Created by Ajendra69
Last edited December 25, 2022


Template:Infobox rail line The Jabalpur–Bhusaval section is a railway line connecting Jabalpur, Madhya Pradesh and Template:Stnlnk, Maharashtra. This Template:Convert track is part of the Howrah–Allahabad–Mumbai line, one of the busiest railways in India. The line is under the jurisdiction of West Central Railway and Central Railway.

History

The Great Indian Peninsula Railway's pioneering Bombay–Thane line was extended to Template:Stnlnk in May 1854. Template:Stnlnk station was set up in 1860. In 1866 Bhusaval-Khandwa section was opened. The GIPR connection reached Jabalpur from Itarsi on 7 March 1870, linking up with the East Indian Railway Company track there from Allahabad, and establishing connectivity between Mumbai and Kolkata.[1][2] Before construction of Indira Sagar Dam in 2004 on Narmada Valley, the route was Template:Convert long. The old alignment got submerged in 2004 due to Indira Sagar Dam & a new alignment was made which increased the route distance by Template:Convert.

Electrification

While the Itarsi–Harda sector was electrified in 1990–91, the Harda–Khandwa–Bhusaval sector was electrified the next year.[3] The Template:Convert long Naini Junction–Manikpur Junction–Stana Junction-Katni Junction-JabalpurItarsi route has been completely electrified under Vision 2020 – A Blue print for Railway Electrification Programme.[4]

Speed limits

The Howrah–Allahabad–Mumbai line is classified as 'B' class where trains can run up to Template:Convert.[5]

Passenger movement

Jabalpur (Station Code JBP) and Bhusaval (Station Code BSL)are amongst the top hundred booking stations of Indian Railway.[6]

Loco sheds

Itarsi diesel shed holds 145+ locos. It has WDM-2, WDM-3A, WDM-3D, WDS-6 and WDP-4 diesel locos. This shed serves routes all across central India. Itarsi electric loco shed came up in the 1980s. It holds WAM-4, WAP-4 and WAG-5 electric locos. Its WAG-5 locos perform banking duties on the Budni–Barkhera ghat section. Bhusaval electric loco shed has WAM-4, WAP-4, WAG-5, WAG-7 and WCM-6 locomotives.[7]

References

  1. IR History: Early Days – I. Retrieved 17 November 2013.
  2. IR History: Early Days – II. Retrieved 17 November 2013.
  3. History of Electrification. IRFCA. Retrieved 17 November 2013.
  4. Vision 2020 – A Blueprint for Railway Electrification. Ministry of Railways. Retrieved 17 November 2013.
  5. Permanent Way. Track Classifications. Retrieved 17 November 2013.
  6. Indian Railways Passenger Reservation Enquiry. IRFCA. Retrieved 17 November 2013.
  7. Sheds and Workshops. IRFCA. Retrieved 17 November 2013.

Template:Railways in Central India Template:Narmada basin