Dahanukarwadi is an elevated metro station serving the Dahanukarwadi neighbourhood of Kandivli on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA) and was inaugurated on 2 April 2022.[1][2]
History
J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[3] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[4] Dahanukarwadi was opened to the public on 2 April 2022, along with the first phase of Line 2A.[5][6]
Station layout
| 2nd Floor | Platform 1A | Template:0 Pocket track toward Charkop depot → |
| Template:Small | ||
| Platform 1 | Template:0 toward Template:Ltl (Template:Stl) → | |
| Platform 2 | ← toward Template:Ltl (Template:Stl) | |
| Template:Small | ||
| 1st Floor | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| G | Street level | Exit/Entrance |
Power and signaling system
Like all other stations and railways of Mumbai metro, Dahanaukarwadi station also uses 25,000 volt AC power system by overhead catenary to operate the trains.
References
- ↑ Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here. DNA India. Retrieved 2023-04-18.
- ↑ Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today. News18(2023-01-20). Retrieved 2023-04-18.
- ↑ Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project. dna(9 August 2016). Retrieved 14 October 2016.
- ↑ MMRDA to conduct test run for two elevated Metro lines next week. Mumbai Mirror(May 26, 2021). Retrieved 2023-07-09.
- ↑ Mumbai: Phase 1 of Metro Line 2A and 7 opened for public. The Indian Express(2022-04-03). Retrieved 2023-07-09.
- ↑ Mumbai Metro: These 2 lines to get operational today. Check route, other details. mint(2023-01-19). Retrieved 2023-04-18.