stations of this Line are:

colspan="8" style="background:#Template:Rail color;" |Blue Line
# Station Name Distance (km) Opening Connections Layout Platform Type
English Bengali
1 Dakshineswar দক্ষিণেশ্বর 0 22 February 2021 Template:Rint Dakshineswar

Template:Rint Ma Bhabotarini Jetty Ghat

Elevated Side
2 Baranagar বরাহ নগর 1.759 Template:Rint (Proposed)

Template:Rint Baranagar Road

3 Noapara নোয়াপাড়া 2.38 10 July 2013 Template:Rint Side & Island
4 Dum Dum দমদম 2.091 12 November 1984 Template:Rint Dum Dum Jn Side
5 Belgachia বেলগাছিয়া 2.151 Underground Island
6 Shyambazar শ্যামবাজার 1.625 15 February 1995
7 Shobhabazar Sutanuti শোভাবাজার সুতানুটি 0.929
8 Girish Park গিরিশ পার্ক 1.001
9 Mahatma Gandhi Road মহাত্মা গান্ধী রোড 0.766 27 September 1995
10 Central সেন্ট্রাল 1.037 15 February 1995
11 Chandni Chowk চাঁদনি চক 0.598
12 Esplanade এসপ্ল্যানেড 0.705 24 October 1984 Template:Rint (Under Construction)

Template:Rint Template:Rint

13 Park Street পার্ক স্ট্রীট 0.808 Template:Rint (Under Construction) Side
14 Maidan ময়দান 1.536 Island
15 Rabindra Sadan রবীন্দ্র সদন 1.015
16 Netaji Bhavan নেতাজি ভবন 0.848
17 Jatin Das Park যতীন দাস পার্ক 1.033 29 April 1986
18 Kalighat কালীঘাট 0.621
19 Rabindra Sarobar রবীন্দ্র সরোবর 1.864 Template:Rint Tollygunge
20 Mahanayak Uttam Kumar মহানায়ক উত্তম কুমার 1.344 Template:Rint (Proposed) At Grade Side & Island
21 Netaji নেতাজি 1.814 22 August 2009 Elevated Side
22 Masterda Surya Sen মাস্টারদা সূর্য সেন 1.722
23 Gitanjali গীতাঞ্জলি 1.053
24 Kavi Nazrul কবি নজরুল 1.245
25 Shahid Khudiram শহিদ ক্ষুদিরাম 1.275 7 October 2010
26 Kavi Subhash

(Under Construction)

(Trains terminate at Shahid Khudiram temporarily)

কবি সুভাষ 0.91 Template:Rint

Template:Rint New Garia

At Grade
File:Kolkata Metro.jpg
Kolkata Metro rake on the north–south line.

Alignment & interchanges

Dakshineswar, Baranagar, Dum Dum, Noapara, Park Street, Mahanayak Uttam Kumar, Netaji, Masterda Surya Sen, Gitanjali, Kavi Nazrul, Shahid Khudiram and Kavi Subhash have side platforms; all other stations have island platforms. Mahanayak Uttam Kumar is an exception as it has both platforms on the sides as well as in the centre. Dakshineswar, Baranagar, Dum Dum, Rabindra Sarobar & Kavi Subhash have connections to interchange with Kolkata Suburban Railway. Shyambazar, Mahatma Gandhi Road, Esplanade, Kalighat. The EM Bypass can be accessed from the Shahid Khudiram metro station and Kavi Subhash metro station.

Extension up to New Garia (2010)

Mamata Banerjee during her first tenure as the railway minister initiated the project of Tollygunge – Garia metro extension. During her second tenure (2009–2011) she inaugurated the extension, and also introduced new Air Conditioned rakes, manufactured indigenously at the Integral Coach Factory.

The new extension to Garia Bazar in the south opened to the public on 23 August 2009. The Garia Bazar station was named after Kavi Nazrul. A final extension, in the southern end, from Kavi Nazrul (Garia Bazar) to Kavi Subhash (New Garia) was inaugurated on 7 October 2010, bringing the total number of stations to 23. On the same day, two Air-Conditioned rakes were also pressed into service.

Extension up to Noapara (2013) and Dakshineswar (2021)

The line was extended up to Noapara from Dum Dum on 10 July 2013. The line was further extended from Noapara to Dakshineswar (4.1 km) is now complete & operational. It will be met by a metro line from Barrackpore at Baranagar (12.5 km).[6] Trial runs for this stretch started on 23 December 2020, after delay due to COVID-19 pandemic. The stretch was inaugurated on 22 February 2021 & commercial operations began from the following day.[7]

The stations on this stretch are :

  1. Noapara
  2. Baranagar
  3. Dakshineswar

Features

Technical features

File:Kolkata Metro CRRC Dalian rake 3.jpg
Rake at Girish Park metro station.

Metro construction is of a very complex nature requiring the application of several new technologies in the fields of civil, electrical, signaling and telecommunication engineering. Indian engineers backed by their own experience and supplemented by their studies abroad adopted advanced technologies in the following fields for the first time in India.

  • Cut and cover method of construction using diaphragm walls and sheet piles.
  • Use of extensive decking to keep the traffic flowing over the cut while construction is in progress underneath.
  • Shield tunneling using compressed air and airlocks.
  • Ballastless track using elastic fastenings, rubber pads, epoxy mortar and nylon inserts.
  • Air-conditioning and ventilation system for environmental control of stations and tunnels.
  • Third Rail current collection system for traction.
  • Underground substations with dry-type transformers and SF6 circuit breakers.
  • Tunnel-Train VHF-radio communication system.
  • Microprocessor-based train control and supervisory remote control system for substations.
  • Automatic ticket vending and checking system.

Salient features

Total route length Template:Convert
Stations 26 (15 underground, 2 on the surface and 9 elevated)
Gauge Template:Convert, Indian Broad Gauge
Cars per train 8
Maximum permissible speed Template:Convert
Average speed Template:Convert
Voltage 750 V D.C.
Method of current collection Third Rail
Travel Time: Dakshineswar to Kavi Subhash 62 minutes (approx.)
Headways Average 10 minutes
Total estimated cost of the project Template:INRConvert (approx.)
Environment control Air conditioners are used in all trains.

Proposed Feature and Expansion

Platform Screen Doors (PSDs) are a system of full height/half height motorized sliding doors that provide controlled access to the trains and protect the platform edge. PSD work is proposed for all stations in this line to minimize accidents common in this route. This plan was proposed after the successful utilization of Platform Screen Doors to keep the number of suicidal cases on the Green Line to absolute zero.[8]

Metro Railway also plans to extend the platform and viaduct of Dakshineswar metro station by ~Template:Cvt via erection of two new pillars beyond the current length to facilitate a crossover so that the trains can switch tracks faster in order to increase the frequency of services to the Noapara–Dakshineswar stretch.[9]

Rolling stock

Template:Main

File:KolkataMetro3000siries.JPG

ICF/MEDHA

Template:Infobox train

Template:Infobox train There was a need to replace non-AC rakes on Blue line and so during mid 2015 it was announced that Indian Railways for the first time would rope an international train-maker, China Railway Rolling Stock Corporation (CRRC) based in Dalian.[10] As per the tender, 14 new rakes composed of 8 coaches each will be supplied to Kolkata Metro by CNR Dalian, a subsidiary of CRRC Dalian, which will be running on Blue Line. These rakes will be of ultra-modern technology. They will have doors that will be Template:Cvt wider than any other metro rails in India. They will have wide vestibules, Template:Convert wider than the existing trains. The design consists of the aerodynamic front with large doors and LED Lights, and violet colored stripe on silver color body. These rakes are capable of a top speed of Template:Cvt. The first of the 14 rakes from Chinese firm Dalian was slated to arrive by December 2017 but got delayed due to various reasons. The first rake finally arrived in Kolkata on 3 March 2019 on a vessel at Netaji Subhash dock of Kolkata port.[11] Each of the 8 coaches of the rake weigh nearly 45 tonnes. The rake was unloaded and taken to Noapara Carshed, after which trial runs and inspection would be carried out before commencing operations. Other 13 rakes are ready, but the shipment got delayed due to the ongoing coronavirus pandemic.

These rakes were under performance trials for more than 20 months as serious problems related to performance of the rake were identified during trials. Some of the issues related to insufficient power to climb up the slopes in the tunnels and higher oscillation in the bogie.[12][13]

On 17 March 2023, the first Dalian rake was inducted into service. Another 3 rakes will arrive soon.

Old fleet

File:KolkataMetroOldCoaches.jpg
Kolkata Metro Old fleet, Discontinued in 2021

The whole fleet is vestibuled. Carbodies and mechanical components were made by ICF with electrical components made by NGEF, Bangalore. The fleet is unique in that it is the only railroad equipment in India with end-mounted cab doors (except for some of the WAG-6 series locomotives).

ICF has specifically designed, manufactured and supplied these cars for the first underground railway system. The special features incorporated are:

  • Traction power supply through third rail current collection system.
  • Automatic door opening/closing and continuous monitoring of the transit.
  • Automatic Train Stop (ATS) system which will automatically apply the brakes in case of human failure.
  • Automatic train operation (ATO) with the driver acting as the train supervisor (optional).
  • A public address system is provided on the trains to announce approaching stations. A central dispatcher can contact any of the train crew and also make important announcements directly to passengers over the system.

With all these features, the design and manufacturing process of these cars to a very high standard of reliability and safety has been a challenge. This was achieved without any technical collaboration.

Reservation for women

In 2008, the Kolkata Metro Railway experimented with the practice of reserving two entire compartments for women.[14]

This system was found to be ineffective and caused inconvenience for a lot of commuters (including women) and the plan was eventually dropped by the metro authority. But a certain section of seats in each of the eight compartments is reserved for women.

Problems with this line

The founder of Delhi Metro, E. Sreedharan said Indian Railways are not experts at urban transport, and misplanned the Kolkata metro from the beginning.[15] A private company should run the metro and can bring it up to standard in five years.[15]

Since Kolkata Metro is under Indian Railways, it can't take its own independent decisions. It has to rely on Indian Railways for everything (like rakes etc.). The rakes are ordered directly from ICF without floating any global tenders.

Notes

Template:Notelist

See also

References

  1. Kolkata Metro is now the 17th zone of Indian Railways. The Times of India(29 December 2010). Retrieved 29 December 2010.
  2. Game of the name.
  3. Kolkata Metro: Dakshineswar-New Garia Blue Line's 80% surge in ridership(22 July 2024).
  4. Template:Cite-news
  5. Template:Cite-news
  6. Mamata lays foundation for Dum Dum-Dakshineswar Metro. Express India(3 January 2010). Retrieved 7 July 2012.
  7. Metrorail Kolkata conducts first trial run of Kolkata's Dakshineswar Metro. Mint(23 December 2020).
  8. Kolkata Metro ने स्टेशन पर सुसाइड रोकने के लिए उठाया ये कदम, सभी प्लेटफॉर्म पर किए जाएंगे खास इंतजाम - Kolkata Metro decision Automatic screen doors will be installed on Platform to Prevent Suicide. Jagran. Retrieved 2023-08-29.
  9. Metro Rly Seeks Land For Platform Extension. The Times of India.
  10. Modern Chinese rakes for Kolkata Metro. Business Standard India(20 June 2015). Retrieved 5 March 2019.
  11. Metro rake from China off vessel. www.telegraphindia.com. Retrieved 5 March 2019.
  12. 印度加尔各答地铁车辆_产品中心_城轨_大连公司. www.crrcgc.cc. Retrieved 2019-08-12.
  13. Kolkata: With Chinese signal system deal off the table, fate of 13 Dalian Metro rakes hangs in balance, Gupta, Jayanta. The Times of India(25 June 2020). Retrieved 2020-09-06.
  14. Life in a ladies' Metro. www.telegraphindia.com. Retrieved 2020-02-21.
  15. 15.0 15.1 DMRC MD E Sreedharan says many Indian cities need metro rail urgently – Business Today. Businesstoday.intoday.in(9 January 2012). Retrieved 7 July 2012.

Template:Commons category

Template:Kolkata topics Template:Kolkata Metro