Template:GeoGroup Template:Update This is a list of all stations of the Ahmedabad Metro, a rapid transit system serving Ahmedabad, India.

Ahmedabad Metro is the 12th metro system in India.

It was built and is operated by the Gujarat Metro Rail Corporation Limited. Its first section was inaugurated on 4 March 2019[1] and opened to the public on 6 March 2019, with the East-West Corridor.[2][3] The 1.4 km-long Thaltej-Thaltej Gam section and three metro stations (Kankaria East, Thaltej Gam and Sabarmati) were expected to be completed by December 2023.[4][5][6][7] The rest of Phase-1 was inaugurated on 30 September 2022.[8] The East-West corridor and the North-South corridor were opened to the public on 2 October 2022 and 6 October 2022 respectively.[9]

The trial run of Phase-2 started in February 2024 between GNLU and Dholakuva Circle stations.[10][11] The Yellow Line connecting Sector 1 station of Gandhinagar with the Red Line's Motera Stadium along with six new stations on Yellow Line were inaugurated on 16 September 2024 by Prime Minister Narendra Modi and was open to the public on 17 September 2024.[12][13][14][15] Seven new stations on Yellow Line were opened to public on 27 April 2025.[16] Juna Koba and Koba Gaam stations were opened on 28 September 2025.[17] The final 5.36-kilometre corridor of the Yellow Line, from Sachivalaya (Secretariat) to Mahatma Mandir, was inaugurated on 11 January 2026 by Prime Minister Modi.[18]

Metro stations

Terminal station
* Transfer station
†† Transfer station to Indian Railways / ISBT

The list gives only operational stations, alphabetically-

Sr no. Station name Line Opened Layout Platform layout Notes Refs
English Gujarati
1 Template:Stl એ ઇ સી Template:Rcb September 30, 2022 Elevated Side
2 Template:Stl અમરાઈવાડી Template:Rcb March 4, 2019 Elevated Side [19]
3 Template:Stl એ પી એમ સી Template:Rcb September 30, 2022 Elevated Side
4 Template:Stl એપેરલ પાર્ક Template:Rcb March 4, 2019 Elevated Side [20]
5 Template:Stl કોમર્સ છ રસ્તા Template:Rcb September 30, 2022 Elevated Side
6 Template:Stl દૂરદર્શન કેન્દ્ર Template:Rcb September 30, 2022 Elevated Side
7 Template:Stl ગાંધીગ્રામ Template:Rcb September 30, 2022 Elevated Side
8 Template:Stl ઘીકાંટા Template:Rcb September 30, 2022 Underground Island
9 Template:Stl ગુજરાત યુનિવર્સિટી Template:Rcb September 30, 2022 Elevated Side
10 Template:Stl ગુરુકુળ રોડ Template:Rcb September 30, 2022 Elevated Side
11 Template:Stl જીવરાજ પાર્ક Template:Rcb September 30, 2022 Elevated Side
12 Template:Stl કાલુપુર રેલ્વે સ્ટેશન Template:Rcb September 30, 2022 Underground Island
13 Template:Stl કાંકરિયા પૂર્વ Template:Rcb September 30, 2022 Underground Island
14 Template:Stl મોટેરા સ્ટેડિયમ Template:Rcb
Template:Rcb
September 30, 2022 Elevated Side
15 Template:Stl નિરાંત ક્રોસ રોડ Template:Rcb March 4, 2019 Elevated Side [21]
16 Template:Stl જૂની હાઇ કોર્ટ Template:Rcb
Template:Rcb
September 30, 2022 Elevated Side & island
17 Template:Stl પાલડી Template:Color box September 30, 2022 Elevated
18 Template:Stl રબારી કોલોની Template:Color box March 4, 2019 Elevated Side [22]
19 Template:Stl રાજીવ નગર Template:Color box September 30, 2022 Elevated
20 Template:Stl રાણીપ Template:Color box September 30, 2022 Elevated
21 Template:Stl સાબરમતી Template:Color box September 30, 2022 Elevated
22 Template:Stl સાબરમતી રેલવે સ્ટેશન Template:Color box Under construction Elevated
23 Template:Stl શાહપુર Template:Color box September 30, 2022 Underground
24 Template:Stl શ્રેયસ Template:Color box September 30, 2022 Elevated
25 Template:Stl એસ પી સ્ટેડિયમ Template:Color box September 30, 2022 Elevated
26 Template:Stl થલતેજ Template:Color box September 30, 2022 Elevated
27 Template:Stl ઉસ્માનપુરા Template:Color box September 30, 2022 Elevated
28 Template:Stl વાડજ Template:Color box September 30, 2022 Elevated
29 Template:Stl વસ્ત્રાલ Template:Color box March 4, 2019 Elevated Side [23]
30 Template:Stl વસ્ત્રાલ ગામ Template:Color box March 4, 2019 Elevated Side [24]
31 Template:Stl વિજય નગર Template:Color box September 30, 2022 Elevated
32 Template:Stl સેક્ટર-1 Template:Color box September 17, 2024 Elevated
33 Template:Stl ઇન્ફોસિટી Template:Color box September 17, 2024 Elevated
34 Template:Stl ધોળાકુવા સર્કલ Template:Color box September 17, 2024 Elevated
35 Template:Stl રાંદેસણ Template:Color box September 17, 2024 Elevated
36 Template:Stl જી એન એલ યુ Template:Color boxTemplate:Color box September 17, 2024 Elevated
37 Template:Stl રાયસણ Template:Color box September 17, 2024 Elevated
38 Template:Stl કોબા સર્કલ Template:Color box April 27, 2025 Elevated
39 Template:Stl નર્મદા કેનાલ Template:Color box April 27, 2025 Elevated
40 Template:Stl તપોવન સર્કલ Template:Color box April 27, 2025 Elevated
41 Template:Stl વિશ્વકર્મા કોલેજ Template:Color box April 27, 2025 Elevated
42 Template:Stl કોટેશ્વર રોડ Template:Color box April 27, 2025 Elevated
43 Template:Stl સેક્ટર-10એ Template:Color box April 27, 2025 Elevated
44 Template:Stl સચિવાલય Template:Color box April 27, 2025 Elevated
45 Template:Stl પી ડી ઈ યુ Template:Color box September 17, 2024 Elevated
46 Template:Stl ગિફ્ટ સિટી Template:Color box September 17, 2024 Elevated
47 Template:Stl થલતેજ ગામ Template:Color box December 8, 2024 Elevated
48 Template:Stl જૂના કોબા Template:Color box 28 September 2025 Elevated
49 Template:Stl કોબા ગામ Template:Color box 28 September 2025 Elevated
50 Template:Stl અક્ષરધામ Template:Color box 11 January 2026 Elevated
51 Template:Stl જૂના સચિવાલય Template:Color box 11 January 2026 Elevated
52 Template:Stl સેક્ટર-16 Template:Color box 11 January 2026 Elevated
53 Template:Stl સેક્ટર-24 Template:Color box 11 January 2026 Elevated
54 Template:Stl મહાત્મા મંદિર Template:Color box 11 January 2026 Elevated

Statistics

Total number of metro stations 54
Number of interchange stations 3
Number of elevated stations 50
Number of underground stations 4
Number of stations at-grade 0

See also

Template:Div col

Template:Div col end

References

  1. PM Narendra Modi inaugurates Ahmedabad Metro first phase, takes a ride. livemint.com(2019-03-04). Retrieved 2019-03-08.
  2. Ahmedabad Metro to open for public on Wednesday. Times of India(5 March 2019).
  3. Ahmedabad Metro to open for public on Wednesday - Times of India. The Times of India(5 March 2019). Retrieved 10 March 2019.
  4. 3 new metro stations in Ahmedabad likely to open later this year. DeshGujarat(2023-04-28). Retrieved 2023-05-28.
  5. Ten firms bid for last section of Phase-2 of Ahmedabad Metro. The Indian Express(2022-05-15). Retrieved 2022-06-11.
  6. Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year. The Indian Express(2022-07-11). Retrieved 2022-07-13.
  7. Ahmedabad Metro receives CMRS clearance. The Indian Express(2022-09-17). Retrieved 2022-09-30.
  8. PM Modi to launch Ahmedabad Metro Phase 1, flag off Vande Bharat Express during two-day Gujarat visit(28 September 2022).
  9. મેટ્રો ટ્રેનની સવારી: અમદાવાદમાં થલતેજ-વસ્ત્રાલ મેટ્રો ગાંધી જયંતીથી, એપીએમસી-મોટેરા 6 ઓક્ટોબરથી શરૂ થશે. Divya Bhaskar(2022-09-30). Retrieved 2022-09-30.
  10. Ahmedabad Metro Phase II trial run likely in June. Times of India(April 20, 2023).
  11. A'bad-G'nagar Metro phase-2 trial run starts. Ahmedabad Mirror. Retrieved 2024-02-24.
  12. PM Modi Inaugurated Ahmedabad Metro Phase 2 And Vande Metro - Metro Rail News(2024-09-17). Retrieved 2024-09-18.
  13. Ahmedabad Metro connectivity to GIFT City by early 2024, says GMRC(19 September 2021).
  14. PM Modi Flags Off Ahmedabad-Gandhinagar Metro Phase-II, Takes Rail Ride. News18(2024-09-16). Retrieved 2024-09-17.
  15. PM Modi inaugurates 2nd phase of Ahmedabad Metro Rail Project. India Today(2024-09-16). Retrieved 2024-09-17.
  16. Ahmedabad Metro route extended to Secretariat in Gandhinagar from Sunday: 7 new stations added. english.gujaratsamachar.com. Retrieved 2025-04-26.
  17. Two more stations to become operational on Ahmedabad-Gandhinagar Metro Rail corridor, DeshGujarat. DeshGujarat(2025-09-26). Retrieved 2025-09-26.
  18. PM Modi inaugurates Sachivalaya-Mahatma Mandir route of Ahmedabad-Gandhinagar Metro, DeshGujarat. DeshGujarat(2026-01-11). Retrieved 2026-01-25.
  19. No parking at 60% metro stations in Ahmedabad. DNA(4 January 2019).
  20. Metro Tunnel from apparel park to kalupur ready. Times of India(26 February 2019).
  21. Ahmedabad Metro gains traction with over 1k passengers daily. DNA(6 May 2019).
  22. Wait for Metro just got longer by 2 Years. Ahmedabad Mirror(7 November 2019).
  23. Ahmedabad Metro train faces technical glitch again operation hampered for around half an hour. UNI(13 March 2019).
  24. Trial run of Ahmedabad Metro on Vastral Gam-Apparel Park stretch to start in January 2019. Times of India(22 August 2018).

Template:Ahmedabad topics Template:Ahmedabad Metro navbox