Template:Infobox power station Aditya Captive Power Plant is a captive 900 megawatt power project located at Lapanga, Sambalpur District, Odisha, which is part of Hindalco's Smelter_power project in Odisha. It has captive coal from Talabira-2 coal block a JV between Mahanadi Coalfields and Neyveli Lignite Corporation.[1]
Project
Hindalco Industries awarded contract to BHEL for main package in June 2009.[2] It is 6x150MW project with first of its kind Turbo generators designed by BHEL specifically for this project.[3]
Clearances
The project has been accorded environmental clearance by the Ministry of Environment, Forest and Climate Change (MoEF&CC).[4]
Capacity
The planned capacity of the thermal power plant is 1350 MW. Phase I of 6x150MW units and Phase II of 5x150 MW units.
| Stage | Unit Number | Installed Capacity (MW) | Date of Commissioning | Status |
|---|---|---|---|---|
| Phase I | Unit 1 | 150MW | 2013 | Running |
| Phase I | Unit 2 | 150MW | 2013 | Running |
| Phase I | Unit 3 | 150MW | 2013 | Running |
| Phase I | Unit 4 | 150MW | 2013 | Running |
| Phase I | Unit 5 | 150MW | 2013 | Running |
| Phase I | Unit 6 | 150MW | 2013 | Running |
| Phase II | Unit 5x150 | 150MW | - | Proposed |
References
- ↑ Hindalco - Greenfield & Brownfield Projects. adityabirla.com.
- ↑ www.bhel.com/press_release/press_pop.php?press_id=344. bhel.com.
- ↑ A Captive Power Plant's Quest for Reliability. powermag.com.
- ↑ EMP Report – Aditya Aluminium-R1(2017-09-18).