Template:Infobox canal
Mamannar Kalingarayan Canal is a Template:Convert long irrigation canal in the Erode district, Tamil Nadu, India. It was constructed by Kongu Nadu Chieftain Mamannar Kalingarayan Gounder and completed in 1283. The canal's source is the Kalingarayan Anicut dam near Bhavani, Erode. The canal irrigates approximately Template:Convert of agricultural land.[1]
Project, including the canal and the Kalingarayan Anicut dam started in 1271 and was completed in 1283, taking over 12 years.[2] The dam was constructed by Kalingarayan king.
Course and architecture
The canal connects Bhavani and Noyyal rivers, two major tributaries of the Kaveri. It is one of the oldest river linking projects in India.[3][4] The Canal starts at Kalingarayan Anicut on Bhavani river and joins Noyyal river near Kodumudi. The canal is Template:Convert long and was designed to reduce the water current, to avoid damage to the canal banks and to increase the ground water table.[5] The canal crosses three other canals via aqueducts.[6]
- Sunnambu Canal near Suriyampalayam
- Pichaikaranpallam Canal near BP Agraharam
- Perumpallam Canal near Karaivaikkal[7][8]
Environmental Threats
As the initial portion of the canal runs through the highly industrialized and urbanized areas of Erode Municipal Corporation, the discharge of untreated effluents from the textile dyeing units and leather tanneries introduce major pollutants.[9] To prevent mixing of sewage into the canal, the Government of Tamil Nadu have built concrete walls on the sides and a baby canal of Template:Convert has been constructed alongside the main canal to carry the sewage. The entire stretch of first Template:Cvt of the canal running through Erode Municipal Corporation is proposed to be provided with concrete lining and baby canal in phased manner.[10][11] Also, navigable roads were developed along the banks throughout this stretch.[12][13]
See also
References
- ↑ Kalingarayan sluices opened, Erode all set for farming. Retrieved 23 December 2016.
- ↑ Kalingarayan Canal is 725 years old. Retrieved 23 December 2016.
- ↑ Kalingarayan Canal Water Quality Study{{#if:|, {{{last}}}}. Central Pollution Control Board
- ↑ Memorial in Honour of Kalingarayan-CM. Retrieved 23 December 2016.
- ↑ காலிங்கராயன் கால்வாய் வளைந்து செல்வது ஏன்?. Dinakaran. Retrieved 23 December 2016.
- ↑ Kalingarayan Canal turns 727. Retrieved 23 December 2016.
- ↑ Sewage, a threat to Kalingarayan Bridge. Retrieved 23 December 2016.
- ↑ Kalingarayan the Great and the Kalingarayan Canal, page-43{{#if:|, {{{last}}}}. N.Pushparaj-Pavendhan Memorial Trust
- ↑ Pollution of Kalingarayan Canal continues unabated. Retrieved 23 December 2016.
- ↑ Erode Kalingarayan Canal to get a facelift soon. Retrieved 23 December 2016.
- ↑ More water flow into Kalingarayan Canal brings relief for tail-end farmers. Retrieved 23 December 2016.
- ↑ Expedite third phase of Concrete lining of Kalingarayan Canal. Retrieved 23 December 2016.
- ↑ Minister inspects Kalingarayan Canal works. Retrieved 23 December 2016.