Amaravati Seed Capital Road or ASC Road is an ongoing arterial flyover road project and a part of Amaravati Seed Access Road Network to connect the city of Vijayawada with Amaravati.[1][2] It is built by the Andhra Pradesh Capital Region Development Authority (APCRDA) with an estimated cost of Template:INRConvert and has a total length of Template:Convert.[3][4]
Phase–I
The proposed phase–I of the road will be constructed for a length of Template:Convert between Dondapadu–near Kondaveetivagu by the end of 2018.[5]
References
- ↑ Eight-lane road to connect Vijayawada, Amaravati. The Hans India.
- ↑ Seed capital access roads in tendering stage. The Hindu.
- ↑ High-speed road to Amaravati. Deccan Chronicle(26 June 2016).
- ↑ AP government clips wings of CRDA. The Times of India(14 April 2016).
- ↑ CM allots first lot of plots in Amaravati. The Hindu(26 June 2016).