Template:More citations needed Template:Infobox rail line
Kolkata Metro Line 3 is a line of the Kolkata Metro. As of 2020, the line is still under construction.[1] The route spans Template:Convert from Joka in the south, to Esplanade in the north with an extension of 2 km to Diamond Park from Joka.[2] It will connect Kolkata Metro Line 1 at Park Street in central Kolkata and run in parallel up to Esplanade in central Kolkata where it will connect Kolkata Metro Line 2 also. Line 3 is being built by Rail Vikas Nigam Limited.
Development
It is partially elevated and partially underground: around Template:Convert of the project will be elevated and the rest Template:Convert of the metro line will be underground.[1] The project is getting delayed due to non availability of land for the construction of train depot at Joka. In 2019, RVNL was given the land required for building the depot and the construction for its boundary wall and land development started in February 2019.[3] Tenders for its construction and plant & machinery (M&P) were invited in April 2020.[4]
Construction was further delayed in September 2018 due to the Majerhat Bridge collapse, the metro was being built right next to the bridge.
Tender for Majherhat to Esplanade underground section has been floated in 1st week of December 2019.
List of stations
The work has been sanctioned in 2010-11 for the new Metro line from Joka to B.B.D. Bagh for a length of 16.72 km at an anticipated cost of Rs. 2619.02 Crores. But, later the route was shortened and planned to terminate at Esplanade. A separate Depot is under construction in Joka. It is being built by RVNL and the tender has gone to Simplex Infrastructures. The extension of this line to IIM and Diamond Park for 2 km has been sanctioned in the Budget of 2012-13 at a cost of Rs. 294.49 Cr. The execution of this work has been entrusted to RVNL.
There are 3 phases in this line-
- Joka to Majerhat (Under construction)
- Majerhat to Esplanade (After completion of phase 1)
- Joka to Diamond park (After completion of phase 2)
| Line 3 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| No. | Station Name | Location | Phase | Opening | Connections | Layout | Coordinates | Notes | ||||||
| English | Bengali | |||||||||||||
| 1 | Template:Metro | ডায়মন্ড পার্ক | Joka | 3 | Planned | Template:Rint Vivekananda Mission School Bus Stop | Elevated | |||||||
| 2 | Template:Metro | আইআইএম | ||||||||||||
| 3 | Joka | জোকা | 1 | Under construction | Template:Rint Joka bus Depot
Template:Rint Diamond Park Bus Stop |
Also known as Diamond Park | ||||||||
| 4 | Thakurpukur | ঠাকুরপুকুর | Thakurpukur |
Template:Rint Thakurpukur Police Station Bus Stop Template:Rint Thakurpukur Bazar Bus Stand |
||||||||||
| 5 | Sakherbazar | সখেরবাজার | Behala |
Template:Rint Thakurpukur Bus Depot Template:Rint Silpara Bus Stop Template:Rint Behala Sakherbazar Minibus Stand Template:Rint Kadamtala Bus Stand |
Also known as Silpara | |||||||||
| 6 | Behala Chowrasta | বেহালা চৌরাস্তা |
Template:Rint Behala Chowrasta Bus Stand |
|||||||||||
| 7 | Behala Bazar | বেহালা বাজার |
Template:Rint Behala Bazar Bus Stop |
|||||||||||
| 8 | Taratala | তারাতলা | Taratala |
Template:Rint Ajanta Cinema Bus Stop Template:Rint Taratala Bus Stand |
Also known as Pathakpara | |||||||||
| 9 | Majerhat | মাঝেরহাট | Majerhat | Template:Rint Majerhat Station
Template:Rint DH Road Mint Bus Stop Template:Rint Majherhat Gurudwara Bus Stop |
||||||||||
| 10 | Mominpur | মোমিনপুর | Mominpur | 2 | Planned(Tender Floats) | Template:Rint Mominpore Bus Stop | Underground | |||||||
| 11 | Kidderpore | খিদিরপুর | Kidderpore | Template:Rint Khidirpur Station
Template:Rint Khidderpore Crossing Tram StopTemplate:Rint Khidderpore Bus Stop |
||||||||||
| 12 | Victoria | ভিক্টোরিয়া | Maidan | Template:Rint Hastings Tram Stop
Template:Rint Victoria Memorial Bus Stop Template:Rint PG Hospital Bus Stop Template:Rint Birla Planetarium Bus Stop |
Also known as Hastings | |||||||||
| 13 | Park Street | পার্ক স্ট্রিট | Park Street | Template:Rint Park Street Bus Stop | ||||||||||
| 14 | Esplanade | এসপ্ল্যানেড | Esplanade | Under Construction | Template:Rail-interchange
Template:Rail-interchange (Under Construction) Template:Rint Esplanade Bus Station(WBTC,SBSTC,NBSTC) Template:Rint Esplanade Tram Depot |
International Bus Terminus. Also known as Dharmatala / Chowringhee | ||||||||
See also
- List of Kolkata metro stations
- Kolkata Metro Rolling Stock
- 2018 Kolkata bridge collapse
- Kolkata Suburban Railway
References
- ↑ 1.0 1.1 Kolkata: Work on fast track as East-West Metro eyes new links in next two years | Kolkata News - Times of India, B, Krishnendu. The Times of India. Retrieved 2019-06-28.
- ↑ Kolkata Metro Line 3.
- ↑ Work begins at Joka Metro depot, wall built | Kolkata News - Times of India, B, Krishnendu. The Times of India. Retrieved 2019-06-28.
- ↑ RVNL Invites Bids for Kolkata Metro Line-3's Joka Depot. The Metro Rail Guy(2020-04-28). Retrieved 2020-04-29.
Template:Kolkata Metro Template:Kolkata topics Template:Rapid transit in India