Created by 167.103.54.95
Last edited February 25, 2025


Durg–Raipur–Arang Expressway is underconstructed Template:Cvt long, six-lane, access-controlled greenfield expressway in the state of Chhattisgarh, India. The expressway is a part of Bharatmala Pariyojana, and will pass from Durg through Anjora, Patora, Supkona, Abhanpur and Naya Raipur before terminating at Arang.[1][2]

Template:Infobox road

Status updates

  • Aug 2020: The target date for completion of proposed expressway is set as March 2024.[3]
  • Dec 2022 : Mehrotra Buildcon, and Shelke Constructions Led Joint Ventures Emerge As Lowest Bidders For the Expressway each with 46 km stretch Total 92 kmTemplate:Fact

See also

References

Template:India-road-stub