The Delhi Metro is a rapid transit system that serves Delhi and the adjoining satellite cities of Faridabad, Gurugram, Ghaziabad, Noida, Bahadurgarh, and Ballabhgarh in the National Capital Region of India.[1] The system consists of 10 colour-coded lines[2] serving 271 stations,Template:Efn with a total length of Template:Convert.Template:Efn It is India's largest and busiest metro rail system. The metro has a mix of underground, at-grade, and elevated stations using broad-gauge and standard-gauge tracks. The metro makes over 4,300 trips daily.[3]

Construction began in 1998, and the first elevated section (Shahdara to Tis Hazari) on the Red Line opened on 25 December 2002. The first underground section (Vishwa VidyalayaKashmere Gate) on the Yellow Line opened on 20 December 2004.[4] The network was developed in phases. Phase I was completed by 2006, followed by Phase II in 2011. Phase III was mostly complete in 2021, except for a small extension of the Airport Line which opened in 2023.[5] Work on Phase IV began on 30 December 2019.[6]

The Delhi Metro Rail Corporation (DMRC), a joint venture between the Government of India and Delhi, built and operates the Delhi Metro.[7][8] The DMRC was certified by the United Nations in 2011 as the first metro rail and rail-based system in the world to receive carbon credits for reducing greenhouse-gas emissions, reducing annual carbon emission levels in the city by 630,000 tonnes.[9]

The Delhi Metro has interchanges with the Rapid Metro Gurgaon (with a shared ticketing system) and Noida Metro. On 22 October 2019, DMRC took over operations of the financially troubled Rapid Metro Gurgaon.[10] The Delhi Metro's annual ridership was 235.8crore (2.35 billion) in 2025.Template:Efn[11][12] The system also has interchanges with the Delhi-Meerut RRTS, India's fastest urban regional transit system.[13]

History

Background

Non-Animated timeline of the metro
Evolution of the Delhi Metro from 2003 to 2018

The concept of mass rapid transit for New Delhi first emerged from a 1969 traffic and travel characteristics study in the city.[14] Over the next several years, committees in a number of government departments were commissioned to examine issues related to technology, route alignment, and governmental jurisdiction.[14] In 1984, the Urban Arts Commission proposed the development of a multi-modal transport system which would build three underground mass rapid transit corridors and augmenting the city's suburban railway and road transport networks.[15]

The city expanded significantly while technical studies and financing the project underway, doubling its population and increasing the number of vehicles five-fold between 1981 and 1998.[15] Traffic congestion and pollution soared as an increasing number of commuters used private vehicles, and the existing bus system was unable to bear the load.[14] A 1992 attempt to privatise the bus transport system compounded the problem, with inexperienced operators plying poorly maintained, noisy and polluting buses on lengthy routes; this resulted in long waiting times, unreliable service, overcrowding, unqualified drivers, speeding and reckless driving[16] which led to road accidents. The Government of India under Prime Minister H.D. Deve Gowda[17] and the Government of Delhi set up the Delhi Metro Rail Corporation (DMRC) on 3 May 1995, with Elattuvalapil Sreedharan its managing director.[18] Mangu Singh succeeded Sreedharan as DMRC managing director on 31 December 2011.[19]

Initial construction

When the project was originally approved by the Union Cabinet in September 1996, it had three corridors. In 1997, official development assistance loans from Japan were granted to finance and conduct the first phase of the system.[20]

Construction of the Delhi Metro began on 1 October 1998.[21] To avoid problems experienced by the Kolkata Metro, which witnessed substantial delays and ran 12 times over budget due to "political meddling, technical problems and bureaucratic delays", the DMRC was created as a special-purpose vehicle vested with autonomy and power to execute the large project which involved many technical complexities in a difficult urban environment within a limited time frame. Putting the central and state governments on an equal footing gave an unprecedented level of autonomy and freedom to the company, which had full powers to hire people, decide on tenders, and control funds.[22][23] The DMRC hired the Hong Kong MTRC as a technical consultant on rapid-transit operation and construction techniques.[24] Construction proceeded smoothly except for a major disagreement in 2000, when the Ministry of Railways forced the system to use Template:Track gauge broad gauge despite the DMRC's preference for standard gauge.[25] This decision led to an additional capital expenditure of Template:INRConvert.[26][27]

The Delhi Metro's first line, the Red Line, was inaugurated by Prime Minister Atal Bihari Vajpayee on 24 December 2002.[28] The metro became India's second underground rapid transit system, after the Kolkata Metro, when the VishwavidyalayaKashmere Gate section of the Yellow Line opened on 20 December 2004. The underground line was inaugurated by Prime Minister Manmohan Singh. The project's first phase was completed in 2006,[29][30] on budget and almost three years ahead of schedule, an achievement described by Business Week as "nothing short of a miracle".[31]

Phase I

A 64.75 kilometer (40.23 miles) network of 59 stations was constructed in Delhi, encompassing the initial sections of the Red, Yellow, and Blue Lines. The stations were opened to the public between 25 December 2002 and 11 November 2006.

Phase 1 Network[32][2]
No. Line Stations Length (km) Terminals Opening date[33]
1 rowspan="3" style="background:#Template:Rail color; text-align: center;" |Red Line 6 8.35 Shahdara Tis Hazari 25 December 2002[34]
4 4.87 Tis Hazari Inderlok 3 October 2003[34]
8 8.84 Inderlok Rithala 31 March 2004[34]
2 rowspan="2" style="background:#Template:Rail color;text-align:center; " |Yellow Line 4 4.06 Vishwavidyalaya Kashmere Gate 20 December 2004[34]
6 6.62 Kashmere Gate Central Secretariat 3 July 2005[35]
3 rowspan="3" style="background:#Template:Rail color;text-align:center; " |Blue Line 22 22.74 Dwarka Barakhamba Road 31 December 2005[36]
6 6.47 Dwarka Sector 9 1 April 2006[34]
3 2.80 Barakhamba Road Indraprastha 11 November 2006[37]
Total 59 64.75

Phase II

A total of Template:Convert network of 86 stations and 10 routes and extensions was built. Seven routes were extensions of the Phase I network, three were new colour-coded lines, and three routes connect to other cities (the Yellow Line to Gurgaon and the Blue Line to Noida and Ghaziabad) of the national capital region in the states of Haryana and Uttar Pradesh. At the end of Phases I and II, the network's total length was Template:Convert and 145 stations became operational between 4 June 2008 and 27 August 2011.[9]

Phase 2 network[32][2]
No. Line Stations Length (km) Terminals Opening date[33]
1 style="background:#Template:Rail color; text-align: center;" |Red Line 3 2.86 Shahdara Dilshad Garden 4 June 2008[38]
2 rowspan="4" style="background:#Template:Rail color;text-align:center; " |Yellow Line 5 6.38 Vishwavidyalaya Jahangirpuri 4 February 2009[39]
9 15.82 Millennium City Centre Gurugram Qutab Minar 21 June 2010[40]
1 Chhatarpur 26 August 2010[41]
9 11.76 Qutab Minar Central Secretariat 3 September 2010[42]
3 rowspan="3" style="background:#Template:Rail color;text-align:center; " |Blue Line 1 2.17 Indraprastha Yamuna Bank 10 May 2009[43]
10 12.85 Yamuna Bank Noida City Centre 12 November 2009[44]
2 2.28 Dwarka Sector 9 Dwarka Sector 21 30 October 2010[45]
4 rowspan="2" style="background:#Template:Rail color;text-align:center; "|Blue Line Branch 6 6.25 Yamuna Bank Anand Vihar 6 January 2010[46]
2 2.26 Anand Vihar Vaishali 14 July 2011[47]
5 rowspan="2" style="background:#Template:Rail color;text-align:center; " |Green Line 14 14.19 Inderlok Mundka 3 April 2010[48]
2 3.41 Ashok Park Main Kirti Nagar 27 August 2011[49]
6 rowspan="2" style="background:#Template:Rail color;text-align:center; " |Violet Line 13 15.34 Central Secretariat Sarita Vihar 3 October 2010[50]
3 4.82 Sarita Vihar Badarpur Border 14 January 2011[51]
- rowspan="2" style="background:#Template:Rail color;text-align:center; "|Airport Express 4 22.91 New Delhi Dwarka Sector 21 23 February 2011[52]
2 Dhaula Kuan & Delhi Aerocity 15 August 2011[53]
Total 86 123.30

Phase III

Phase I (Red, Yellow and Blue Lines) and Phase II (Green, Violet, and Airport Express Lines) focused on adding radial lines to expand the network. To further reduce congestion and improve connectivity, Phase III included eight extensions to existing lines, two ring lines (the Pink and Magenta Lines) and the Grey Line. It has 28 underground stations, three new lines and seven route extensions, totaling Template:Convert, at a cost of Template:INRConvert.[54][55] The three new Phase III lines are the Pink Line on Inner Ring Road (Line 7), the Magenta Line on Outer Ring Road (Line 8) and the Grey Line connecting Dwarka and Najafgarh (Line 9).[2]

Phase 3 network[56][2]
No. Line Stations Length (km) Terminals Opening date
1 style="background:#Template:Rail color ; text-align: center;" |Red Line 8 9.64 Dilshad Garden Shaheed Sthal
(New Bus Adda)
9 March 2019[57]
2 style="background:#Template:Rail color; text-align: center;" |Yellow Line 3 4.37 Jahangirpuri Samaypur Badli 10 November 2015[58]
3 style="background:#Template:Rail color; text-align: center; " |Blue Line 6 6.80 Noida City Centre Noida Electronic City 9 March 2019[59]
5 rowspan="2" style="background:#Template:Rail color; text-align: center; " |Green Line 7 11.19 Mundka Brigadier Hoshiyar Singh 24 June 2018[60]
1 Punjabi Bagh West 29 March 2022[61]
6 rowspan="5" style="background:#Template:Rail color;text-align:center; " |Violet Line 2 3.23 Mandi House Central Secretariat 26 June 2014[62]
1 0.97 Mandi House ITO 8 June 2015[63]
9 13.56 Badarpur Border Escorts Mujesar 6 September 2015[64]
4 5.07 Kashmere Gate ITO 28 May 2017[65]
2 3.35 Escorts Mujesar Raja Nahar Singh (Ballabhgarh) 19 November 2018[66]
- style="background:#Template:Rail color;text-align:center;" |Airport Express 1 2.01 Dwarka Sector 21 Yashobhoomi - Dwarka Sector 25 17 September 2023[67]
7 rowspan="5" style="background:#Template:Rail color;text-align:center; " |Pink Line 12 21.57 Majlis Park Durgabai Deshmukh South Campus 14 March 2018[68]
6 8.53 Durgabai Deshmukh South Campus Lajpat Nagar 6 August 2018[69]
15 17.86 Trilokpuri Sanjay Lake Shiv Vihar 31 October 2018[70]
5 9.63 Lajpat Nagar Shree Ram Mandir Mayur Vihar 31 December 2018[71]
0 1.65 Shree Ram Mandir Mayur Vihar Trilokpuri Sanjay Lake 6 August 2021[72]
8 rowspan="2" style="background:#Template:Rail color ;text-align:center;" |Magenta Line 9 12.64 Kalkaji Mandir Botanical Garden 25 December 2017[73]
16 24.82 Janakpuri West Kalkaji Mandir 29 May 2018[74]
9 rowspan="2" style="background:#Template:Rail color; text-align: center;" |Grey Line 3 4.30 Dwarka Najafgarh 4 October 2019[75]
1 0.89 Najafgarh Dhansa Bus Stand 18 September 2021[76]
Total 111 162.375

Work on Phase III began in 2011,[77][78] with 2016 the planned deadline.[79] Over 20 tunnel-boring machines were used simultaneously to expedite construction,[80] which was completed in March 2019 (except for a small stretch due to non-availability of land).[81] Short extensions were later added to Phase III, which was expected to be completed by the end of 2020, but construction was delayed due to the COVID-19 pandemic. It was completed on 18 September 2021 with the opening of the Grey Line extension from Najafgarh to Dhansa Bus Stand.[82] An extension of the Airport Line to Yashobhoomi Dwarka Sector - 25 metro station was later added, and it was completed on 17 September 2023.[83]

Driverless operations on the Template:Convert Magenta line began on 28 December 2021, making it the Delhi Metro's (and India's) first driverless metro line.[84] On 25 November 2021, the Template:Convert Pink Line also began driverless operations. The total driverless DMRC network is nearly Template:Convert, putting Delhi Metro in fourth position globally among such networks behind Kuala Lumpur.[85]

The expected daily ridership of the network after the completion of Phase III was estimated at 53.47 lakh passengers. Actual DMRC ridership was 27.79 lakh in 2019–20, 51.97 percent of the projected ridership. Actual ridership of the Phase III corridors was 4.38 lakh, compared with a projected ridership of 20.89 lakh in 2019–20 (a deficit of 79.02 percent).[86][87] The communication-based train control (CBTC) on Phase III trains enables them to run at a 90-second headway, although the actual headway between trains is higher because of the relatively low demand on the new corridors.[88] Keeping the short headway and other constraints in mind, DMRC changed its decision to build nine-car-long stations for new lines and opted for shorter stations which can accommodate six-car trains.[89]

Phase IV

Phase IV, with a length of Template:Convert and six lines, was finalized by the Government of Delhi in December 2018.[90] Approval from the government of India was received for three priority corridors in March 2019.[91] Construction of the corridors Template:Convert began on 30 December 2019, with an expected completion date of 2026.[92] The metro's total length will exceed Template:Convert at the end of Phase IV,[93][81] not including other independently operated systems in the National Capital Region such as the Template:Convert Aqua Line of the Noida-Greater Noida Metro[94] and the Template:Convert Rapid Metro Gurgaon which connect to the Delhi Metro.[95][96]

Phase IV network
No. Line Stations Length (km) Terminals Status Expected completion date Opening date
7 rowspan="2" style="background:#Template:Rail color;text-align:center; " | Pink Line 7 12.32 Majlis Park Maujpur - Babarpur Completed 8 March 2026[97]
1 Soorghat Under Construction 2026
8 rowspan="5"style="background:#Template:Rail color;text-align:center;" |Magenta Line 1 1.8 Janakpuri West Krishna Park Extension Completed 5 January 2025
7 9.9 Majlis Park Deepali Chowk Completed 8 March 2026[97]
6 17.53 Krishna Park Extension Deepali Chowk Under construction[98] 2026[99]
8 Majlis Park RK Ashram Marg
10 12.38[100] Inderlok Indraprastha Under Construction[101] 2029[102]
10 style="background:#Template:Rail color;text-align:center;" |Golden Line 15 23.62 Tughlakabad Delhi Aerocity Under construction[98] 2026[99]
11 style="background:#Template:Rail color;text-align:center;" |Golden Branch Line 8 8.4 Lajpat Nagar Saket G-Block Under construction[103] 2029[102]
1 style="background:#Template:Rail color; text-align: center;" |Red Line 21 26.46[104] Rithala Kundli Approved[105] 2029
Total 84 112.427

Phase V

Phase V (A) network
No. Line Stations Length (km) Terminals Status Expected completion date
8 style="background:#Template:Rail color ; text-align: center;" |Magenta Line 8 9.913 R K Ashram Marg Indraprastha Approved[106] 2029
10 rowspan="2" style="background:#Template:Rail color ; text-align: center;" |Golden Line 3 3.9 Tughlakabad Kalindi Kunj Approved[106] 2029
1 2.263 Delhi Aerocity Terminal 1 IGI Airport Approved[106] 2029
Total 12 16.076

Construction Incidents

On 19 October 2008, a launching gantry and part of the overhead Blue Line extension under construction in Laxmi Nagar collapsed and fell on a passing bus. Workers were using a crane to lift a 400-tonne concrete span of the bridge when the gantry and a Template:Convert span of the bridge collapsed on the bus. The driver and a construction worker were killed.[107]

On 12 July 2009, a section of a bridge collapsed while it was being erected at Zamrudpur, east of Kailash, on the Central Secretariat – Badarpur corridor. Six people died and 15 were injured.[108] A crane removing the debris collapsed the following day and collapsed two other nearby cranes, injuring six.[109] On 22 July 2009, a worker at the Ashok Park Metro station was killed when a steel beam fell on him.[110] Over a hundred people, including 93 workers, have died since work on the metro began in 1998.[111]

On 23 April 2018, five people were injured when an iron girder fell off the elevated section of a Metro structure under construction at the Mohan Nagar intersection in Ghaziabad. A car, an auto rickshaw, and a motorbike were also damaged in the incident.[112]

Lines

Red Line (Line 1)

Template:Main

Older, but still modern, rapid-transit train at a station
Older rolling stock used by the DMRC on Line 1. Most of the stock running on Lines 2, 3, and 4 are planned to be sent to Line 1.

The Red Line, the first metro line opened, connects Rithala in the west to Shaheed Sthal (New Bus Adda) in the east for a distance of Template:Convert.[113] Partly elevated and partly at grade, it crosses the Yamuna River between the Kashmere Gate and Shastri Park stations.[114] The opening of the first stretch on 24 December 2002, between Shahdara and Tis Hazari, crashed the ticketing system due to demand.[115][116] Subsequent sections were opened from Tis Hazari – Trinagar (later renamed Inderlok) on 4 October 2003,[117] Inderlok – Rithala on 31 March 2004, and Shahdara – Dilshad Garden on 4 June 2008.[118] The Red Line has interchanges at Kashmere Gate with the Yellow and Violet Lines, at Inderlok with the Green Line, and at Netaji Subhash Place and Welcome with the Pink Line, and at Madhuban Chowk with the Magenta Line. An interchange with the Blue Line at Mohan Nagar is planned. Six-coach trains were commissioned on the line on 24 November 2013.[119] An extension from Dilshad Garden to Shaheed Sthal (New Bus Adda) opened on 8 March 2019. The metro introduced a set of two eight-coach trains on the Red Line, converted from the existing fleet of 39 six-coach trains, in November 2022.[120]

Yellow Line (Line 2)

Template:Main

Still-modern train at a station
Old Yellow Line Mitsubishi-Rotem trainset
See caption
Train arriving at a Yellow Line station

The Yellow Line, the metro's second line, was its first underground line.[121] Running Template:Convert north to south, it connects Samaypur Badli with Millennium City Centre Gurugram in Gurugram. The northern and southern parts of the line are elevated, and the central section (which passes through some of the most congested parts of Delhi) is underground. The underground section between Vishwavidyalaya and Kashmere Gate opened on 20 December 2004; the Kashmere Gate – Central Secretariat section opened on 3 July 2005, and Vishwa Vidyalaya – Jahangirpuri on 4 February 2009.[118] The line has India's second-deepest metro station[122] at Chawri Bazar, Template:Convert below ground level.[123]

An additional stretch from Qutab Minar to Millennium City Centre Gurugram, initially operating separately from the mainline, opened on 21 June 2010; the Chhatarpur station on this stretch opened on 26 August of that year. Due to delays in acquiring land to construct the station, it was built with prefabricated structures in nine months and is the only Delhi Metro station made completely of steel.[124][125] The connecting link between Central Secretariat and Qutub Minar opened on 3 September 2010.[126] On 10 November 2015, the line was further extended between Jahangirpuri and Samaypur Badli in Outer Delhi.[127]

Interchanges are available with the Red Line and Kashmere Gate ISBT at Kashmere Gate, with the Blue Line at Rajiv Chowk, with the Violet Line at Kashmere Gate and Central Secretariat, with the Airport Express at New Delhi, with the Pink Line at Azadpur and Dilli Haat - INA, with the Magenta Line at Hauz Khas and Haiderpur Badli Mor, with Rapid Metro Gurgaon at Sikanderpur, and with Indian Railways at Chandni Chowk and New Delhi.[128][129]

The Yellow Line is the metro's first line to replace four-coach trains with six- and eight-coach configurations. The Metro Museum at Patel Chowk metro station, South Asia's only rapid-transit museum, has a collection of display panels, historical photographs and exhibits tracing the genesis of the Delhi Metro.[130] The museum was opened on 1 January 2009.[122]

Template:AnchorBlue Line (Lines 3 and 4)

Template:Main

Modern train at a station
New Bombardier Blue Line trainset

The Blue Line, the third line of the metro open, was the first to connect areas outside Delhi.[131] Mainly elevated and partly underground,[132] it connects Dwarka Sub City in the west with the satellite city of Noida in the east for a distance of Template:Convert.[131] The line's first section, between Dwarka and Barakhamba Road, opened on 31 December 2005, and subsequent sections opened between Dwarka – Dwarka Sector 9 on 1 April 2006, Barakhamba Road – Indraprastha on 11 November 2006, Indraprastha – Yamuna Bank on 10 May 2009, Yamuna Bank – Noida City Centre on 12 November 2009, and Dwarka Sector 9 – Dwarka Sector 21 on 30 October 2010.[118] The line crosses the Yamuna River between the Indraprastha and Yamuna Bank stations,[114] and has India's second extradosed bridge across the Northern Railways mainlines near Pragati Maidan.[133]

A branch of the Blue Line, inaugurated on 8 January 2010, runs for Template:Convert from the Yamuna Bank station to Anand Vihar in East Delhi.[134] It was extended to Vaishali on 14 July 2011.[135] A Template:Convert stretch from Dwarka Sector 9 to Dwarka Sector 21 opened on 30 October 2010.[136] On 9 March 2019, a Template:Cvt extension from Noida City Centre to Noida Electronic City was opened by Prime Minister Narendra Modi.[137] Interchanges are available with the Aqua Line (Noida Metro) Noida Sector 51 station at Noida Sector 52, with the Yellow Line at Rajiv Chowk,[132] with the Green Line at Kirti Nagar, with the Violet Line at Mandi House, with the Airport Express at Dwarka Sector 21, with the Pink Line at Rajouri Garden, Mayur Vihar Phase-I, Karkarduma and Anand Vihar, with the Magenta Line at Janakpuri West and Botanical Garden, and with Indian Railways and the Interstate Bus Station (ISBT) at Anand Vihar station (which connects with Anand Vihar Railway Terminal and Anand Vihar ISBT).[138] An interchange with the Red Line at Mohan Nagar is planned.

Green Line (Line 5)

Template:Main

A modern train pulling into a station
Mitsubishi-Rotem-BEML rolling stock on the Green Line

Opened in 2010, the Green Line (Line 5) was Delhi Metro's fifth and its first standard-gauge line; the others were broad gauge. It runs between Inderlok (a Red Line station) and Brigadier Hoshiyar Singh, with a branch line connecting its Ashok Park Main station with Kirti Nagar on the Blue Line. The elevated line, built as part of Phase-II, runs primarily along the busy NH-10 route in West Delhi. It has 24 stations, including an interchange with the Pink Line at Punjabi Bagh West, and covers a distance of Template:Convert. The line had India's first standard-gauge maintenance depot at Mundka.[139]

It opened in two stages, with the Template:Convert Inderlok–Mundka section opening on 3 April 2010 and the Template:Convert Kirti Nagar–Ashok Park Main branch line opening on 27 August 2011. On 6 August 2012, to improve commuting in the National Capital Region, the government of India approved an extension from Mundka to Bahadurgarh in Haryana. The Template:Convert stretch has seven stations (Mundka Industrial Area, Ghevra, Tikri Kalan, Tikri Border, Pandit Shree Ram Sharma, Bahadurgarh City and Brigadier Hoshiyar Singh) between Mundka and Bahadurgarh, and opened on 24 June 2018.

Violet Line (Line 6)

Template:Main

Modern train with the number 6 in front
Mitsubishi-Rotem-BEML rolling stock on the Violet Line

The Violet Line is the sixth metro line opened and the second standard-gauge corridor, after the Green Line. The Template:Convert line connects Raja Nahar Singh in Ballabgarh via Faridabad to Kashmere Gate in New Delhi, with Template:Convert overhead and the rest underground. The first section between Central Secretariat and Sarita Vihar opened on 3 October 2010, hours before the inaugural ceremony of the 2010 Commonwealth Games, and connects Jawaharlal Nehru Stadium (the venue for the games' opening and closing ceremonies).[140] Completed in 41 months, it includes a Template:Convert bridge over the Indian Railways mainlines and a Template:Convert cable-stayed bridge across a road flyover; it connects several hospitals, tourist attractions, and an industrial estate. Service is provided at five-minute intervals.[140][141] An interchange with the Yellow Line is available at Central Secretariat through an integrated concourse. On 14 January 2011, the remaining portion from Sarita Vihar to Badarpur was opened; this added three new stations to the network.[142]

The section between Mandi House and Central Secretariat was opened on 26 June 2014, and a Template:Convert section between ITO and Mandi House was opened on 8 June 2015. A Template:Convert extension south to Escorts Mujesar in Faridabad was inaugurated by Prime Minister Narendra Modi on 6 September 2015.[143] All nine stations on the Badarpur–Escorts Mujesar (Faridabad) section of the metro's Phase III received the highest rating (platinum) for adherence to green-building norms from the Indian Green Building Council (IGBC). The awards were given to DMRC Managing Director Mangu Singh by IGBC chair P. C. Jain on 10 September 2015.[144]

The line's Faridabad corridor is the longest corridor outside Delhi: 11 stations and Template:Convert.[145] On 28 May 2017, the ITOKashmere Gate corridor was opened by Union Minister of Urban Development Venkaiah Naidu and Chief Minister of Delhi Arvind Kejriwal. The underground section is popularly known as the Heritage Line.[146][147]Template:Rp Interchanges are available with the Red Line at Kashmere Gate, with the Yellow Line at Kashmere Gate and Central Secretariat, with the Blue Line at Mandi House, with the Pink Line at Lajpat Nagar and with the Magenta Line at Kalkaji Mandir.

Airport Express Line / Orange Line

Template:Main

The outside of an Airport Express train, outdoors
The Airport Express Line
Roomy, comfortable-looking train interior
Interior of an Airport Express train

The Airport Express line runs Template:Convert from New Delhi to Yashobhoomi Dwarka Sector - 25, linking the New Delhi railway station and Indira Gandhi International Airport. The line was operated by Delhi Airport Metro Express Pvt. Limited (DAMEL), a subsidiary of Reliance Infrastructure (the line's concessionaire until 30 June 2013). It is now operated by DMRC.[148] The line was built at a cost of Template:INRConvert, of which Reliance Infrastructure invested Template:INRConvert and will pay fees in a revenue-share model.[149] It has six stations (Dhaula Kuan and Delhi Aerocity became operational on 15 August 2011), and some have check-in facilities, parking, and eateries.[150] Rolling stock consists of six-coach trains, operating at ten-minute intervals, with a maximum speed of Template:Convert.[150]

Originally scheduled to open before the 2010 Commonwealth Games, the line failed to obtain the mandatory safety clearance and was opened on 23 February 2011 after a delay of about five months. Sixteen months after beginning operations, it was shut down for viaduct repairs on 7 July 2012.[151][152] The line reopened on 22 January 2013.[153] On 27 June 2013, Reliance Infrastructure told DMRC that they were unable to operate the line beyond 30 June of that year. DMRC took over the line on 1 July 2013 with a 100-person operations and maintenance team.[154] In January 2015, DMRC reported that the line's ridership had increased about 30 percent after a fare reduction of up to 40 percent the previous July.[155] DMRC announced a further fare reduction on 14 September 2015, with a maximum fare of ₹60 and minimum of ₹10 instead of ₹100 and ₹20.[156] DMRC said that this was done to reduce crowding on the Blue Line, diverting some Dwarka-bound passengers to the Airport Express Line (which was underutilised and faster than the Blue Line). The line's speed was increased from Template:Convert to Template:Convert on 24 June 2023, enabling a 16-minute ride from New Delhi to IGI Airport.

Interchanges are available with the Yellow Line at New Delhi, with the Blue Line at Dwarka Sector 21, with the Durgabai Deshmukh South Campus metro station of the Pink Line at Dhaula Kuan, and with Indian Railways at New Delhi. An expansion of Dwarka Sector 25 was inaugurated on 17 September 2023 with the opening of the adjacent India International Convention Centre.[157]

Pink Line (Line 7)

Template:Main

Head-on photo of a train at an outdoor station
A Hyundai Rotem coach on the Pink Line at the Mayur Vihar-I station

The Pink Line is the second new line of the Delhi Metro's third phase. It was opened on 14 March 2018, with an extension opening on 6 August. The Trilokpuri Sanjay Lake-to-Shiv Vihar section was opened on 31 October, and the Lajpat Nagar-to-Shree Ram Mandir Mayur Vihar section opened on 31 December of that year. The section, between Shree Ram Mandir Mayur Vihar and Trilokpuri Sanjay Lake, was opened on 6 August 2021 after delays due to land-acquisition and rehabilitation issues.[158] The final section between Majlis Park and Maujpur - Babarpur was opened on 8 March 2026.[97] It covers Delhi in a Ring-shaped pattern which makes it India's first Ring metro which travels in clockwise or anti-clockwise direction with a brach line connecting Shiv Vihar to it.

The Pink Line has 46 stations from Maujpur - Babarpur via Majlis Park to Shiv Vihar, both in North Delhi. With a length of Template:Convert, it is the Delhi Metro's longest line. The mostly elevated line covers Delhi in a Ring-shaped pattern. It is also known as the Ring Road Line, since it runs along the busy Ring Road.[147]Template:Rp

The line has interchanges with most of the metro's other lines, including with the Red Line at Netaji Subhash Place and Welcome, with the Yellow Line at Azadpur and Dilli Haat – INA, with the Blue Line at Rajouri Garden, Mayur Vihar Phase-I, Anand Vihar and Karkarduma, with the Green Line at Punjabi Bagh West, with Dhaula Kuan of the Airport Express at Durgabai Deshmukh South Campus, with the Violet Line at Lajpat Nagar, with the Magenta Line at Majlis Park, with Indian Railways at Hazrat Nizamuddin and Anand Vihar Terminal, and the ISBTs at Anand Vihar and Sarai Kale Khan. The Pink Line reaches the Delhi Metro's highest point at Dhaula KuanTemplate:SndTemplate:Convert, passing over the Dhaula Kuan grade-separator flyovers and the Airport Express Line.[159][147]Template:Rp

Magenta Line (Line 8)

Template:Main

See caption
A Magenta Line train at a station

The Magenta Line is the Delhi Metro's first new line of its third phase. The Botanical Garden-to-Kalkaji Mandir section opened on 25 December 2017, and the Janakpuri West-to-Kalkaji Mandir section of the line opened on 28 May 2018. Further in Phase IV extension the Janakpuri West-to-Krishna Park Extension section opened on 5 January 2026 and the Majlis Park-to-Deepali Chowk section opened on 8 March 2026.

It has 33 stations of which 26 stations, from Krishna Park Extension to Botanical Garden and 7 stations, from Majlis Park to Deepali Chowk. The line directly connects to Terminal 1D of Indira Gandhi International Airport. The Hauz Khas station on this line and the Yellow Line is the deepest metro station, at a depth of Template:Convert.[160] The Magenta Line has interchanges with the Yellow Line at Hauz Khas and Haiderpur Badli Mor, with the Blue Line at Janakpuri West and Botanical Garden, and with the Violet Line at Kalkaji Mandir, with the Red Line at Madhuban Chowk and with the Pink Line at Majlis Park. India's first driverless train service began on the Magenta Line in December 2020.[161]

As of February 2026, it was decided that the Inderlok-Indraprastha corridor under Green Line's extension for Phase 4 will now be implemented as an extension for Magenta Line instead, which will bring the total corridor length from Botanical Garden to Inderlok to about 89 km, making it the longest metro line in Delhi. Consequently, the line will form an interchange with itself at Nabi Karim.

Grey Line (Line 9)

Template:Main

A train at a station
A Hyundai Rotem train on the Grey Line

The Grey Line (also known as Line 9), the Delhi metro's shortest line, runs from Dwarka to Dhansa Bus Stand in western Delhi. The Template:Convert line has four stations (Dhansa Bus Stand, Najafgarh, Nangli and Dwarka), and has an interchange with the Blue Line at Dwarka. The Najafgarh-to-Dwarka section was opened on 4 October 2019. The extension to Dhansa Bus Stand was scheduled to open in December 2020, but construction was delayed by the COVID-19 pandemic; it opened on 18 September 2021.[162]

Network

Template:Main

The Delhi Metro has been undergoing construction in phases. Phase I consisted of 59 stations and Template:Convert of route length,[163] of which Template:Convert is underground and Template:Convert at grade or elevated.[164] The inauguration of the DwarkaBarakhamba Road corridor of the Blue Line completed Phase I in October 2006.[165] Phase II consists of Template:Convert of route length and 86 stations,[163] and is completed; the first section opened in June 2008, and the last section opened in August 2011.[166] Phase III consists of 109 stations, three new lines and seven route extensions, totaling Template:Convert,[163] at a cost of Template:INRConvert.[54] Most of it was completed on 5 April 2019, except for a small section of the Pink Line between the Mayur Vihar Pocket 1 and Trilokpuri Sanjay Lake stations[167] (opened on 6 August 2021), the Grey Line extension from Najafgarh to Dhansa Bus Stand[168] (opened on 18 September 2021), and the Airport Express extension from Dwarka Sector 21 to Yashbhoomi-Dwarka Sector 25 (opened on 17 September 2023). Phase IV, with six lines totaling Template:Convert, was finalized in July 2015. Of this, Template:Convert across three lines (priority corridors) with 45 stations was approved by the government of India for construction on 7 March 2019. The Golden Line was lengthened in October 2020, making the project Template:Convert long. Magenta Line's one station extension along the RK Ashram Marg opened on 5 January 2025 currently as far as Krishna Park Extension, with the rest of the network (Along with planned routes) is planned to be completed by at least 2029.[169][170]

Delhi Metro network
Line No. Line Name Opened[2] Last extension[2] Stations[171] Length (km)[171] Terminals Rolling stock[172] Track gauge
(mm)
1 style="background:#Template:Rail color; text-align: center;" |Red Line 25 December 2002[34] 9 March 2019[57] 29 34.55 Shaheed Sthal Rithala 31 trains, 219 coaches 1676
2 style="background:#Template:Rail color; text-align: center;" |Yellow Line 20 December 2004[34] 10 November 2015[58] 37 49.02 Samaypur Badli Millennium City Centre Gurugram 54 trains, 429 coaches
3 rowspan="2" style="background:#Template:Rail color; text-align: center;" |Blue Line 31 December 2005[36] 9 March 2019[59] 50 56.11 Noida Electronic City Dwarka Sector 21 60 trains, 480 coaches
4 7 January 2010[46] 14 July 2011[47] 8 8.51 Vaishali
5 rowspan="2" style="background:#Template:Rail color; text-align: center;" |Green Line 3 April 2010[48] 24 June 2018[60] 24 28.78 Inderlok Brigadier Hoshiyar Singh 20 trains, 80 coaches 1435
27 August 2011[49] Kirti Nagar
6 style="background:#Template:Rail color;text-align:center;" |Violet Line 3 October 2010[50] 19 November 2018[66] 34 46.34 Kashmere Gate Raja Nahar Singh 37 trains, 220 coaches
- style="background:#Template:Rail color;text-align:center;" |Airport Express Line 23 February 2011[52] 17 September 2023[67] 7 22.91 New Delhi Yashobhoomi Dwarka Sector 25 6 trains, 36 coaches
7 style="text-align:center; background:#Template:Rail color;" |Pink Line 14 March 2018[68] 8 March 2026[97] 46 73.49 Maujpur - Babarpur Shiv Vihar 48 trains, 286 coaches[173]
8 rowspan="2" style="background:#Template:Rail color; text-align: center;" |Magenta Line 25 December 2017[73] 5 January 2025[74] 26 40.26 Botanical Garden Krishna Park Extension 24 trains, 144 coaches
8 March 2026[97] 7 9.92 Deepali Chowk Majlis Park 24 trains, 144 coaches[173]
9 style="background:#Template:Rail color ; text-align: center;" |Grey Line 4 October 2019[75] 18 September 2021[76] 4 5.19 Dwarka Dhansa Bus Stand 3 trains, 17 coaches
Total 245
(25 double, 1 triple transfer)
374.47 - - 307 trains, 2055 coaches -

Expansion

Delhi

Delhi Metro Expansion Phase-V

Former DMRC managing director E. Sreedharan stated that by the time Phase IV is completed, the city will need Phase V to cope with increased population and transport needs.[77] Following extensions are planned as part of Phase-V.

Haryana

Template:Anchor

Bahadurgarh

Bahadurgarh or Rohtak do not have own separate metro network, these cities in Haryana state are or will be connected to Delhi by the Delhi Metro.

Faridabad

Faridabad and Palwal do not have own separate metro network, these cities in Haryana state are or will be connected to Delhi by Delhi Metro Violet Line.

  • Faridabad-Gurugram link (studied and DPR done): see below in Gurugram section.
  • Delhi-Palwal extension (studied and DPR done): extension of Delhi Metro Violet Line.
  • Palwal-Noida Airport extension (no studied done or approved): extension of Delhi Metro Violet Line.

Gurugram

Gurugram has own separate light metro network called the Rapid Metro Gurgaon, with the following several extensions planned:

  • Inter-city links

Template:Anchor

    • Faridabad-Gurugram link (studies and DPR done): from the existing Bata Chowk metro station on Delhi Metro Violet Line to Gurugram Vatika Chowk".[180][181][182]

Template:Anchor

    • Gurugram-IGI Airport link (studies and DPR done): from the Rezang La Chowk in Gurugram to the existing Delhi Orange Line Yashobhoomi Dwarka Sector 25 station for the IGI Airport.[183]
    • Gurugram-Southeast Delhi link (no studies done or approved): from Vatika Chowk on SPR in southeast Gurugram to Mehrauli in southeast Delhi, not yet approved and no studies done yet.
  • Intera-city links

Template:Anchor

    • Gurugram Metro Loop (studies and DPR done): from the existing Millennium City Centre Gurugram metro station to existing Cyber City station.[184][185] In March 2025, Haryana invited tenders to begin civil construction of 15 km section from Millennium City metro station to Sector 9 metro station.[186]
    • Radial lines within Gurugram such as the following:

Template:Anchor

      • North–south link or Old Gurugram Metro (studies and DPR done): from Kapashera to Manesar-Panchgaon (Pachgaon to integrate with RRTS station and WPE).[187][178]

Template:Anchor

      • Southwest-South link, 17 km, DPR underway: from Gurgaon railway station, Rajiv Chowk, Vatika Chowk on SPR (Souther Peripheral Road), and Bhondsi,[188] will connect to Metro extension from Millennium City Centre metro station at the Gurugram railway station and Delhi-Gurugram-Alwar RRTS line at Rajiv Chowk. In March 2025, Haryana invited tenders to hire consultant to prepare DPR for this route.[186]

Template:Anchor

      • East–west link (no studies done or approved): from Gurugram Golf Course Extension Road to Gurugram Sector 5 along Sheetla Mata Road, with stations at Millennium City Centre Gurugram metro station (existing), Signature Tower crossing, Rana Pratap Chowk, and Atul Kataria Chowk. In March 2025, Haryana invited tenders to hire consultant to prepare DPR for this route.[186]

Jhajjhar

Jhajjhar does not have own separate metro network, this city in Haryana state will be connected to Delhi in future by extension to the Delhi Metro.

Sonipat

Sonipat does not have own separate metro network, Sonepat city in Haryana state will be connected to Delhi in future through extensions to the Delhi Metro in the following two phases:

Uttar Pradesh

Template:Anchor

Ghaziabad

Following are the extensions of Delhi Metro as Ghaziabad does not have separate Metro network.

Noida

Template:Main

Noida has own separate network called Noida Metro, which connects to the Delhi Metro.

Template:AnchorIntegration with RRTS

Delhi RRTS system, a RapidX "Regional Rapid Transit System" (RRTS) which aims to connect Delhi with its neighbouring cities via eight lines of semi-high-speed trains operating at a maximum speed of Template:Convert. Phase I of the project consists of three corridors: Delhi–Meerut, Delhi–Alwar, and Delhi–Panipat corridor. The Delhi–Meerut corridor, also known as the Delhi–Meerut RRTS, is currently under development by the National Capital Region Transport Corporation (NCRTC).[199][200][201]

The Delhi–Meerut RRTS is Template:Cvt long and costs Template:INRConvert. It will comprise 14 stations (with nine additional stations for the Meerut Metro) and two depots. Three of the 14 stations (Sarai Kale Khan, New Ashok Nagar, and Anand Vihar) will be in Delhi, and are planned for seamless integration with the Delhi Metro.[202][203]

Operations

Exterior of a modern building
Millennium City Centre Gurugram metro station
See caption
Platform screen doors at the New Delhi metro station

Trains operate at a frequency of one to two minutes to five to ten minutes between 05:00 and 00:00, depending upon peak and off-peak hours. They typically travel up to Template:Convert, and stop for about 20 seconds at each station. Automated station announcements are in Hindi and English. Many stations have ATMs, food outlets, cafés, convenience stores and mobile recharge. Eating, drinking, smoking, and chewing gum are prohibited. The metro has a sophisticated fire alarm system for advance warning in emergencies, and fire retardant material is used in trains and stations.[204] Navigation information is available on Google Maps.[205] Since October 2010, the first coach of every train is reserved for women; the last coach is also reserved when the train changes tracks at the terminal stations on the Red, Green and Violet Lines.[206][207] The mobile Delhi Metro Rail app has been introduced for iPhone and Android users with information such as the location of the nearest metro station,[208] fares, parking availability, nearby tourist attractions, security and emergency helpline numbers.[209]

Security

Security has been provided by the CISF Unit DMRC since 2007.[210] Closed-circuit cameras monitor trains and stations, and their feeds are monitored by the CISF and Delhi Metro authorities.[211] Over 7,000 CISF personnel have been deployed for security in addition to metal detectors, X-ray baggage-inspection systems, and detection dogs. Eighteen Delhi Metro Rail Police stations have been established, and about 5,200 CCTV cameras have been installed. Each underground station has 45 to 50 cameras, and each elevated station has 16 to 20 cameras. The cameras are monitored by the CISF and the Delhi Metro Rail Corporation.[212] Intercoms are provided in each train car for emergency communication between passengers and the train operator.[213] Periodic security drills are carried out at stations and on trains.[214] The DMRC is considering raising station walls and railings for passenger safety.[215]

A token with a picture of a train
A Delhi Metro token

The metro's fares were last revised on 10 October 2017, based on the recommendation of the 4th Fare Fixation Committee in May 2016.[216][217] Metro commuters have five choices for ticket purchases:[218]

  • RFID token: RFID tokens are valid only for a single journey on the day of purchase. Their value depends on the distance travelled, with fares for a single journey ranging from Template:INRConvert to Template:INRConvert. Fares are calculated based on the distance between the origin and destination stations. As of 2024 they are no longer in use.[216]
  • Smart card: Smart cards are available for longer terms, and are the most convenient for frequent commuters. Valid for ten years from the date of purchase or the date of the last recharge, they are available in denominations of Template:INRConvert to Template:INRConvert. A 10-percent discount is given, with an additional 10-percent discount for off-peak travel.[219] A new card has a Template:INRConvert deposit, refundable on its return before expiry if physically undamaged.[220] For women commuters, the Delhi government unsuccessfully proposed a fare-exemption scheme.[221][222] A common ticketing facility, allowing commuters to use smart cards on Delhi Transport Corporation (DTC) buses and the metro, was introduced on 28 August 2018.[223]
  • Tourist card: Tourist cards can be used for unlimited travel on the Delhi Metro for short periods of time. There are two kinds of tourist cards, valid for one and three days. The cost of a one-day card is Template:INRConvert and a three-day card is Template:INRConvert, including a refundable deposit of Template:INRConvert paid at purchase.[224]
  • National Common Mobility Card: Part of the Indian government's One Nation, One Card policy, the National Common Mobility Card is an inter-operable transport card enabling a user to pay for travel, tolls, shopping and cash.[225][226][227] Enabled through RuPay, the NCMC was commissioned on the Airport Express Line on 28 December 2020.[228] In June 2023, DMRC completed the upgrade of its automatic fare collection (AFC) systems to be compliant with NCMC services.[229][230]
    Paper QR ticket
    Delhi Metro QR ticket
  • QR code based ticketing: A Delhi Metro QR ticket is a mobile-based ticket allowing travel like a token or recharge card.[231][232] A ticket can be bought online with the RIDLR app. For entry and exit, the QR ticket is scanned at the AFC gates. Similar to mobile-based tickets, paper QR tickets can be bought at a station.[233][234][235]

Problems

An urban landscape
The Yellow Line near the IFFCO Chowk metro station in Gurgaon. After complaints from nearby residents, the Delhi Metro installed barriers in 2011 to reduce noise pollution from metro trains.[236]
Exterior of a large station
The Jasola Apollo metro station

As the metro has expanded, high ridership on new trains has led to increasing overcrowding and delays.[237][238] To alleviate the problem, eight-coach trains have been introduced on the Yellow and Blue Lines and more-frequent trains have been proposed.[237] Infrequent, overcrowded and erratic feeder bus services connecting stations to nearby localities have also been a concern.[239][240] Although the quality and cleanliness of the Delhi Metro have been praised, rising fares have been criticized; fares are higher than those of the bus services the metro replaced.[14] According to a recent study, Delhi Metro fares are the second-most unaffordable among metros charging less than US$0.5 per ride.[241] Another study finds that Delhi Metro may also have a low ridership problem compared to its size and may not be generating the amount of traffic a metro system generates.[242]

Feeder buses

Front view of a bus
A DMRC electric feeder bus at the Anand Vihar metro station

DMRC began its feeder bus service in 2007 with a fleet of 117 minibuses on 16 routes.[243][244] In January 2024, it had a fleet of 47 electric feeder buses on five routes to nine metro stations: Kashmere Gate, Gokulpuri, Shastri Park, Laxmi Nagar, East Vinod Nagar - Mayur Vihar-II, Anand Vihar, Dilshad Garden, Vishwavidyalaya, and GTB Nagar. The routes are:[245][246][247]

Ridership

Note that DMRC reports different metrics versus the daily ridership below. DMRC report "daily passenger journeys" - for example, in 2022–23, DMRC reported that average daily passenger journeys were approx 4.63 million per day as compared to 5.16 million per day in 2019-20 (pre-Covid).[248]

Metro service was suspended on 25 March 2020 due to the COVID-19 pandemic.[249] Operations resumed on 12 September 2020,[250] and the average daily ridership fell to 8.78 lakh (0.88 million) in FY 2020–21.[251]

The maximum daily ridership (passenger journeys) of 7.86 million was reported on 18 November 2024.[252]

Template:Bar chart * Includes Rapid Metro Gurgaon

^ From 2019 onwards the DMRC changed the ridership calculation to count every trip taken by a passenger on a line. This means that a passenger that takes 2 connections will count 3 times towards ridership. This is different from the more standard practice of counting entire journeys applied in other metro systems.[253] Therefore, Delhi metro reports approximately 55% higher ridership when compared to similar transit systems worldwide.[254]

Finances

Summary financials

Template:ChartDirect Source:[255][256][257][258][259][260][261][262][263]
[264][265][266][267][268][269][270][271][272][273][274]

The Delhi Metro has been operating with a loss in EBT (earnings before taxes) since 2010, although the loss has shrunk since 2015–16. Its EBITDA (earnings before interest, taxes, depreciation, and amortization) declined from 73 percent in FY 2007 to 27 percent in FY 2016–17 before improving to 30 percent in 2017–18. The metro began a naming policy for stations in 2014, awarded by an open e-tendering process, to generate non-fare revenue.[275][276][277]

Funding and Capitalisation

DMRC is owned by the government of the National Capital Territory of Delhi and the government of India. Total debt was Template:INRConvert in March 2016, and equity capital was Template:INRConvert. The cost of the debt is zero percent for Union Government and Delhi Government loans, and from 0.01 and 2.3 percent for Japan International Cooperation Agency (JICA) loans. On 31 March 2016, Template:INRConvert was paid-up capital; the rest is reserves and surplus.[264]

Depots

As of March 2026, the Delhi Metro has 16 operational depots, with 3 more under construction.

Delhi Metro Depots
Line Line name Number of depots Location Opening date
1 rowspan="2" style="background:#Template:Rail color; text-align: center;" | Red Line 1 Shastri Park 25 December 2002
Narela Under construction
2 rowspan="3" style="background:#Template:Rail color; text-align: center;" | Yellow Line 3 Khyber Pass 20 December 2004
Sultanpur 21 June 2010
Samaypur Badli 28 May 2020
3 / 4 rowspan="2" style="background:#Template:Rail color; text-align: center;" | Blue Line 2 Najafgarh 31 December 2005
Yamuna Bank 10 May 2009
5 rowspan="2" style="background:#Template:Rail color; text-align: center;" |Green Line 2 Mundka 2 April 2010
Bahadurgarh 24 June 2018
6 rowspan="2" style="background:#Template:Rail color; text-align: center;" |Violet Line 2 Sarita Vihar 3 October 2010
Neelam Chowk Ajronda 6 September 2015
- style="background:#Template:Rail color; text-align: center;" | Airport Express 1 Dwarka Sector 21 23 February 2011
7 rowspan="2" style="background:#Template:Rail color; text-align: center;" |Pink Line 2 Mukundpur 14 March 2018
Vinod Nagar - Ghazipur 31 October 2018
8 rowspan="3" style="background:#Template:Rail color; text-align: center;" |Magenta Line 2 Kalindi Kunj - Jasola Vihar 25 December 2017
Mukundpur 8 March 2026
Indraprastha Under construction
9 style="background:#Template:Rail color; text-align: center;" | Grey Line 1 Najafgarh 4 October 2019
10 style="background:#Template:Rail color; text-align: center;" | Golden Line 1 Sarita Vihar Depot Under construction

Some depots, such as Shastri Park and Yamuna Bank, are near their respective at-grade station complexes; others, such as Sarita Vihar and Mundka, are joined indirectly to the main line. The Najafgarh depot is unique in housing both broad gauge and standard gauge trains from the Blue and Grey Lines, respectively; the Sarita Vihar depot will house Violet and Golden Line trains in the future.[278] The Phase III Kalindi Kunj and Vinod Nagar depots were built differently due to land-acquisition issues; the former has an extra elevated stabling yard adjacent to the Jasola Vihar - Shaheen Bagh station, and the latter has two sub-depots (one with two floors). An elevated stabling yard was also built adjacent to the Noida Electronic City station, but it is not considered a depot.[279] As part of Phase IV, the Mukundpur depot will be expanded to accommodate the Pink and Magenta Lines[280][281] without land-acquisition issues.[282]

See caption
A Phase I broad-gauge Mitsubishi CorporationBEML train[283]
See caption
A Phase II broad-gauge Bombardier train

The metro has two rail gauges. Phase I lines have Template:Track gauge broad gauge rolling stock, while all the newer lines have Template:Railgauge rolling stock.[284][285] As mentioned in the above table, trains are maintained at 15 depots across Delhi.[286][287] Maglev trains were considered for some Phase III lines, but DMRC decided to continue with conventional rail in August 2012.[288]

By 31 March 2015, the company had a total of 1,306 coaches (220 trains). In addition to line extensions, two new lines (7 and 8) were proposed in Phase III. Unattended train operation (UTO) will be in 486 coaches (81 six-car trains). An additional 258 broad-gauge (BG) coaches for Lines 1 to 4 and 138 standard-gauge (SG) coaches for Lines 5 and 6 were proposed. At the end of Phase III, there would be 2,188 coaches (333 trains). Except for a few four-car trains on Line 5, 93 percent of the trains would have a six- or eight-car configuration at the end of Phase III.[263]

Broad gauge

Rolling stock is provided by two major suppliers. Phase I rolling stock was supplied by a consortium of companies (Hyundai Rotem, Mitsubishi Corporation, and MELCO). The coaches look similar to the MTR Rotem EMU, but have only four doors; sliding doors, instead of plug doors, are used. The coaches were initially built in South Korea by Rotem,[287] then in Bangalore by BEML through a technology transfer arrangement.[289] The trains consist of four lightweight Template:Convert stainless-steel coaches with vestibules (permitting movement throughout them) and can carry up to 1,500 passengers,[290] with 50 seated and 330 standing passengers per coach.[291] The coaches are air-conditioned, equipped with automatic doors, microprocessor-controlled brakes and secondary air suspension,[292] and can maintain an average speed of Template:Convert over a distance of Template:Convert.[291] The system is extendable to eight coaches, and platforms have been designed accordingly.[290]

Phase II rolling stock is supplied by Bombardier Transportation, which received an order for 614 cars at a cost of about Template:USD.[293] Although the initial trains were made in Görlitz, Germany and Sweden, the remainder will be built at Bombardier's factory in Savli (near Vadodara).[294] The four- and six-car trains have a capacity of 1,178 and 1,792 commuters each, respectively. Coaches have closed-circuit television (CCTV) cameras with eight-hour backup, chargers for cell phones and laptops, and improved climate control.[295]

Standard gauge

Standard-gauge rolling stock is manufactured by BEML at its factory in Bangalore, and most of these trains are supplied to BEML by Hyundai Rotem. The four-car trains have a capacity of 1,506 passengers,[296] accommodating 50 seated and 292 standing passengers in each coach.[291] The trains, with CCTV cameras in and outside the coaches, chargers for mobile phones and laptops, improved climate control and microprocessor-controlled disc brakes,[297] will be capable of maintaining an average speed of Template:Convert over a distance of Template:Convert.[291]

Airport Express

Eight six-car trains supplied by CAF Beasain were imported from Spain.[298] CAF held five-percent equity in the DAME project, and Reliance Infrastructure held the remaining 95 percent[299] before DMRC took over operations. Trains on this line have noise reduction and padded fabric seats. Coaches are equipped with LCD screens for entertainment and flight information. Trains have an event recorder which can withstand high levels of temperature and impact, and wheels have a flange-lubrication system for reduced noise and improved comfort.[206]

Signaling and telecommunication

Interior of a metro car, with limited seating
Interior of a Mitsubishi Corporation coach
Elevated-train signal, with high-rise buildings in the background
Metro signal

The metro uses cab signaling with a centralised automatic train control system consisting of automatic operation, protection and signaling modules.[300] A 380 MHz digital trunked TETRA radio communication system from Motorola Solutions is used on all lines to carry voice and data information.[301] For the Blue Line, Siemens supplied the electronic interlocking Sicas, the Vicos OC 500 operation-control system and the LZB 700 M automation-control system.[302] An integrated system with optical fibre cable, on-train radio, CCTV, and a centralised clock and public address system is used for telecommunication during normal operations and emergencies.[303] Alstom supplied the signaling system for the Red and Yellow Lines, and Bombardier Transportation supplied its CITYFLO 350 signaling system for the Green and Violet Lines.

The Airport Express line introduced WiFi service at all its stations on 13 January 2012.[304] Connectivity in trains is expected in the future. WiFi service is provided by YOU Broadband and Cable India.[305] In August 2017, Wifi service began at all the 50 stations of the Blue Line.[306] A fully automated, operator-less train system was offered to the metro by the French technology firm Thales.[307]

Environment and aesthetics

See caption
A rooftop solar-power system at the Anand Vihar metro station

The metro has received awards for environmentally-friendly practices from organisations including the United Nations,[308] RINA,[309] and the International Organization for Standardization;[309] it is the second metro in the world, after the New York City Subway, to be ISO 14001 certified for environmentally-friendly construction.[310] By March 2023, 64 metro stations, four sections on the central verge between piers, and 12 other Phase I and II locations on the network have rainwater harvesting for environmental protection;[311][312] all 27 Phase-IV elevated stations will also harvest rainwater, and 52 recharge pits are being constructed for this purpose.[313] It is the world's first railway project to earn carbon credits after being registered with the United Nations under the UN's Clean Development Mechanism,[314] and has earned 400,000 carbon credits with the regenerative braking systems on its trains.[315]

DMRC installed the metro's first rooftop solar power plant at the Dwarka Sector-21 station in 2014. The network received 35 percent of its energy from renewable sources by April 2023, which it intends to increase to 50 percent by 2031. Of this, 30 percent comes from the Rewa Ultra Mega Solar park in Madhya Pradesh;[316] four percent (50 MWp) comes from rooftop solar panels, and one percent comes from a waste-to-energy plant in Ghazipur.[317][318] DMRC has installed solar panels at 142 locations: 15 depots, 93 stations, and 34 other buildings.[317][319]

The metro has been promoted as an integral part of community infrastructure, and artwork depicting the local way of life has been displayed at stations.[14]Template:Rp Students at local art colleges have designed murals at metro stations,[320] and the viaduct pillars of some elevated sections have been decorated with mosaic murals created by local schoolchildren.[321] The metro station at INA Colony has a gallery of artwork and handicrafts from across India,[322] and all stations on the Central Secretariat – Qutub Minar section of the Yellow Line have panels depicting Delhi's architectural heritage.[323] The Nobel Memorial Wall at Rajiv Chowk has portraits of the seven Indian Nobel laureates: Rabindranath Tagore, CV Raman, Hargobind Khorana, Mother Teresa, Subrahmanyan Chandrasekhar, Amartya Sen and Venkatraman Ramakrishnan.

A number of films have been shot in the Delhi Metro;[324][325] the first was Bewafaa in November 2005.[326] Delhi-6, Love Aaj Kal, PK, and Paa also have scenes filmed inside Delhi Metro trains and stations.[327][328] Bang Bang! was filmed near the Mayur Vihar Extension metro station in March 2014,[329][330] and the 2019 film War was filmed in the metro.[331]

See also

Template:Portal bar

Notes

Template:Notelist

References

  1. After 5 years of riding the New York City subway, I tried the Delhi Metro at the busiest time of the year – and it showed me exactly what I'm missing. Business Insider(24 November 2018). Retrieved 24 February 2019.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 Present Network. www.delhimetrorail.com. Retrieved February 19, 2025.
  3. DMRC Services Update. delhimetrorail.com. Delhi Metro Rail Corporation (DMRC)(24 October 2023). Retrieved 14 November 2023.
  4. Delhi Metro: It all started 15 Xmas days ago, Roy, Sidharatha. The Times of India(25 December 2017). Retrieved 16 January 2018.
  5. DMRC's remarkable growth: Delhi Metro surpasses 390 kms, becomes India's longest metro network(18 September 2023). Retrieved 19 September 2023.
  6. Project Update an Janakpuri West – R. K. Ashram Marg corridor. Retrieved 25 April 2022.
  7. Delhi Metro to join global club of metro networks having span of over 300 km. The Times of India(29 October 2018). Retrieved 29 October 2018.
  8. PM inaugurates KMP expressway, Ballabhgarh-Mujesar Metro rail link. Retrieved 20 November 2018.
  9. 9.0 9.1 Cite error: Invalid <ref> tag; no text was provided for refs named introduction
  10. Delhi Metro takes over operations of Gurgaon Rapid Metro. mint(23 October 2019). Retrieved 16 April 2022.
  11. Delhi Metro handles 235.8 crore passenger journeys in 2025. Daily Pioneer(18 January 2024). Retrieved 19 March 2026.
  12. A comprehensive report on Metro rail systems in India(19 February 2021).
  13. Delhi-NCR travel boost: RRTS, metro together solve connectivity puzzle; Namo Bharat stations integrated with DMRC. The Times of India(2025-09-16). Retrieved 2025-10-13.
  14. 14.0 14.1 14.2 14.3 14.4 Message in a Metro: Building Urban Rail Infrastructure and Image in Delhi, India. International Journal of Urban and Regional Research({Template:Date).
  15. 15.0 15.1 History of Delhi Metro. DMRC. Retrieved 17 September 2009.
  16. The Crisis of Public Transport in India. Journal of Public Transportation({Template:Year).
  17. The derailment of E Sreedharan. TOI(2 March 2021). Retrieved 4 March 2021.
  18. Structure of Delhi Metro. DMRC. Retrieved 17 September 2009.
  19. Sreedharan calls it a day; Mangu Singh takes over as new chief of Delhi Metro. NDTV.com. Retrieved 2023-11-06.
  20. Breaking Ground: A Narrative on the Making of Delhi Metro. jica.go.jp. Retrieved June 4, 2024.
  21. Delhi metro rail work begins but without fanfare. The Indian Express.
  22. Delhi Metro showcases public sector success. The Indian Express(13 April 2007). Retrieved 10 September 2009.
  23. Template:Cite report
  24. 二零零一度. MTR Corporation. Retrieved 3 August 2017.
  25. Delhi Metro Rail to adopt BG system. Business Line. The Hindu(7 August 2000). Retrieved 16 January 2018.
  26. Template:Cite report
  27. Template:Cite report
  28. Indian PM launches Delhi metro. BBC News(24 December 2002). Retrieved 22 April 2010.
  29. The Tribune, Chandigarh, India – Delhi and neighbourhood. The Tribune. Retrieved 12 February 2017.
  30. The Tribune – Magazine section – Saturday Extra. The Tribune. Retrieved 12 February 2017.
  31. Template:Cite magazine
  32. 32.0 32.1 Economic Survey of Delhi 2022–23. Retrieved 30 March 2023.
  33. 33.0 33.1 Economic Survey of Delhi 2014-15.
  34. 34.0 34.1 34.2 34.3 34.4 34.5 34.6 25 years of DMRC! How Delhi Metro has become a lifeline for the national capital – from 1995 to 2019. Financialexpress(2019-05-07). Retrieved 2024-04-30.
  35. Delhi Metro goes underground. The Times of India(2005-07-02). Retrieved 2024-04-30.
  36. 36.0 36.1 PM inaugurates Barakhamba-Dwarka Metro line. The Times of India(2005-12-30). Retrieved 2024-04-30.
  37. Barakhamba-Indraprastha section of Metro opens. Hindustan Times(2006-11-11). Retrieved 2024-04-30.
  38. Metro comes to Dilshad Garden. Hindustan Times(2008-06-03). Retrieved 2024-04-27.
  39. DU-Jahangirpuri Metro line flagged off, opens to public from today. The Indian Express(2009-02-04). Retrieved 2024-04-27.
  40. Delhi Metro reaches Gurgaon, brings smiles to residents. India Today(2010-06-21). Retrieved 2024-04-27.
  41. Chattarpur station to open today. The Times of India(2010-08-26). Retrieved 2024-04-25.
  42. Central Secretariat-Qutub Minar Metro line gets operational. India Today(2010-09-03). Retrieved 2024-04-27.
  43. Delhi Metro chugs into East Delhi. The Indian Express(2009-05-10). Retrieved 2024-04-27.
  44. Delhi Metro enters Noida, to open to public tomorrow. The Times of India(2009-11-12). Retrieved 2024-04-27.
  45. Noida Metro line extended to Dwarka Sec-21. The Economic Times(2010-10-30). Retrieved 2024-04-27.
  46. 46.0 46.1 Anand Vihar Metro line opens for public. Zee News(2010-01-07). Retrieved 2024-04-30.
  47. 47.0 47.1 Delhi Metro begins service to Ghaziabad. India Today(2011-07-14). Retrieved 2024-04-27.
  48. 48.0 48.1 Metro's Green Line opened. The Hindu(2010-04-02). Retrieved 2024-04-26.
  49. 49.0 49.1 Kirti Nagar-Ashok Park Metro opens to public. Zee News(2011-08-27). Retrieved 2024-04-27.
  50. 50.0 50.1 Metro to JLN Stadium from today. The Indian Express(2010-10-03). Retrieved 2024-04-27.
  51. DMRC opens Sarita Vihar-Badarpur section. The Hindu(2011-01-14). Retrieved 2024-04-27.
  52. 52.0 52.1 Airport Express Corridor opens; reach IGI in 18 minutes. The Hindu(2011-02-23). Retrieved 2024-04-27.
  53. Airport Metro gets 2 new stations. Hindustan Times(2011-08-15). Retrieved 2024-04-25.
  54. 54.0 54.1 Funding. delhimetrorail.com. Delhi Metro Rail Corporation(5 April 2019). Retrieved 12 January 2022.
  55. Delhi Metro rings in the New Year under new chief. Jagran Post(1 January 2012). Retrieved 16 January 2018.
  56. Economic Survey of Delhi 2023–24, Chapter 12: Transport. Retrieved 28 March 2024.
  57. 57.0 57.1 PM flags off Red Line extension. The Hindu(2019-03-08). Retrieved 2022-04-25.
  58. 58.0 58.1 Naidu, Kejriwal to flag-off Jahangirpuri-Samaypur Badli extension of Delhi Metro. Zee News(2015-11-10). Retrieved 2024-04-26.
  59. 59.0 59.1 Blue Line Metro: PM Modi inaugurates Delhi Metro's Blue Line extension | Noida News. The Times of India(9 March 2019). Retrieved 9 March 2019.
  60. 60.0 60.1 Delhi Metro Green Line: Mundka-Bahadurgarh section inaugurated by PM Modi; 5 facts every commuter should know. Financialexpress(2018-06-24). Retrieved 2024-04-26.
  61. Delhi metro's first interchange station inaugurated at Punjabi Bagh, connects Green line to Pink line. Home News India(March 29, 2022). Retrieved March 31, 2022.
  62. Delhi Metro's Mandi House-Central Secretariat line opens. The Times of India(2014-06-26). Retrieved 2024-04-26.
  63. Delhi Metro services begin on ITO-Mandi House section. Zee News(2015-06-08). Retrieved 2024-04-26.
  64. PM Narendra Modi inaugurates Badarpur-Faridabad metro line. Business Today(2015-09-06). Retrieved 2024-04-26.
  65. Delhi Metro's ITO-Kashmere Gate 'Heritage Line' opens for public. Business Standard(28 May 2017). Retrieved 26 April 2024.
  66. 66.0 66.1 Delhi Metro Violet Line: PM Modi flags off new Escorts Mujesar-Ballabhgarh section; check route, stations. Financialexpress(2018-11-19). Retrieved 2024-04-26.
  67. 67.0 67.1 Airport Line extension opens for passengers, ends at YashoBhoomi Dwarka Sector 25 station. The Times of India(2023-09-17). Retrieved 2024-04-26.
  68. 68.0 68.1 Majlis Park-South Campus corridor of Delhi Metro's Pink Line inaugurated. The Times of India(2018-03-14). Retrieved 2024-04-26.
  69. Delhi Metro's South Campus-Lajpat Nagar section on Pink Line inaugurated. Hindustan Times(2018-08-06). Retrieved 2024-04-26.
  70. Delhi Metro's Pink Line from Shiv Vihar to Trilokpuri now open for public. Business Today(2018-10-31). Retrieved 2024-04-26.
  71. Delhi metro pink line: Lajpat Nagar-Mayur Vihar Pocket 1 corridor inaugurated. The Times of India(2018-12-31). Retrieved 2024-04-26.
  72. Pink Line: Cut Travel Time & Save Money As Trilokpuri - Mayur Vihar Pocket 1 To Open Today. news.abplive.com(2021-08-06). Retrieved 2024-04-25.
  73. 73.0 73.1 Delhi Metro's Magenta Line open to public from 5 pm; expected to ferry over 3.6 lakh commuters daily. Firstpost(2017-12-25). Retrieved 2024-04-26.
  74. 74.0 74.1 Delhi Metro's Kalkaji Mandir-Janakpuri West stretch inaugurated. Hindustan Times(2018-05-28). Retrieved 2024-04-26.
  75. 75.0 75.1 Delhi Metro's Grey Line connecting Dwarka and Najafgarh inaugurated. Business Today(2019-10-04). Retrieved 2024-04-26.
  76. 76.0 76.1 Grey Line: Delhi Metro's Najafgarh-Dhansa Bus Stand corridor inaugurated. The Hindu(2021-09-18). Retrieved 2024-04-25.
  77. 77.0 77.1 Metro to cover whole of Delhi by 2012. The Economic Times(11 December 2011). Retrieved 8 April 2012.
  78. Jung wants better access to all Metro stations. The Indian Express(23 April 2014). Retrieved 24 April 2014.
  79. Template:Cite press release
  80. Tunnelling work starts for Metro's Phase III. The Economic Times(31 January 2012). Retrieved 8 April 2012.
  81. 81.0 81.1 Will not let funding row derail Phase-IV: Government Template:Webarchive, The Economic Times, 4 July 2017.
  82. Grey Line's Najafgarh-Dhansa Bus Stand Corridor To Open For Services Tomorrow. NDTV(17 September 2021). Retrieved 12 January 2022.
  83. Airport Line extension opens for passengers, ends at YashoBhoomi Dwarka Sector 25 station. The Times of India(2023-09-17). Retrieved 2023-10-01.
  84. PM Modi launches India's first driverless metro train in Delhi. Here's all you need to know. The Print(28 December 2020). Retrieved 12 January 2022.
  85. Driverless train operations on Pink Line flagged off. Money Control(25 November 2021). Retrieved 12 January 2022.
  86. Delhi Metro ridership only half of the figure projected by DMRC: CAG report, Chitlangia, Risha. Hindustan Times(3 December 2021). Retrieved 12 January 2022.
  87. Report No.11 of 2021 - Performance Audit on Implementation of Phase III, Delhi Mass Rapid Transit System by DMRC, Ministry of Housing and Urban Affairs. cag.gov.in. Comptroller and Auditor General of India(2 December 2021). Retrieved 12 January 2022.
  88. Delhi metro average train frequency during peak and off-peak hours (As on 31.12.2021). delhimetrorail.com. DMRC. Retrieved 12 January 2022.
  89. Report No.11 of 2021 - Performance Audit on Implementation of Phase III, Delhi Mass Rapid Transit System by DMRC, Ministry of Housing and Urban Affairs. cag.gov.in. Comptroller and Auditor General of India(2 December 2021). Retrieved 12 January 2022.
  90. Delhi Metro's Much-awaited Phase 4 Gets AAP Govt's Nod, Likely to be Ready by 2024. News18(2018-12-20). Retrieved 2022-05-16.
  91. Delhi Metro: Cabinet approves three corridors of Delhi Metro Phase IV. The Economic Times. Retrieved 2022-05-16.
  92. Completion targets of Metro Phase-4 will depend on Covid-19 scenario: DMRC. Hindustan Times(20 June 2021). Retrieved 11 January 2022.
  93. Delhi Metro Phase-4 gets government nod Template:Webarchive, The Times of India, 6 January 2017.
  94. Delhi Metro map to cover Greater Noida. The Hindu(25 December 2006). Retrieved 10 September 2009.
  95. Pvt metro link to get Central nod soon. The Times of India(30 January 2010). Retrieved 2 February 2010.
  96. Delhi Metro: DMRC to come up with elevated road network below these 3 new lines Template:Webarchive, The Financial Express, 21 December 2018.
  97. 97.0 97.1 97.2 97.3 97.4 PM Modi inaugurates two new Delhi Metro corridors: Key details of Pink and Magenta line extension. Hindustan Times(2026-03-08). Retrieved 2026-03-08.
  98. 98.0 98.1 Work begins on Delhi Metro Phase-IV. The Hindu(31 December 2019). Retrieved 31 December 2019.
  99. 99.0 99.1 First section of Delhi Metro phase-IV to open by July 2024, says DMRC chief. TimesNow(2023-11-05). Retrieved 2023-11-24.
  100. Cabinet approves two corridors of Delhi Metro Phase-IV projects namely (i) Lajpat Nagar to Saket G-Block and (ii) Inderlok to Indraprastha(March 13, 2024). Retrieved 13 March 2024.
  101. Cabinet okays two new Delhi Metro corridors at ₹8400 crore project cost | All you need to know. Hindustan Times(2024-03-13). Retrieved 2024-03-13.
  102. 102.0 102.1 Delhi Metro Update: Two new metro lines announced for National Capital! Inderlok to Indraprastha and Lajpat Nagar to Saket G Block - Here' all you need to know - Infrastructure News | The Financial Express. www.financialexpress.com(2024-03-13). Retrieved 2024-03-14.
  103. Golden Line: DMRC begins work on Lajpat Nagar-Saket G block metro corridor. The Economic Times(2025-12-12). Retrieved 2025-12-12.
  104. Delhi Metro: Red Line to Extend to Kundli in Haryana, Check Station Names - News18. News18. Retrieved 2025-12-12.
  105. Union Cabinet approves Rithala-Kundli corridor of Delhi Metro. The Hindu(2024-12-06). Retrieved 2025-12-12.
  106. 106.0 106.1 106.2 Cabinet approves 3 new corridors of Delhi Metro worth ₹12,015 crore; PM Modi says, Delhi Metro expansion to boost ‘Ease of Living’ in national capital. News on air(2015-12-25). Retrieved 2026-02-26.
  107. Delhi Metro bridge collapses; 1 dead. IBN Live(19 October 2008). Retrieved 19 October 2008.
  108. A chronology of Delhi Metro accidents. Hindustan Times(12 July 2009). Retrieved 22 January 2018.
  109. Day 2: 3 cranes fall, Metro image takes beating. The Times of India(14 July 2009). Retrieved 22 January 2018.
  110. Labourer dies at Delhi Metro construction site. Central Chronicle(22 July 2009). Retrieved 22 April 2010.
  111. City's nightmare on wheels. Hindustan Times(7 December 2009). Retrieved 22 January 2018.
  112. Five injured as iron girder falls off Metro structure in Ghaziabad. Hindustan Times(23 April 2018).
  113. Delhi Metro Red Line. Retrieved 20 September 2016.
  114. 114.0 114.1 On May 2, Metro to cross the Yamuna again. The Times of India(24 April 2009). Retrieved 16 January 2018.
  115. Template:Cite press release
  116. Passengers swamp Delhi's new metro. The Sydney Morning Herald(27 December 2002). Retrieved 16 January 2018.
  117. 70,000 travel by Tri Nagar-Tis Hazari Metro rail. The Times of India(5 October 2003). Retrieved 16 January 2018.
  118. 118.0 118.1 118.2 Metro Station Information. DMRC. Retrieved 29 March 2009.
  119. DMRC to introduce six-coach trains on Dilshad Garden-Rithala line on Sunday. The Times of India(23 November 2013). Retrieved 16 January 2018.
  120. Eight-coach trains introduced on Red line: Delhi Metro. The Times of India(8 November 2022). Retrieved 20 February 2023.
  121. A subterranean journey begins. The Times of India(20 December 2004). Retrieved 22 January 2018.
  122. 122.0 122.1 Delhi Metro Museum Celebrates 3rd Anniversary. RailNews Media India Ltd.
  123. Hauz Khas set to get deepest underground metro station by March 2016. The Indian Express(16 September 2014). Retrieved 22 January 2018.
  124. Template:Cite press release
  125. Chattarpur station to open today. The Times of India(26 August 2010). Retrieved 22 January 2018.
  126. Gurgaon gets a lifeline as CST-Qutub corridor opens. Sify News(8 September 2010). Retrieved 22 January 2018.
  127. The Jahangirpuri- Samaypur Badli section (Extension of Line-2). Retrieved 9 November 2015.
  128. New Delhi Metro station, your connect with National rail. The Times of India(29 June 2005). Retrieved 22 January 2018.
  129. Secretariat to DU in 18 minutes flat. The Hindu(1 July 2005). Retrieved 22 January 2018.
  130. Metro Museum. museum.delhimetrorail.com. Retrieved 2022-07-21.
  131. 131.0 131.1 Metro enters Noida, set to change travelling habits of people. Daily News and Analysis(12 November 2009). Retrieved 12 January 2009.
  132. 132.0 132.1 Metro to travel underground and overhead. The Times of India(28 December 2005). Retrieved 4 April 2010.
  133. Delhi Metro just got bigger and better. The Hindu(12 November 2006). Retrieved 4 April 2010.
  134. Delhi Anand Vihar Metro line opens for public. The Economic Times(7 January 2010). Retrieved 8 January 2010.
  135. Template:Cite press release
  136. Template:Cite press release
  137. PM Modi flags off Noida City Centre-Noida Electronic City section of Delhi Metro 's Blue Line | Business News. timesnownews.com(9 March 2019). Retrieved 20 March 2019.
  138. 40000 Footfalls at Anand Vihar Metro on Day 1. Outlook India(7 January 2010). Retrieved 4 April 2010.
  139. Metro gets first standard gauge depot. The Hindu(23 February 2010). Retrieved 16 January 2018.
  140. 140.0 140.1 Metro from Central Secretariat to Sarita Vihar too. Yahoo! News(3 October 2010). Retrieved 16 January 2018.
  141. Train services on Delhi Metro's Central Secretariat to Sarita Vihar section will start one hour late (from 7 am) from October 17 to October 24 for integration of the section with the extension to Badarpur., Suri, Megha. The Times of India(16 October 2010). Retrieved 16 January 2018.
  142. DMRC opens Sarita Vihar–Badarpur section. Hindustan Times(14 January 2011). Retrieved 14 January 2011.
  143. Janpath to Faridabad: On Sunday morning, a Metro ride for PM Modi. Hindustan Times(6 September 2015). Retrieved 6 September 2015.
  144. Faridabad Metro Stations get highest Green Building Rating. delhimetrorail.com.
  145. NCR's longest Metro line in Faridabad, Ray, Subhendu. Hindustan Times(23 January 2012). Retrieved 16 January 2018.
  146. Delhi: Kashmere Gate set to become biggest interchange station. The Indian Express(26 May 2017). Retrieved 15 January 2018.
  147. 147.0 147.1 147.2 Delhi Metro - Phase 3 Challenges{{#if:Dayal|, Dayal}. Delhi Metro Rail Corporation(5 April 2018)
  148. Hawk-eyed vigil on airport metro line. The Times of India(17 August 2010). Retrieved 16 January 2018.
  149. Template:Cite magazine
  150. 150.0 150.1 Airport Express Link: Metro gives a preview. The Indian Express(6 November 2009). Retrieved 16 January 2018.
  151. Airport Metro misses CWG deadline(3 October 2010). Retrieved 9 November 2010.
  152. Cities / Delhi : Airport to be 20 minutes from Connaught Place from Wednesday. The Hindu(21 February 2011). Retrieved 24 October 2011.
  153. Delhi Airport Metro Express back on track. Livemint(22 January 2013). Retrieved 16 January 2018.
  154. Delhi Metro takes over operations of Airport Express Line. The Hindu(1 July 2013). Retrieved 5 July 2013.
  155. Airport Metro sees 30% rise in ridership after fare reduction. Business Standard(1 January 2015). Retrieved 19 January 2015.
  156. DMRC to reduce Airport line fares. The Times of India(15 September 2015). Retrieved 15 September 2015.
  157. PM Modi Inaugurates Delhi Metro Airport Express Line Extension, Takes Ride To YashoBhoomi. Zee News. Retrieved 2023-09-17.
  158. Delhi Metro Pink Line's Trilokpuri Sanjay Lake-Mayur Vihar Pocket-1 stretch inaugurated. The Hindu(6 August 2021). Retrieved 14 November 2023.
  159. New high for Metro with the track at 24m(26 September 2014). Retrieved 22 March 2018.
  160. Hauz Khas set to get deepest underground metro station. The Indian Express(2014-09-16). Retrieved 2022-04-30.
  161. First driverless metro in Delhi: All you need to know about Magenta line. India Today(28 December 2020). Retrieved 2021-09-30.
  162. Grey Line's Najafgarh- Dhansa Bus Stand Section Opens: How It Will Benefit Commuters. NDTV.com(18 September 2021). Retrieved 2021-09-19.
  163. 163.0 163.1 163.2 Network. delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 11 January 2022.
  164. Underground network in Phase 1 is 13 km. The Economic Times. Retrieved 2022-04-25.
  165. Phase 1 complete, Pragati Maidan now on Metro map. Express India(27 October 2006). Retrieved 18 April 2010.
  166. Delhi Metro confident of meeting deadline. The Hindu(17 September 2007). Retrieved 10 September 2009.
  167. Delhi's 59-km Pink Line Metro now fully operational; becomes longest operational corridor. Money Control(6 August 2021). Retrieved 11 January 2022.
  168. Grey Line's Najafgarh-Dhansa Bus Stand Corridor To Open For Services Tomorrow. NDTV(17 September 2021). Retrieved 11 January 2022.
  169. Approved Phase IV (3 Priority) Corridors. delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 11 January 2022.
  170. Completion targets of Metro Phase-4 will depend on Covid-19 scenario: DMRC. Hindustan Times(20 June 2021). Retrieved 11 January 2022.
  171. 171.0 171.1 Cite error: Invalid <ref> tag; no text was provided for refs named route map
  172. Monthly average of trains/coaches run in delhi metro - (updated as on 31.12.2021). delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 11 January 2022.
  173. 173.0 173.1 Delhi Metro's First Phase-4 Train Arrives In Mukundpur Depot For Operation. www.ndtv.com. NDTV. Retrieved 12 March 2026.
  174. Delhi Metro to come up with eight new corridors in Phase IV. India Today(24 May 2014). Retrieved 4 August 2018.
  175. New Delhi underground metro aims to transform Central Vista by 2026.
  176. बादली-सिरसपुर मेट्रो कॉरिडोर की डीपीआर तैयार, छह महीने से सरकार से मंजूरी का इंतजार. Navbharat Times. Retrieved 2024-09-08.
  177. Delhi: Air Train To Be Introduced At Indira Gandhi International Airport, Authorities To Decide Between Two Options. English Jagran(2023-09-30). Retrieved 2024-09-08.
  178. 178.0 178.1 178.2 Expected PM Narendra Modi to announce Metro's extension to other parts of Haryana, says CM Bhupinder Hooda Template:Webarchive, DNA India News, September 2015.
  179. NCR news: New Metro link from Gurugram’s Rezang La Chowk to Delhi IGI Airport, two more proposed Template:Webarchive, DNA, 24 Feb 2023.
  180. Survey complete for Gurugram-Faridabad metro link | Gurgaon News. The Times of India(10 September 2020). Retrieved 2021-09-16.
  181. Gurgaon – Faridabad Metro System: Fostering Connectivity, Economic Development and Seamless Travel Template:Webarchive, metrorailnews.in, 7/1/2024.
  182. फरीदाबाद के बाटा चौक से गुरुग्राम के लिए चलेगी इंटरसिटी एक्सप्रेस मेट्रो, हरियाणा सरकार ने बजट में की घोषणा Template:Webarchive, navbharattimes, 18 Mar 2025.
  183. Joy after long wait as Gurgaon Metro gets central green light Template:Webarchive, Times of India, 8 June 2023.
  184. Gurgaon Metro News: Haryana govt clears final DPR of Metro Rail Connection from HUDA City Centre to other parts of Gurugram | Gurgaon News. The Times of India(13 August 2020). Retrieved 2021-09-16.
  185. Hry budget focuses on AI, metro, and infra growth in Gurugram Template:Webarchive, Hindustan Times, 1 Mar 2025.
  186. 186.0 186.1 186.2 Ggm: HMRTC to hire consultant for 2 new metro corridors Template:Webarchive, Hindustan Times, 21 March 2025.
  187. TCP department realigns metro route linking Gurgaon to Manesar. The Times of India. Retrieved 4 August 2018.
  188. 5 Multimodel Hubs in Gurugram on Delhi-Alwar RRTS Template:Webarchive, India TImes, 22 Nov 2024.
  189. Haryana CM announces extension of Delhi Metro up to Jhajjar town – RailNews Media India Ltd. railnews.in. Retrieved 6 August 2018.
  190. 190.0 190.1 मेट्रो लाइन का विस्तार सोनीपत सेक्टर-7 तक होने की उम्मीद बंधी Template:Webarchive, dainiktribuneonline, 16 Apr 2025.
  191. Ghaziabad looks to extend three Metro lines, seeks DPRs. Hindustan Times(2020-01-01). Retrieved 2021-09-16.
  192. New Metro Line To Connect North-East Delhi With Trans Hindon Area In Ghaziabad Template:Webarchive, timesnownews.com, 11 Sept 2024.
  193. Greater Noida Authority approves phase 2 of Aqua Line. Moneycontrol(2018-12-04). Retrieved 2023-11-30.
  194. Driverless pod car between Jewar airport & amusement park in Film City: Plan details. The Times of India(7 September 2021). Retrieved 7 September 2021.
  195. Noida Metro: Extension Plan from Sector 142 to Botanical Garden Gains Momentum. News18(2023-12-03). Retrieved 2023-12-20.
  196. Noida Metro Submits Report For Approval Of 11.5-km Aqua Line extension. Check Areas It will Connect. TimesNow(2023-12-01). Retrieved 2023-12-20.
  197. 197.0 197.1 Metro corridor to link Capital, Jewar airport. Hindustan Times(3 September 2021). Retrieved 17 December 2023.
  198. 198.0 198.1 Greater Noida to Jewar airport in less than 25 minutes? DMRC to ready plan. The Times of India(9 April 2021). Retrieved 7 September 2021.
  199. NCRTC | Delhi – Meerut Corridor. ncrtc.in. Retrieved 11 June 2017.
  200. Delhi-Meerut rapid rail project gets green light. NDTV. Retrieved 20 February 2019.
  201. India's first rapid rail to open next week, with women driving RAPIDX. Construction World(12 October 2023). Retrieved 16 October 2023.
  202. Details - NCRTC. ncrtc.in. NCRTC. Retrieved 14 November 2023.
  203. Delhi–Meerut RRTS – Information, Route Map, Fares, Tenders & Updates. themetrorailguy.com. The Metro Rail Guy. Retrieved 16 October 2023.
  204. Template:Cite press release
  205. Delhi Metro routes now on Google Maps. The Economic Times(5 March 2010). Retrieved 11 March 2010.
  206. 206.0 206.1 Delhi Metro to reserve coach for women from October 2. The Times of India(26 September 2010). Retrieved 27 September 2010.
  207. Women get exclusive coach in Delhi Metro. Hindustan Times(2 October 2010). Retrieved 2 October 2010.
  208. Delhi Metro launches new app with additional features. livemint.com(24 July 2018). Retrieved 25 July 2018.
  209. DMRC launches smartphone app. The Hindu(23 August 2013). Retrieved 16 January 2018.
  210. CISF to take over Delhi Metro security. The Times of India(7 March 2007). Retrieved 15 April 2010.
  211. Delhi metro parking areas to be bought under CCTV cameras. Daily News and Analysis(21 March 2010). Retrieved 15 April 2010.
  212. Moscow blasts put Metro security in alert mode. The Times of India(30 March 2010). Retrieved 15 April 2010.
  213. Commuters Guide to Security on Delhi Metro. DMRC. Retrieved 27 April 2022.
  214. Mock drills at 4 Metro stations. The Times of India(26 March 2010). Retrieved 15 April 2010.
  215. Metro to raise height of walls at stations. The Times of India(9 May 2012). Retrieved 9 May 2012.
  216. 216.0 216.1 Delhi Metro fare hike chart: DMRC raises ticket prices. financialexpress.com(10 October 2017). Retrieved 25 April 2022.
  217. Delhi Metro fares revised: Here's all you need to know about the fare hike and fare slabs | India.com. www.india.com(10 May 2017). Retrieved 2022-04-25.
  218. Ticket. delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
  219. Smart Cards. DMRC. Retrieved 25 April 2022.
  220. Information on Delhi metro's tokens and smart cards. India Today(1 October 2019). Retrieved 25 April 2022.
  221. Delhi Metro free rides for women: Travelling from Delhi to NCR and vice-versa? Here's the proposed rule. The Financial Express(11 June 2019). Retrieved 25 June 2019.
  222. Delhi Metro chief says free rides for women not possible until tech updated to check misuse. ThePrint(6 November 2019). Retrieved 25 April 2022.
  223. Common Mobility Card for DTC bus, metro. ED Times(24 August 2018). Retrieved 27 April 2022.
  224. Tourist Card. delhimetrorail.com. Retrieved 25 April 2022.
  225. NCMC - Tap & Transit, Pan India with RuPay. npci.org.in. National Payments Corporation of India (NPCI)(1 September 2023). Retrieved 14 November 2023.
  226. Indigenously Developed National Common Mobility Card, QR Ticket, Account Based Ticketing To Be Made Available in the Entire Metro Network; Contract for Implementing the Same Awarded. delhimetrorail.com. DMRC(25 February 2022). Retrieved 14 November 2023.
  227. National Common Mobility Card. drishtiias.com. Drishti IAS(5 March 2019). Retrieved 14 November 2023.
  228. Delhi Metro: National Common Mobility Card facility introduced on Airport Express Line. The Financial Express(2020-12-28). Retrieved 2021-10-09.
  229. Delhi Metro network to be fully NCMC-compliant by Jun 2023: DMRC. ettravelworld.com. Retrieved 2022-03-26.
  230. You can now use RuPay debit card for traveling in Delhi metro. Business Standard(29 May 2023). Retrieved 14 November 2023.
  231. App based QR- Ticketing System. delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
  232. Delhi Metro QR ticket: How to book Delhi Metro ticket using QR code via Android mobile phone and iPhone. 91 Mobiles(9 March 2022). Retrieved 25 April 2022.
  233. Paper QR Ticket. delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
  234. Delhi Metro to introduce QR code-based ticketing system in a bid to go contactless. The Economic Times(16 February 2021). Retrieved 25 April 2022.
  235. Delhi Metro to go contactless as DMRC pushes for QR code, RuPay-based ticketing. The Hindustan Times(15 February 2021). Retrieved 25 April 2022.
  236. Noise barriers not enough, residents want speed of Metro trains to be slowed. Hindustan Times. Retrieved 14 July 2018.
  237. 237.0 237.1 Widening reach, Metro looks at ways to ease rush. The Indian Express(16 November 2009). Retrieved 15 January 2018.
  238. Crowded stations, slow trains. Hindustan Times(19 November 2009). Retrieved 21 November 2009.
  239. Feeder service or the lack of it. Hindustan Times(8 December 2009). Retrieved 8 December 2009.
  240. Parking, feeder bus woes on Metros Noida line. Retrieved 12 February 2017.
  241. Delhi Metro is second-most unaffordable in world: CSE. The Times of India. Retrieved 6 September 2018.
  242. Concerns with Delhi Metro. The Leap Blog({Template:Date).
  243. DMRC to introduce new feeder buses from Monday. PTI(4 November 2007). Retrieved 7 January 2024.
  244. Public Demands for Metro Feeder Services. delhimetrorail.com. DMRC. Retrieved 7 January 2024.
  245. Metro Feeder Buses - Routes. delhimetrorail.com. DMRC. Retrieved 7 January 2024.
  246. Search Results: Feeder Bus. delhimetrorail.com. DMRC. Retrieved 7 January 2024.
  247. Last Mile Connectivity. delhimetrorail.com. DMRC. Retrieved 17 July 2020.
  248. Delhi Metro Annual Report 2022-23(11 March 2024). Retrieved 11 March 2024.
  249. PM calls for a complete lockdown of the entire nation for 21 days. Press Information Bureau(24 March 2020). Retrieved 11 January 2022.
  250. Delhi Metro resumes full services from today. 5 facts you should know. mint(12 September 2020). Retrieved 16 September 2022.
  251. Economic Survey of Delhi 2021–22. Retrieved 30 April 2022.
  252. Delhi Metro recorded its highest-ever daily ridership on November 18(19 November 2024). Retrieved 19 November 2024.
  253. Delhi Metro logs 2 billion passenger trips for 2023 — highest ever. Hindustan Times(2024-01-18). Retrieved 2024-05-29.
  254. PERFORMANCE OF INDIAN METRO SYSTEMS: LESSONS FOR UPCOMING URBAN RAIL PROJECTS. cms.uitp.org. Retrieved 13 February 2025.
  255. Annual Report 2006–07. Delhi Metro Rail Corporation. Retrieved 18 May 2022.
  256. Annual Report 2007–08. Delhi Metro Rail Corporation. Retrieved 18 May 2022.
  257. Annual Report 2008–09. Delhi Metro Rail Corporation. Retrieved 18 May 2022.
  258. Annual Report 2009–10. Delhi Metro Rail Corporation. Retrieved 18 May 2022.
  259. Annual Report 2010–11. Delhi Metro Rail Corporation. Retrieved 18 May 2022.
  260. Annual Report 2011–12. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
  261. Annual Report 2012-13. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
  262. Annual Report 2013–14. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
  263. 263.0 263.1 Annual Report 2014–15. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
  264. 264.0 264.1 Annual Report 2015-16. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
  265. Delhi Metro Rail finances in the red, Singh, Sudheer Pal. Business Standard(31 May 2016). Retrieved 22 January 2018.
  266. Annual Accounts And Directors Report 2016–17. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
  267. Annual Accounts And Directors Report 2017–18. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
  268. Annual Report 2018-19. Delhi Metro Rail Corporation. Retrieved 26 April 2022.
  269. Annual Report 2019-20. Delhi Metro Rail Corporation. Retrieved 26 April 2022.
  270. Annual Report 2020-21. Delhi Metro Rail Corporation. Retrieved 26 April 2022.
  271. Annual Report 2021-22. Retrieved 14 February 2023.
  272. Annual Report 2022-23. Retrieved 3 January 2024.
  273. Annual Report 2023-24.
  274. Annual Report 2024-25.
  275. Delhi: Station naming rights pushing up metro income | Delhi News. The Times of India(April 2019). Retrieved 2022-02-15.
  276. 43 and counting… station branding is doing wonders for Delhi Metro revenue. The Indian Express(2018-05-03). Retrieved 2022-02-15.
  277. IIT Delhi: How a premier IIT fought and won a brand war at Delhi's metro station. The Economic Times. Retrieved 2022-02-15.
  278. Grey Line puts villages of Najafgarh on Delhi Metro map. Hindustan Times(3 June 2019). Retrieved 24 January 2026.
  279. Electronic City station may become a depot by next March. Times of India(3 November 2021). Retrieved 24 January 2026.
  280. Himcon Begins Delhi Metro Mukundpur Depot's Expansion Work. themetrorailguy.com. The Metro Rail Guy(24 April 2022). Retrieved 15 December 2023.
  281. Delhi Metro to expand capacity at Mukundpur depot to cater requirements of phase 4 corridors. Livemint(17 April 2022). Retrieved 15 December 2023.
  282. Delhi Metro to augment capacity of Mukundpur depot: DMRC. ThePrint(2022-04-17). Retrieved 2024-09-08.
  283. Reuters – Hyundai Rotem gets m order to supply trains. In.reuters.com. Retrieved 24 October 2011.
  284. Delhi Metro gets standard gauge train. Business Line(18 March 2009). Retrieved 22 January 2018.
  285. Delhi Metro begins shift to standard gauge rails. Times of India(23 March 2009). Retrieved 26 January 2026.
  286. Metro gets first standard gauge depot. The Hindu(23 February 2010). Retrieved 22 January 2018.
  287. 287.0 287.1 Delhi Metro, India. Railway-Technology.com. Retrieved 12 May 2014.
  288. Delhi Metro says no to Maglev technology. The Indian Express(8 August 2012). Retrieved 22 January 2018.
  289. BEML to rake in big money from proposed metro projects. The Hindu(25 August 2005). Retrieved 26 September 2009.
  290. 290.0 290.1 Second Metro rail arrives in Delhi. The Times of India(15 October 2002). Retrieved 26 September 2009.
  291. 291.0 291.1 291.2 291.3 Rolling Stock: Ensuring Passenger Comfort, Safety and Reliability. DMRC. Retrieved 27 September 2010.
  292. Metro Rail gets first train. The Hindu(27 July 2002). Retrieved 26 September 2009.
  293. Bombardier to Deliver Further 76 MOVIA Metro Cars to Delhi Metro from Savli India Site. Bombardier(5 September 2011). Retrieved 3 November 2011.
  294. Bombardier to supply coaches to Delhi Metro. projectsmonitor.com.
  295. Metro to get swankier, bigger coaches. The Times of India(17 September 2009). Retrieved 26 September 2009.
  296. BEML delivers India's 1st standard gauge metro car. The Economic Times(11 September 2009). Retrieved 15 January 2018.
  297. Trial run begins on first standard gauge Metro line. The Hindu(30 July 2009). Retrieved 15 January 2018.
  298. Airport line handed over to Reliance Infra. The Indian Express(20 May 2010). Retrieved 5 June 2010.
  299. Delhi Airport line contracts finalised. Construcciones y Auxiliar de Ferrocarriles.
  300. Technical Notes: Signalling. DMRC. Retrieved 23 November 2009.
  301. Delhi Metro Railway Corporation, India. Motorola Electronics. Retrieved 3 January 2010.
  302. Metro Line 3, New Delhi, India. Siemens. Retrieved 6 July 2008.
  303. Technical Notes: Telecommunication. DMRC. Retrieved 23 November 2009.
  304. Delhi Airport Metro Express. Delhi metro times. Retrieved 4 August 2012.
  305. Reliance Metro Airport Express, WiFi-enabled, EVS Chakravarthy, CEO YOU Broadband. Business Wire India. Retrieved 22 August 2018.
  306. Delhi Metro launches WiFi on Blue Line stations. The Economic Times(25 August 2017). Retrieved 22 August 2018.
  307. Delhi Metro offered Template:Sicautomated, driverless train system. Retrieved 25 May 2012.
  308. Delhi Metro gets UN certificate for preventing carbon emission. The Times of India(22 February 2009). Retrieved 15 January 2018.
  309. 309.0 309.1 Delhi Metro gets OHSAS 18001. DMRC. Retrieved 10 September 2009.
  310. Press Release: Delhi Metro Receives ISO 14001 For Eco-friendly Systems. USAID(24 December 2002). Retrieved 27 September 2010.
  311. Details of Rain Water Harvesting in Various Metro Lines / Stations. backend.delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 21 December 2023.
  312. Delhi Metro shows the way with water harvesting units. The Times of India(26 September 2005). Retrieved 27 September 2010.
  313. Metro Phase-IV elevated stations in Delhi to go for rainwater harvesting. Times of India(13 March 2023). Retrieved 21 December 2023.
  314. Delhi Metro is first rail project to earn carbon credits. The Economic Times(5 January 2008). Retrieved 22 January 2018.
  315. Delhi Metro on track to earn carbon credits. The Indian Express(20 December 2009). Retrieved 22 January 2018.
  316. 60% of Delhi Metro now powered by solar energy from Madhya Pradesh. World Bank. Retrieved 2023-02-05.
  317. 317.0 317.1 Elevated plans: Delhi Metro eyes solar share of 50% in 8 years. Times of India(4 April 2023). Retrieved 22 December 2023.
  318. Metro mulls solar panels at stations to go green. The Times of India(5 June 2012). Retrieved 22 January 2018.
  319. Vertical solar panels to help bridge power gap for metro. Times of India(24 May 2022). Retrieved 22 December 2023.
  320. Vibrant murals bring cheer. The Times of India(13 December 2002). Retrieved 22 January 2018.
  321. Murals by Salwan Public School students decorate Metro pillars on Pusa Road. The Indian Express(10 October 2007). Retrieved 2 February 2010.
  322. At INA Metro station, a gallery for traditional art, crafts. The Indian Express(2 September 2010). Retrieved 22 January 2018.
  323. Delhi metro gets a handicrafts gallery. The Hindu(2 September 2010). Retrieved 21 September 2010.
  324. Delhi Metro in Bollywood films. The Times of India. Retrieved 2023-04-07.
  325. From 5-6 per year, films shot in Metro down to 1. The Times of India. Retrieved 2023-04-07.
  326. Delhi Metro's fleeting 15 minutes of fame. The Hindu(2016-03-26). Retrieved 2023-04-07.
  327. Delhi Metro finds many takers in film world. Hindustan Times(2014-07-21). Retrieved 2023-04-07.
  328. Amitabh, Abhishek shoot for Paa in Delhi Metro. India Today(31 May 2009). Retrieved 2023-04-07.
  329. Hrithik-Katrina film shoot creates traffic mess. The Times of India(2014-03-03). Retrieved 2023-04-07.
  330. Hrithik Roshan, Katrina Kaif's Bang Bang shoot halts Delhi traffic. Hindustan Times(2014-03-02). Retrieved 2023-04-07.
  331. War is entertaining and worth every penny. The Sunday Guardian Live(2019-10-05). Retrieved 2023-04-07.

Further reading

Template:Commons Template:Wikivoyage Template:Rapid transit OSM map

Template:Delhi Template:Delhi Metro Template:Delhi & NCR Metro stations Template:Rapid transit in India Template:Rapid transit in Asia Template:Greater Delhi transit Template:Automated trains and fixed-guideway transit Template:Internationally Metro Organizations