Created by Polarishealthcare
Last edited December 9, 2025


Template:Infobox station Agara is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] and proposed Red Line of Namma Metro in Bangalore, India. Around this metro station holds the main Agara, a major suburban area which was operated by the Madras Engineer Groups and was one of the biggest army cantonments during the British Times. This metro station is adjacent to its neighbouring localities like HSR Layout, Koramangala, Outer Ring Road and Varthur. This metro station (under Blue Line) is slated to become operational December 2026 instead of June 2026.[2][3][4][5][6]

History

Blue Line

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Agara metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board – Kodibeesanahalli) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Afcons Infrastructure was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [7] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

Template:Rcb Station Layout - To Be Confirmed Template:Stack

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Template:Access icon
Platform #
Eastbound
Towards → Template:Stl **
Next Station: Ibbalur
Change at the next station for Template:Rcb
Platform #
Westbound
Towards ← Template:Stl
Next Station: HSR Layout
Side platform | Doors will open on the left Template:Access icon
L2 Note: ** To be further extended to Template:Stl in future

Template:Rcb Station Layout - To Be Confirmed Template:Stack

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Template:Access icon
Platform #
Southbound
Towards → Template:Stl
Next Station: Template:Stl
Change at the next station for Template:Rcb
Platform #
Northbound
Towards ← Template:Stl
Next Station: Template:Stl
Side platform | Doors will open on the left Template:Access icon
L2

See also

Template:Portal bar

References

  1. Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty. timesproperty.com. Retrieved 2023-12-14.
  2. Bengaluru Big Infra Push: How Karnataka Is Planning to Fast Track Namma Metro's Blue Line Construction. www.timesnownews.com(2025-12-08). Retrieved 2025-12-09.
  3. L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today. Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 2023-12-14.
  4. Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar. The Indian Express(2023-06-06). Retrieved 2023-12-14.
  5. Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026. TimesNow(2023-06-07). Retrieved 2023-12-14.
  6. Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL. The New Indian Express(16 September 2023). Retrieved 2023-12-14.
  7. Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work. The Metro Rail Guy(2020-10-13). Retrieved 2024-10-24.

Template:Namma Metro