Delhi Panipat Regional Rapid Transit System

Created by Theodore2940
Last edited May 2, 2026


Template:Infobox public transit The Delhi–Karnal Regional Rapid Transit System (Delhi–Karnal Namo Bharat) is an approved, Template:Convert long, semi-high speed rail corridor connecting Delhi, Sonipat, Panipat and Karnal in the National Capital Region.[1][2] It is one of the three RapidX corridors planned under Phase-1 of the Rapid Rail Transport System of the National Capital Region Transport Corporation (NCRTC). The project is expected to cost Template:INRConvert.[3]

Route and stations

The line will start from Sarai Kale Khan station, which will allow interchange with Delhi-Alwar RapidX and Delhi-Meerut RapidX lines, as well as connectivity to the Nizamuddin railway station, Sarai Kale Khan ISBT and Sarai Kale Khan - Nizamuddin metro station. There will be total 22 stations on the corridor out of which two will be underground and the rest will be elevated.[4]

No. Station name Connections Layout Status
1 Sarai Kale Khan Template:Ric Template:Rcb
Template:Ric Hazrat Nizamuddin
Template:Rint Sarai Kale Khan ISBT
Elevated Template:Partial
2 Indraprastha Template:Ric Template:Rcb Elevated rowspan="22" Template:Planned
3 Kashmere Gate Template:Ric Template:Rcb
Template:Ric Template:Rcb
Template:Ric Template:Rcb
Template:Rint Kashmere Gate ISBT
Underground
4 Jharoda Majra Template:Ric Template:Rcb Elevated
5 Bhalaswa Template:Ric Template:Rcb Elevated
6 Alipur None Elevated
7 Narela Template:Ric Template:Rcb Elevated
8 Kundli Template:Ric Template:Rcb Elevated
9 KMP None Elevated
10 Bahalgarh Chowk None Elevated
11 Murthal None Elevated
12 Bahri None Elevated
13 Gannaur None Elevated
14 Samalkha None Elevated
15 Panipat ISBT None Elevated
16 Panipat City None Underground
17 Panipat Sector 18 None Elevated
18 Ganjbar-Badauli-Kohand None Elevated
19 Gharunda None Elevated
20 Karnal Bypass None Elevated
21 Karnal Sector 7 None Elevated
22 Karnal ISBT None Elevated

Inter-connectivity

It will connect with the following multi-model transports:

Status

  • 19 July 2017 - NHAI granted in-principle approval.[3]
  • 13 March 2020 - DPR approved by NCRTC Board.
  • 18 January 2021 - Delhi Panipat RRTS corridor approved by Government of Haryana.[5]
  • 12 March 2021 - Process to identify Station land for extension to Karnal begins (3 more stations).[6]
  • 18 August 2021 - DPR pending with Central Government since Dec 2020.[7]
  • 14 Dec 2021 - Centre has not received the Delhi government's approval for its financial commitment with regard to DPR of the Delhi-Panipat RRTS.[8]
  • 8 Feb 2023 - Delhi Government not agreed to provide financial support for Delhi-Panipat RRTS and Delhi-SNB RRTS, and also hasn't made full payment for Delhi-Meerut RRTS.[9]
  • 17 Dec 2023 - Delhi government expressed its willingness to grant an in-principle/administrative approval for Delhi-Panipat RRTS project, provided its share of contribution was met by the Centre.[10]
  • 31 Dec 2023 - Delhi government releases 50 crores as initial fund for Delhi-Panipat RRTS.[11]
  • 3 October 2025 – NCRTC begins pre-construction preparatory work, including utility diversion (power lines, cables, transformers) across ~22 km between Narela and Murthal (Sonipat). [12]
  • 12 November 2025 - PIB Approves Delhi-Panipat RRTS Corridor, enabling the project to proceed to the Union Cabinet for final sanction. [13]

See also

References

  1. NHAI approves Delhi RRTS projects worth Rs53,500 crore. Mint(2017-07-19). Retrieved 2017-10-06.
  2. NHAI to construct 2 rapid transit corridors from Delhi to decongest traffic. India Today(2017-07-20). Retrieved 2017-10-09.
  3. 3.0 3.1 Rapid rail projects connecting Delhi to Alwar and Panipat get approval. Hindustan Times(2017-07-19). Retrieved 2017-10-05.
  4. NCRTC|Delhi-Panipat corridor. nrctc.in. Retrieved 15 July 2018.
  5. Haryana state approves Delhi - Panipat RRTS. International Railway Journal(2021-01-19). Retrieved 2021-07-13.
  6. Process to identify land for rapid transit system begins. Tribuneindia News Service. Retrieved 2021-07-13.
  7. Delhi-Panipat corridor: Rapid transit system awaits final nod. Tribuneindia News Service. Retrieved 2022-01-18.
  8. 2 RRTS corridors stuck with Delhi, says Centre. The Times of India(December 14, 2021). Retrieved 2022-01-09.
  9. Delhi hasn't made full payment for RRTS corridor: Centre. The Times of India(2023-02-08). Retrieved 2023-02-13.
  10. For Delhi-Alwar & Delhi-Panipat RRTS Corridors, Govt Working on Cabinet Note For MoU With NCRTC. TimesNow(2023-12-17). Retrieved 2024-03-02.
  11. Delhi govt releases Rs 150 crore for construction of two RRTS corridors. The Times of India(2023-12-31). Retrieved 2024-04-08.
  12. NCRTC begins utility shifting for Delhi–Panipat RRTS, pre-construction on. Hindustan Times(2025-10-03). Retrieved 2025-12-12.
  13. After Delhi-Meerut, two new rapid rail routes get approval: Check proposed routes, cost and other details. The Economic Times(2025-11-12). Retrieved 2025-12-12.

Template:RapidX Template:Rapid transit in India