Created by CleanupBot II
Last edited August 14, 2023


Template:Infobox dam The Koteshwar Dam is a gravity dam on the Bhagirathi River, located Template:Convert downstream of the Tehri Dam in Tehri District, Uttarakhand, India. The dam is part of the Tehri Hydropower Complex and serves to regulate the Tehri Dam's tailrace for irrigation and create the lower reservoir of the Tehri Pumped Storage Power Station. In addition, the dam has a 400 MW (4x100 MW) run-of-the-river power station.[1] The project was approved in 2000 and its first generator was commissioned on 27 March 2011, the second on 30 March 2011. The construction site had been inundated in September 2010 by floods. The diversion tunnel was later blocked heaving/collapse of the hill in December 2010. The spillway was commissioned in Jan, 2011.[2] The last two generators were made operational in March 2012.[3]

Design

The dam is Template:Convert tall and Template:Convert long. It has a structural volume of Template:Convert and its crest lies at an elevation of Template:Convert above sea level. The dam's spillway consists of four Template:Convert wide and Template:Convert tall radial gates. When the reservoir is at flood level, the spillway has a discharge capacity of Template:Convert. Receiving water from Tehri Dam and collecting it from an overall Template:Convert catchment area, the dam creates a reservoir with a Template:Convert capacity, of which Template:Convert is active (or "useful"). The reservoir's surface area is Template:Convert and at full pool, it lies at an elevation of Template:Convert. The dam's power station is a run-of-the-river type and uses the active storage in the reservoir which can draw the lake down Template:Convert from full pool. The power house is located on the right bank of the river below the dam and contains 4 x 100 MW Francis turbine-generators. The height of the dam allows for a maximum Template:Convert of hydraulic head.[4][5]

See also

Template:Stack

References

  1. Koteshwar Hydro Power Project. Tehri Hydro Development Corporation. Retrieved 14 August 2011.
  2. Koteshwar project was commissioned within six months of the crisis.. Projects Info(18 April 2011). Retrieved 14 August 2011.
  3. Projects:Current Status. Tehri Hydro Development Corporation. Retrieved 14 August 2011.
  4. Cite error: Invalid <ref> tag; no text was provided for refs named COLD
  5. Cite error: Invalid <ref> tag; no text was provided for refs named THDC

Template:Hydrography of Uttarakhand