The Lucknow–Kanpur Expressway (लखनऊ–कानपुर एक्सप्रेसवे), designated as National Expressway 6, is an Template:Convert, 6-lane access controlled expressway road project in India's Uttar Pradesh state. The expressway will connect Kanpur and Lucknow and will run parallel to NH-27 which connects Kanpur and Lucknow with a distance of about Template:Convert between existing and proposed parallel roads. The expressway will start from its junction with NH-27 near Shaheed Path (km 11.000 of existing NH-27) connecting Bani, Kantha, Amarsas and terminating at its junction with NH No. 27 (km 71.300 of existing NH-27) near Kanpur in the State of Uttar Pradesh.[1]

Status updates

  • Nov 2018: Detailed Project Report for 4500 crore project finalised and submitted to the Government of Uttar Pradesh .[2]
  • 07 Mar 2019: Foundation stone laid down by Union Ministers Rajnath Singh and Nitin Gadkari for this project.[3]
  • May 2019: 90% land to be acquired by June 2019 followed by tendering. Civil work is expected to start by August 2019.[4]
  • Feb 2020: Notification for land acquisition to be issued soon.[5]
  • Aug 2020: Construction to start by March 2021[6] and expressway to be ready by March 2023.[7]
  • Sep 2020: Land acquisition under progress. Civil construction work to start in April 2021 and expressway to be ready by October 2023.[8]
  • Dec 2020: Lucknow Kanpur Expressway, declared as NE 6 on December 15, 2020.[9]
  • Feb 2021: Land acquisition done.[10] Civil engineering work is expected to start in July 2021, and thereafter, it is expected to take 30 more months for project completion.[11]

See also

References

  1. Gazette of India notification dated 15 December 2020
  2. बधाई हो : कानपुर-लखनऊ एक्सप्रेस-वे की डीपीआर हुई फाइनल. Rajasthan Patrika(13 November 2018).
  3. Rajnath Singh & Nitin Gadkari laid the foundation stone. The Hans India(7 March 2019). Retrieved 7 March 2019.
  4. Lucknow-Kanpur expressway: अगस्त में शुरू होगा निर्माण, 45 से 50 मिनट में पूरा होगा सफर. Dainik Jagran(22 May 2019).
  5. लखनऊ-कानपुर एक्सप्रेस-वे को मिली हरी झंडी. Navbharat Times(6 February 2020).
  6. Kanpur Lucknow Expressway: छह माह में पूरा होगा निर्माण सितंबर 2023 में शुरू होगा वाहनों का दौड़ना. Dainik Jagran(14 August 2020).
  7. 23 new expressways and highways coming up in next 5 years. The Times of India(13 August 2020).
  8. Lucknow to Kanpur trip in 50 minutes via expressway. The Times of India(17 September 2020).
  9. Ministry of Road Transport & Highways Notification, Gupta, Rajesh. The Gazette of India(15 December 2020).
  10. Lucknow-Kanpur Expressway: लखनऊ-कानपुर एक्सप्रेस-वे के लिए जमीन अधिग्रहण पूरा. Navbharat Times(5 February 2021).
  11. Work of New Expressway project worth Rs 4700 crore to begin in October. The Times of India(18 February 2021).


Template:India-road-stub Template:UttarPradesh-stub