| Kolkata Leather Complex | |
|---|---|
|
[[File:|250x250px|frameless|center]] | |
| Settlement type | Planned Industrial Complex |
| Country | India |
| State | |
| District | |
| Subdivision | |
The Kolkata Leather Complex is an industrial complex at Karaidanga, Bantala near East Kolkata, India.[1] It is located 20 km from the central business district of Kolkata and has an area of about 4.5 square kilometres. It was conceived following a Supreme Court directive to relocate polluting tanneries and now encompasses approximately 500 individual units, handling 22 to 25 percent of India’s tanning output. The complex features dedicated infrastructure including a Common Effluent Treatment Plant, pumping stations, and utilities for consolidated waste management and environmental compliance.
The complex
The complex is intended to serve as a central leather-tanning business for Kolkata.[2] Bantala has approximately 500 tanneries[3] and the Kolkata one performs 22-25% of all the tanning in India.[4] The state of West Bengal is responsible for about 55% of India's leather exports. As of 2009, about 200 tanneries were relocated to the Kolkata Leather Complex.[5] The project includes a police station and a fire station; in 2017 the police station was brought under the jurisdiction of the Kolkata police.[6] The facility also houses the Government College of Engineering and Leather Technology, which is affiliated with Maulana Abul Kalam Azad University of Technology, Kolkata.[7] A Template:Convert portion was designated as an IT park.[8]
The complex was conceived in the early 1990s as "an integrated complex housing all activities relating to the leather industry in a modern and environment-friendly manner". The need for the project became evident when the Supreme Court of India ordered that all tanning activities in Kolkata be moved outside the city limits.[8] As of 2013, the complex was still not fully operational, and many illegal tanneries continued to operate outside the complex.[9]
Effluent Treatment Plant
Pumping stations carry the effluent from the tanneries to a Common Effluent Treatment Plant (CETP). Problems in completing the common effluent treatment plant have caused serious difficulties, with toxic waste polluting the construction activities of some companies.[10] It was mandated by the Supreme Court in 1995 to treat 30 million litres per day of tannery waste relocated from Kolkata. Although the project was to be completed by November 1997. It was later expanded with seven additional components, by February 2010 key systems, such as the Common Chrome Recovery System, solid‑waste disposal unit, and treated‑effluent sump and pumping station, still remained unfinished. Central Pollution Control Board tests found chromium levels in the plant's sludge at around 25 mg/kg, far exceeding safe limits, and noted poor overall CETP performance. Inspections revealed that chrome‑laden cutting scraps and solid wastes were being dumped roadside rather than processed, posing serious surface and groundwater contamination risks. The National River Conservation Directorate further criticized both tanneries and the state government for inadequate equipment maintenance, lack of qualified staff, and failure to follow up on recommended environmental safeguards.[11]
References
- ↑ About – Calcutta Leather Complex Tanners Association. Retrieved 2020-09-10.
- ↑ CSIR-Central Leather Research Institute. www.clri.org. Retrieved 2020-09-10.
- ↑ Bengal allots 70 acres to 187 new tanneries in Calcutta Leather Complex. Business Standard India(2019-07-18). Retrieved 2020-09-10.
- ↑ Our Lust for Leather Comes at a High Price in the Developing World. Undark Magazine(2017-02-21). Retrieved 2020-09-10.
- ↑ Industry Specific Review: Leather Industry(2009–2010). Retrieved 20 January 2015.
- ↑ Leather complex to come under Kolkata police. The Indian Express(5 March 2017). Retrieved 26 September 2017.
- ↑ Government College of Engineering and Leather Technology, Kolkata. Retrieved 26 September 2017.
- ↑ 8.0 8.1 Status Report on Calcutta Leather Complex for incorporation in the portal 'Banglar Mukh'. Retrieved 20 January 2015.
- ↑ Changes in physicochemical characteristics of wastewater carrying canals after relocation of Calcutta tannery agglomerates within the East Calcutta Wetland ecosystem (a Ramsar site). International Journal of Environmental Studies({Template:Date).
- ↑ Leather complex turns threat to environment. The Indian Express(3 Oct 2008). Retrieved 6 October 2014.
- ↑ CAG slams govt for failure to complete Bantala plant, Shiv Sahay, Singh. The Indian Express(2011-01-04). Retrieved 2025-07-11.