Template:Infobox rail line Aqua Line of the Pune Metro is the second line of the city's under-construction mass transit network. It will run from Ramwadi to Vanaz via Mangalwar Peth and Deccan Gymkhana.
Route
The elevated line will cover a distance of 14.66 km and will have 16 stations. It will connect with the Purple Line and Line 3 at the Civil Court interchange station. The maintenance depot for the Aqua Line will be located near the Vanaz station on the former garbage depot land.[1][2]
List of stations
Following is a list of stations on this route-
| Aqua Line | |||||||
|---|---|---|---|---|---|---|---|
| # | Station name | Status | Connections | Layout | |||
| English | Marathi | ||||||
| 1 | Template:Metro | वनाझ | Under construction | None | Elevated | ||
| 2 | Anand Nagar | आनंदनगर | Under construction | None | Elevated | ||
| 3 | Template:Metro | आयडियल कॉलनी | Under construction | None | Elevated | ||
| 4 | Template:Metro | नळ स्टॉप | Under construction | None | Elevated | ||
| 5 | Template:Metro | गरवारे महाविद्यालय | Under construction | None | Elevated | ||
| 6 | Template:Metro | डेक्कन जिमखाना | Under construction | None | Elevated | ||
| 7 | Template:Metro | छत्रपती संभाजी उद्यान | Under construction | None | Elevated | ||
| 8 | Template:Metro | पुणे महानगरपालिका भवन | Under construction | None | Elevated | ||
| 9 | Template:Metro | सिव्हिल कोर्ट | Under construction | Template:Color box & Template:Color box | Elevated | ||
| 10 | Template:Metro | मंगळवार पेठ | Under construction | None | Elevated | ||
| 11 | Template:Metro | पुणे रेल्वे स्टेशन | Under construction | None | Elevated | ||
| 12 | Template:Metro | रुबी हॉल क्लिनिक | Under construction | None | Elevated | ||
| 13 | Template:Metro | बंड गार्डन | Under construction | None | Elevated | ||
| 14 | Template:Metro | येरवडा | Under construction | None | Elevated | ||
| 15 | Template:Metro | कल्याणी नगर | Under construction | None | Elevated | ||
| 16 | Template:Metro | रामवाडी | Under construction | None | Elevated | ||
References
- ↑ MahaMetro takes possession of 35 hectares of land for project. The Times of India(April 27, 2018). Retrieved 2018-05-04.
- ↑ MahaMetro gets land for depot and multi-modal hub. The Times of India(March 17, 2018). Retrieved 2018-05-04.