Aarey JVLR is an At-Grade terminal metro station serving the Ganesh Nagar neighbourhood of Goregaon on the north–south corridor of the Aqua Line 3 of Mumbai Metro in Mumbai, India.
This metro station was inaugurated on October 5, 2024, by Prime Minister Narendra Modi, followed by the commencement of the metro service from October 7, 2024.[1][2][3][4]
Station layout
Platforms 1, 2 and 3 are located at ground level. One platform is designated for boarding, while the others are designated for alighting.
| UG | Subway | Underground subway connecting Platforms 2 and 3 to Platform 1, providing access to exit A1/B1 |
| G Platforms |
Depot | Aarey Depot |
| Platform 3 | Template:0 Alighting only → | |
| Island platform Template:Access icon | ||
| Platform 2 | Template:0 Alighting only → | |
| Platform 1 | ← Towards Template:Ltl (Template:Stl) | |
| Side platform Template:Access icon | ||
| Exits | Exit A1/B1 | |
Connections
The Aarey JVLR station will provide connectivity to the under construction Metro line 6 via SEEPZ station.
Entry/Exit
-
Exit B1
See also
- Mumbai
- Transport in Mumbai
- List of Mumbai Metro stations
- List of rapid transit systems in India
- List of metro systems
References
- ↑ Mumbai Metro Line 3 Opens: Check Stations, Route, Fare, Timings And More. NDTV Profit(2024-10-07). Retrieved 2024-11-06.
- ↑ Mumbai Metro-3 Second Phase On Track: Aarey-BKC Services Begin, Link To Cuffe Parade May Be Ready by 2025. News18. Retrieved 2024-11-06.
- ↑ Mumbai's first underground metro route 'line 3' opens for public today. The Times of India(2024-10-07). Retrieved 2024-11-06.
- ↑ Mumbai's first underground metro line from Aarey to BKC now open for public – Check stations, timings, fares for Mumbai Metro Line 3 here. Financialexpress(2024-10-07). Retrieved 2024-11-06.
- ↑ Aarey JVLR Station Details. MMRCL. Retrieved 13 May 2025.
External links
- The official site of Mumbai Metro
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.