Created by Monkbot
Last edited January 17, 2021

Template:Infobox spaceflight

GSAT-19 is an Indian communications satellite launched by the Indian Space Research Organisation aboard a GSLV Mark III on 5 June 2017.[1]

Satellite and payloads

The satellite will act as a testbed for the modular I-6K satellite bus, carrying experimental technologies such as ion thrusters for manoeuvring and stabilisation, active thermal control using thermal radiators, a miniaturised inertial reference unit, indigenously produced lithium-ion batteries, and C-band traveling-wave-tube amplifiers.[2][3][4]

Rather than traditional transponders, GSAT-19 carries four Ku/Ka-band forward link beams and four Ku/Ka-band return link beams, providing much higher data throughput than India's previous communications satellites.[5][6] It additionally carries a Geostationary Radiation Spectrometer (GRASP) payload, which will "monitor and study the nature of charged particles and the influence of space radiation on satellites and their electronic components".[7]

Orbit raising and station keeping

The satellite was launched aboard the GSLV Mk III-D1 rocket in the evening of 5 June 2017 to a geostationary transfer orbit perigee of Template:Convert. This was followed by a series of orbit raising operations (using an on-board LAM and chemical thrusters[8]) to place the satellite in the intended geostationary orbital slot.

Op # Date/
Time (UTC)
LAM burn time Height achieved Inclination
achieved
Orbital period References
Apogee Perigee
1 6 June 2017
08:33
116 s Template:Convert Template:Convert 21.56° 10 h, 30 min [9]
2 7 June 2017
10:14
5538 s Template:Convert Template:Convert 7.02° 13 h, 58 min [10]
3 9 June 2017
04:25
3469 s Template:Convert Template:Convert 0.793° 21 h, 38 min [11]
4 10 June 2017
02:29
488 s Template:Convert Template:Convert 0.101° 23 h, 50 min, 10 s [12]

References

  1. Cite error: Invalid <ref> tag; no text was provided for refs named sfnow20170605
  2. Annual Report: 2014-2015. Indian Space Research Organisation(2015).
  3. First Prototype of ISRO's Semi-Cryogenic Engine To Be Ready By 2016(19 August 2015). Retrieved 26 October 2016.
  4. GSat 19. Gunter's Space Page. Retrieved 27 May 2016.
  5. Isro's GSAT-19, GSAT-11 satellites: Game changers in communications. The Times of India(5 June 2017). Retrieved 26 June 2017.
  6. GLSV Mark III rocket conducts ‘all-up’ launch with GSAT-19 satellite. NASASpaceFlight.com(5 June 2017). Retrieved 26 June 2017.
  7. ISRO’s Mk III Launched a Little-Known Instrument Called GRASP – This Is What It Does. The Wire(26 June 2017). Retrieved 26 June 2017.
  8. Cite error: Invalid <ref> tag; no text was provided for refs named brochure
  9. The first orbit raising operation.... Indian Space Research Organisation(8 June 2017). Retrieved 12 June 2017.
  10. The second orbit raising operation.... Indian Space Research Organisation(8 June 2017). Retrieved 12 June 2017.
  11. The third orbit raising operation.... Indian Space Research Organisation(10 June 2017). Retrieved 12 June 2017.
  12. Cite error: Invalid <ref> tag; no text was provided for refs named orbit-raise-4

Template:GSAT Satellites Template:Indian spacecraft Template:Orbital launches in 2017