The expressways of India are access-controlled toll highways featuring divided carriageways, engineered to support high-speed vehicular movement and to accommodate heavy loads. They constitute the highest class of road infrastructure in the Indian road network.[1] As of December 2024, the total length of expressways in India was Template:Convert, with Template:Convert under construction.
A central reservation or median separates the traffic moving in opposite directions on expressways. Entry and exits are permitted only through grade separated interchanges. In contrast, National highways may or may not have a median and may lack full access-control.[2] Additionally, some highways constructed by State Governments, which may be fully or partially access-controlled, are designated or named as expressways by the respective State authorities.[3]
Fully opened in April 2002, Mumbai–Pune Expressway was India's first six-lane, access-controlled, inter-city tolled expressway. Spanning Template:Cvt between Mumbai and Pune, within the state of Maharashtra, it set the benchmark for future expressway development in the country. Since then, expressway construction has significantly accelerated, particularly under the Bharatmala project and other infrastructure programmes both national and regional.[4]
As of 2024, the longest expressway in India is the partially-opened Delhi–Mumbai Expressway (Phase-3), spanning Template:Convert, which was inaugurated on 18 December 2024.[5] The widest expressway is the Delhi–Gurgaon section of the Dwarka Expressway, featuring 16 lanes, which was also opened in 2024.
History
Pre-independence
While major roads in the Indian subcontinent existed as early as 29th Century BCE in the Indus Valley, the Template:Cvt long Grand Trunk Road built by the Mauryans during 4th century BCE and later maintained by others, is one of the earliest examples of highest class road infrastructure in India.[6] In 1934, Indian Roads Congress (IRC) was formed to overlook development and research of roads in India and envisioned to achieve a road density of 16 km per 100 km2 of land pre-independence.[7] It was not until in 1995 when National Highways Authority of India (NHAI) was established as an autonomous body to develop, maintain and manage India's road network through National Highways. NHAI would later build and operate various expressways in the country.[8]
Early expressways
In 1990, Government of Maharashtra appointed RITES to conduct a feasibility study for toll-based expressway between Mumbai and Pune, marking it as the first such initiative to construct an expressway in India. Four years later, RITES submitted its report and the project was estimated to cost Template:INRConvert. In March 1997, Maharashtra State Road Development Corporation (MSRDC) undertook the construction of the expressway on a Build–operate–transfer (BOT) model that allowed the state government to collect tolls for 30 years. At the end of the same year, after all environmental and forest clearances, the construction on the Template:Cvt corridor commenced with first sections opening in 2000. In April 2002, India's first expressway was flagged to be fully operational, with an estimated construction cost of Template:INRConvert, which paved the way for more such expressways across the country.[4]
On 24 January 2001, the eight-lane Template:Cvt long DND Flyway between Delhi and Noida was operationalised, becoming the first urban expressway in India.[9] Following Mumbai-Pune, Ahmedabad–Vadodara Expressway was then opened between the cities of Ahmedabad and Vadodara in Gujarat on 16 August 2004. While this expressway was operationalised two years later, it was designated as National Expressway 1 (NE-1) back in 1986 by the Government of India.[10]
In 2009, with the advent of new expressway infrastructures coming up across India, the Ministry of Road Transport and Highways (MoRTH) was preparing to set-up National Expressways Authority of India (NEAI) to be in-charge of the construction and maintenance of expressways, however, the Ministry did not proceed with the creation of NEAI for unspecified reasons and NHAI continued to remain in-charge.[11]
Bharatmala pariyojana
Prior to being subsumed under Bharatmala Pariyojana (Template:Literal translation 'India garland project'), the government of India had launched National Highways Development Project (NHDP) in 1998 as a seven-step flagship project to construct highest class roads in India and to upgrade the existing ones. The phase-4 of which included the development of Template:Cvt of expressways at an indicative cost of Template:INRConvert.[12] In 2017, under Bharatmala about Template:Cvt km of corridors had been identified for development of new expressways, of which Template:Cvt were taken up under phase-1 of the project.[13]
In the 2010s, the states of Maharashtra and Uttar Pradesh took keen interest in investing in expressways through dedicated expressway corporations of MSRDC and UPEIDA respectively.[14] While Maharashtra led by MSRDC completed its second expressway with Template:Cvt long Mumbai–Nagpur Expressway in June 2025, Uttar Pradesh had built four new expressways namely; Bundelkhand, Purvanchal, Agra–Lucknow and Yamuna expressways by the turn of early 2020s.[15] On 21 May 2015, in a first for military aviation and expressway infrastructure in India, the Indian Air Force's Dassault Mirage 2000 successfully landed on the Yamuna Expressway near Mathura in a mock-drill to evaluate the utility of using highways and expressways for emergency landings by military aircraft.[16]
In 2024, the government of India presented an ambitious 'Vision 2047' plan envisioning the construction of up to Template:Cvt of access-controlled highways and expressways, with Indians gaining access to the expressways at a distance of Template:Cvt from any point in the country. The ministry of road transport and highways (MoRTH) had also been finalising new guidelines to improve and standardise infrastructure along the already-developed highways with wayside amenities. Satellite-based tolling was also proposed to be started on 10-15 stretches in the same year.[17]
Timeline
Designation
Expressway categories
Expressways in India are designated into three main categories:
- National Expressways (NE): Managed by NHAI under the Ministry of Road Transport and Highways (MoRTH), these are the medium to long-distance expressways which connect the major cities of India. Delhi–Mumbai Expressway, designated as National Expressway-4 (NE-4) is one such example of a National Expressway.
- Economic Corridors (EC): Also managed by NHAI under MoRTH, these expressways are being built across various Industrial corridors of India. Amritsar–Jamnagar Expressway, designated as Economic Corridor-3 (EC-3) is an example of Industrial expressway.
- State Expressways (SE): These are the regional expressways undertaken by respective state governments to connect the cities within a state. Mumbai–Nagpur Expressway undertaken by Maharashtra state-government's MSRDC is an example for regional expressway undertaken by the Maharashtra state government.
- Urban expressways: Additionally some urban governments and municipalities have also constructed expressways within or near urban areas to facilitate decongestion and faster movement within cities. DND Flyway between Delhi and Noida is an example for toll-free urban expressway.
- Bypass expressways: Bypass expressways are constructed to divert the through-traffic, away from urban areas and city centres. They reduce urban pollution and improve travel speed. Chennai Bypass Road is an example that is built to bypass Chennai.
- Spur expressways: Spur expressways in India are short corridors that branch off from a main expressway to connect important cities, towns, industrial zones or border areas, thus enhancing the regional connectivity. The Template:Cvt long Nakodar–Amritsar spur section which branches off from the Delhi–Katra Expressway is an example.
Greenfield and Brownfield expressways
Greenfield Expressways in India are new expressways that are built on new alignments to facilitate economy of the areas they pass through. These newly built expressways allow for speeds up to Template:Cvt and typically have space reserved between the carriages to allow for a future expansion. Delhi–Mumbai Expressway is an example which is being built with eight-lanes and a reserved space in the median to allow for future expansion of up to twelve lanes.[18] While Brownfield Expressways in India backed by 'Brownfield National Highway Project' (BNHP) are a series of projects undertaken to widen/re-develop existing national highways that have high traffic demand. The upgradation usually involves expansion of lanes from four to six, such as NH-709A.[19]
Design standards
Access
Access-control on Indian expressways offers uninterrupted high-speed travel and safety. It is mainly achieved through fencing, Grade separation with over-passes and under-passes, barriers or medians and with additional dedicated service roads for local traffic. Fully access-controlled expressways do not allow access from side roads, villages or properties but only via inter-changes. Partially access-controlled expressways allow access at some at-grade junctions and minor road crossings may exist. Non access-controlled roads are conventional highways that have a mix of local and through traffic without any entry restrictions.
Carriageways
All Indian expressways have dual carriageways, one for each direction, separated by a median. Each carriageway typically has at least two lanes, with three to four lanes also being common. Most Greenfield expressways have a reserved space between the carriages for future expansion in number of lanes. Some expressways utilise concrete or metal beam crash barriers for safety. Paved shoulders or emergency lanes also exist beside each carriageway to support during the event of accident. Service lanes on each direction are often provided outside the fenced area for local traffic.
The Indian Roads Congress (IRC) has specified guidelines for designing access-controlled highways with its IRC:SP:99-2013 standard. It specifies a standard lane width of Template:Cvt with paved shoulders having a width of Template:Cvt and unpaved shoulders having Template:Cvt width.[20]
Interchanges
Inter-changes are junctions that connect expressway with other roads, highways or other expressways without interrupting the flow of traffic. They improve safety by eliminating right-angle collisions. Indian expressways have various interchanges designed for suitability. System interchanges—such as cloverleaf, three-way, trumpet connect with other national or state highways. Service interchanges—such as Single Point Diamond Interchange (SPDI) are used for connecting smaller roads.[21]
The design of inter-changes for Indian expressways and highways are governed by IRC:SP:99-2013 and Ministry of Road Transport and Highways (MoRTH) guidelines. While Cloverleaf interchanges require at least 20-30 acres of land, directional flyovers require less. The inter-change designs include acceleration/deceleration lanes for safe merging.[20]
Speed
High-speed travel is a key feature on Indian expressways unlike conventional highways where speeds are low due to local traffic and cattle interruptions. The Ministry of Road Transport and Highways (MoRTH) has set speed limits based on road geometry and vehicle type. Some Greenfield expressways are designed for speeds up to Template:Cvt but are legally capped at Template:Cvt for safety, with some expressways capped as low as Template:Cvt. For heavy vehicles such as buses and trucks, it is usually capped at Template:Cvt.[22] The minimum designed speed on ramps on inter-changes per IRC is Template:Cvt.[20]
| Expressway type | Max enforced limit | Design speed |
|---|---|---|
| Greenfield Expressways | Template:Cvt | Template:Cvt |
| Brownfield Expressways | Template:Cvt | Template:Cvt |
| Urban Expressways | Template:Cvt | Template:Cvt |
Infrastructure
Tolls
Expressways in India excluding some urban ones are tolled. They are implemented to recover cost of construction, maintenance and operations, and are primarily managed by NHAI under MoRTH. The tolls are levied based on vehicle category, type of expressway and distance travelled. They form a great source of revenue for funding the expanding expressway network in India. Only designated interchanges allow entry and exit into the tolls. Rates of tolls are revised every year on April 1, based on the Wholesale price index (WPI) to adjust for inflation.[24][25]
FASTag
FASTag is an Electronic toll collection (ETC) system operated in India by NHAI under MoRTH. It uses Radio-frequency identification (RFID) technology to enable automatic deduction of toll charges at toll plazas on Indian expressways, allowing for vehicles to pass without stopping for toll transactions.[26]
The FASTag system is based on the National Electronic Toll Collection (NTEC) programme developed by the National Payments Corporation of India (NPCI) as a part of India's efforts to digitise highway infrastructure and reduce congestion on toll plazas. It was launched in 2014 as a pilot project on the Ahmedabad–Mumbai section of Golden Quadrilateral highway. From 15 February 2021, fastag became mandatory for all four-wheeled vehicles on national highways.[27]
Wayside amenities
Offered by NHAI under MoRTH, Wayside Amenities (WSAs) are dedicated rest and service facilities located along Indian expressways and other national highways to improve road travel comfort, safety, and logistics. They offer rest, food, fuel, charging stations and similar services to both passengers and freight vehicles. The help in reducing driver fatigue, supporting logistics movement and in promoting highway tourism. They are typically located at intervals of Template:Cvt along expressways. In June 2025, NHAI announced an ambitious plan of establishing over 1000 WSAs over a period of five years under Public–private partnership. The WSAs in the plan include setting up of fuel stations and EV charging points, food courts, dhabas and restaurants, convenience stores, medical and childcare rooms, promotional spaces for local artisans, drone landing facilities and helipads at larger sites.[28]
Financing
The financing of Indian expressways is achieved through a combination of public funding, private investment, multilateral lending and via tolls. Ministry of Road Transport and Highways (MoRTH) sets policy and budget allocations while National Highways Authority of India (NHAI) is responsible for implementation and collection of tolls. The private sector entities participate through various Public–private partnership models. A significant amount of funding for expressways comes from central government allocations, especially under Bharatmala Pariyojana. In the 2023-24 Union budget of India, MoRTH was allocated Template:INRConvert, of which a large share was dedicated for expressways and economic corridor developments.[29] In 2024–25, NHAI earned over Template:INRConvert in toll revenue, with projections of Template:INRConvert by 2030 through FASTag and monetisation of roads.[30]
National expressways
Operational national expressways
The following list contains operational national expressways built and operated by National Highways Authority of India (NHAI). Template:Sticky headerTemplate:Sort under Template:Static row numbers
| Expressway | Sign | Terminus | Locale | Length | Lanes | Type | Status | Opening |
|---|---|---|---|---|---|---|---|---|
| Ahmedabad–Vadodara | Jashodha Nagar, Ahmedabad – Dumad, Vadodara | Gujarat | Template:Cvt | 4 | Intrastate | Template:Operational | 16 August 2004[31] | |
| Amritsar–Jamnagar | EC-3 | Tibba, Kapurthala – Jamnagar | Punjab, Haryana, Rajasthan and Gujarat | Template:Cvt | 6 | Inter-state economic corridor | Template:Maybe | 1 December 2025[32] |
| Bengaluru–Chennai | Hosakote – Sriperumbudur | Karnataka, Andhra Pradesh and Tamil Nadu | Template:Cvt | 4 | Inter-state | Template:Maybe | 1 June 2026[33] | |
| Bengaluru–Mysuru | Kumbalgodu, Bengaluru Urban district – Hale Kesare, Mysuru | Karnataka | Template:Cvt | 6 | Intrastate brownfield | Template:Operational | 12 March 2023[34] | |
| Delhi–Dehradun | Delhi – Dehradun | Delhi, Uttar Pradesh and Uttarakhand | Template:Cvt | 6 | Inter-state | Template:Maybe | 1 December 2025[35] | |
| Delhi–Faridabad | Badarpur, Delhi – Sector 37, Faridabad | Delhi NCR | Template:Cvt | 6 | Urban brownfield | Template:Operational | 29 November 2010[36] | |
| Delhi–Gurgaon | Manesar, Gurgaon – Arjun Vihar, Delhi | Delhi NCR | Template:Cvt | 6–8 | Urban brownfield | Template:Operational | 23 January 2008[37] | |
| Delhi–Meerut | Nizamuddin Bridge, New Delhi – Partapur, Meerut | Delhi and Uttar Pradesh | Template:Cvt | 14 | Inter-state | Template:Operational | 1 April 2021[38] | |
| Delhi–Mumbai | Sohna EC, Delhi – JNPT, Mumbai | Delhi, Haryana, Rajasthan, Madhya Pradesh, Gujarat and Maharashtra | Template:Cvt | 8 | Inter-state | Template:Maybe | 1 October 2025[39] | |
| Delhi–Panipat | Delhi – Panipat | Delhi NCR | Template:Cvt | 8 | Inter-state brownfield | Template:Operational | 20 June 2023[40] | |
| DND–KMP | NH-148NA | DND Flyway, Delhi – KMP, Nuh district | Delhi, Haryana and Uttar Pradesh | Template:Cvt | 6 | Inter-state | Template:Maybe | 2026 |
| Durgapur Expressway | Dankuni – Durgapur | West Bengal | 154 km(95.7 mi) | 6 | Intrastate brownfield | Template:Maybe | 2025 | |
| Kona | Hastings, Kolkata – NH 16, Nibra, Howrah | West Bengal | 11 km(6.8 mi) | 6 | Urban brownfield | Template:Maybe | 3 December 2026[41] | |
| Raipur–Bilaspur | Tatibandh, Bilaspur district – Tatibandh, Raipur | Chhattisgarh | Template:Cvt | 4–6 | Intrastate brownfield | Template:Operational | 1 May 2019 | |
| Trans-Haryana (Ambala–Narnaul) | Ghangheri, Kurukshetra district – Surana, Mahendragarh district | Haryana | Template:Cvt | 6 | Intrastate | Template:Operational | 1 August 2022[42] | |
| Mumbai-Nashik | Nashik – Thane | Maharashtra | Template:Cvt | 4-6 | Intrastate | Template:Operational | 2009 |
Under-construction national expressways
Template:Sticky headerTemplate:Sort under Template:Static row numbers
| Expressway | Sign | Terminus | Locale | Length | Lanes | Type | Construction began | Opening |
|---|---|---|---|---|---|---|---|---|
| Ahmedabad–Dholera | Sarkhej, Ahmedabad – Adhelai, Bhavnagar district | Gujarat | Template:Cvt | 4–6 | Intrastate | 2021[43] | 2026[43] | |
| Amas–Darbhanga | Amas, Gaya , Patna, Darbhanga | Bihar | Template:Cvt | 4–6 | Intrastate | 2022[44] | 2026[45] | |
| Ambala-Shamli | Sadopur, Ambala district – Gogwan Jalalpur, Shamli district | Haryana and Uttar Pradesh | Template:Cvt | 6 | Inter-state | 2023[46] | 2026[47] | |
| Awadh (Kanpur–Lucknow) | Azad Chauraha, Kanpur – Shaheed Path, Lucknow | Uttar Pradesh | Template:Cvt | 6 | Intrastate | 2022[48] | 2026[49] | |
| Bengaluru–Vijayawada | Bengaluru – Vijaywada | Karnataka, Andhra Pradesh | Template:Cvt | 6 | Inter-state | 2023[50] | 2027[51] | |
| Delhi–Jaipur | Kherki Dhaula Toll, Gurgaon – Chandwaji, Jaipur | Delhi, Haryana and Rajasthan | Template:Cvt | 4 | Inter-state | 2025[52] | 2027[53] | |
| Delhi–Katra | Bahadurgarh border, Delhi – Katra | Delhi, Haryana, Punjab, Jammu and Kashmir | Template:Cvt | 4 | Inter-state | 2021[54] | 31 December 2025[55] | |
| Durg–Arang | Tendesara, Rajnandgaon district – Mahanadi Bridge, Arang | Chhattisgarh | Template:Cvt | 6 | Intrastate | 2022[56] | 30 June 2026[57] | |
| Faridabad–Ghaziabad | Greater Faridabad, Faridabad – Rahul Vihar, Ghaziabad | Uttar Pradesh and Haryana | Template:Cvt | 6 | Inter-state | 2025[58] | 2027[59] | |
| Ghaziabad-Kanpur Expressway | Ghaziabad – Kanpur | Uttar Pradesh | Template:Cvt | 6 | Intrastate | 2025[60] | 2026[60] | |
| Hyderabad–Indore | Hyderabad – Indore | Telangana, Maharashtra and Madhya Pradesh | Template:Cvt | 4 | Inter-state brownfield | 2024[61] | 2025[62] | |
| Jaipur–Bandikui | NE-4C | Jaipur – Bandikui | Rajasthan | Template:Cvt | 4 | Intrastate spur | 2022[63] | 1 July 2025[64] |
| Ludhiana–Ajmer | EC-8 | Ludhiana – Ajmer | Punjab, Haryana and Rajasthan | Template:Cvt | 6 | Inter-state economic corridor | 2025[65] | TBD |
| Nagpur–Vijayawada | Nagpur – Vijaywada | Maharashtra, Telangana and Andhra Pradesh | Template:Cvt | 4 | Inter-state economic corridor | 2023[66] | 2027[66] | |
| Paniyala–Barodamev | Paniyala Mod, Kotputli – Barodamev, Alwar | Haryana and Rajasthan | Template:Cvt | 6 | Inter-state economic corridor | 2024[67] | 2026[67] | |
| Raipur–Dhanbad | EC-7 | Dharsiwa, Raipur district – Dhanbad | Chhattisgarh and Jharkhand | Template:Cvt | 4 | Inter-state economic corridor | 2023[68] | 2026[69] |
| Raipur–Hyderabad | Patan, Raipur – Hyderabad | Chhattisgarh, Maharashtra and Telangana | Template:Cvt | 6 | Inter-state | 2023[70] | 2026[70] | |
| Raipur–Visakhapatnam | Abhanpur, Raipur district – Visakhapatnam Port, Visakhapatnam | Chhattisgarh, Odisha and Andhra Pradesh | Template:Cvt | 6 | Inter-state economic corridor | 2022[71] | 2026[71] | |
| Surat–Chennai | Surat district – Chennai district | Gujarat, Maharashtra, Karnataka, Telangana, Andhra Pradesh and Tamil Nadu | Template:Cvt | 6 | Inter-state | 2023[72] | 2026[72] | |
| Urban Extension Road-II | NH-344M | Alipur – Mahipalpur | Delhi NCR | Template:Cvt | 6 | Urban | 2021[73] | 2025[74] |
| Varanasi–Kolkata | NH-319B | Varanasi Ring Road, Chandauli district – Sarisha, Diamond Harbour | Uttar Pradesh, Bihar, Jharkhand, West Bengal | Template:Cvt | 6 | Inter-state | 2024[75] | 2027[76] |
| Gorakhpur–Siliguri | Gorakhpur - Siliguri | Uttar Pradesh, Bihar, West Bengal | 519 km (322 mi) | 4 | Inter-state | 2025 | 2028 | |
| Kharagpur–Morgram | NH - 116A | Kharagpur – Morgram | West Bengal | Template:Cvt | 4 | Intrastate | 2025 | 2028 |
Proposed national expressways
Template:Sticky headerTemplate:Sort under Template:Static row numbers
| Expressway | Terminus | Locale | Length | Lanes | Type | Proposed in |
|---|---|---|---|---|---|---|
| Bhopal–Indore | Kalan, Bhopal – Karnawad, Indore district | Madhya Pradesh | Template:Cvt | 6 | Intrastate | 2025[77] |
| Chambal (Kota–Etawah) | Seemalya, Kota district – Nanawa, Etawah district | Rajasthan, Madhya Pradesh and Uttar Pradesh | Template:Cvt | 6 | Inter-state | 2017[78] |
| Haldia–Raxaul | Haldia – Mehsi, Raxaul | West Bengal, Jharkhand and Bihar | Template:Cvt | 6 | Inter-state | 2022[79] |
| Kharagpur–Visakhapatnam | Kharagpur – Visakhapatnam | West Bengal, Odisha and Andhra Pradesh | Template:Cvt | 6 | Inter-state | 2025[80] |
| Ludhiana–Ajmer | Ludhiana – Ajmer | Punjab Haryana and Rajasthan | Template:Cvt | 6 | Inter-state | 2019[81] |
| Nagpur–Bengaluru | Nagpur – Bengaluru Rural district | Maharashtra, Telangana, Andhra Pradesh and Karnataka | Template:Cvt | 8 | Inter-state | 2025[82] |
| Narmada | Amarkantak – Alirajpur | Madhya Pradesh | Template:Cvt | 8 | Intrastate | 2020[83] |
| Palakkad–Kozhikode | Marutharode, Palakkad district – Pantheeramkavu, Kozhikode district | Kerala | Template:Cvt | 4 | Intrastate | 2025[84] |
| Panipat–Dabwali | Panipat district – Dabwali, Sirsa district | Haryana | Template:Cvt | 4 | Intrastate | 2025[85] |
| Pune–Bengaluru | Pune – Bengaluru rural district | Maharashtra and Karnataka | Template:Cvt | 8 | Inter-state | 2022[86] |
| Ranchi–Jamshedpur | Ranchi district – Jamshedpur | Jharkhand | Template:Cvt | 4 | Intrastate brownfield | 2025[87] |
| Thiruvananthapuram–Angamaly | Pulimath, Thiruvananthapuram district – Angamaly, Ernakulam district | Kerala | Template:Cvt | 6 | Intrastate | 2023 (Stalled)[88] |
Bypass expressways
Operational bypass expressways
Template:Sticky headerTemplate:Sort under Template:Static row numbers
Under-construction bypass expressways
Template:Sticky headerTemplate:Sort under Template:Static row numbers
| Bypassing city | Expressway | Sign | Terminals | Locale | Length | Lanes | Owner | Construction began | Opening |
|---|---|---|---|---|---|---|---|---|---|
| Kanpur | Kanpur Outer Ring | Mandhana | Uttar Pradesh | Template:Cvt | 6 | NHAI | 2024[104] | 2027[104] | |
| Pune | Inner Ring Road | Maharashtra | Template:Cvt | 6 | PMRDA | 2025 | 2028 | ||
| Pune | Outer Ring Road | Maharashtra | Template:Cvt | 8 | MSRDC | 2025 | 2028 | ||
| Ambala and Kurali | Ambala-Kurali Expressway | Punjab | Template:Cvt | 8 | National Highways Authority of India | 2024 | 2026 |
Proposed bypass expressways
Template:Sticky headerTemplate:Sort under Template:Static row numbers
| Bypassing city | Expressway | Sign | Terminals | Locale | Length | Lanes | Owner | Proposed in |
|---|---|---|---|---|---|---|---|---|
| Amaravati | Amaravati Outer Ring | Guntur district – Krishna district | Andhra Pradesh | Template:Cvt | 6 | NHAI | 2015[105] | |
| Patna | Patna Outer Ring | Vaishali district – Saran district | Bihar | Template:Cvt | 6 | NHAI | 2018[106] | |
| Thiruvananthapuram | Thiruvananthapuram OAGC | NH-886 | Vizhinjam – Navaikulam | Kerala | Template:Cvt | 6 | NHAI | 2020.[107] |
Other expressways
| Expressway | Terminus | Locale | Length | Lanes | Type | Status | Opening |
|---|---|---|---|---|---|---|---|
| Delhi–Noida Direct Flyway | Delhi – Noida, Uttar Pradesh | Delhi, Uttar Pradesh | Template:Convert | 8 | Inter-state | Template:Operational | 24 January 2001[108] |
Expressways operated by state
The following list consists expressways of India, built and operated by their respective state governments, rather than NHAI.
| States | Expressways | Length operational |
|---|---|---|
| Bihar | 1 | Template:Cvt |
| Chhattisgarh | 1 | Template:Cvt |
| Haryana | 1 | Template:Cvt |
| Maharashtra | 7 | Template:Cvt |
| Punjab | 1 | Template:Cvt |
| Uttar Pradesh | 5 | Template:Cvt |
| West Bengal | 1 | Template:Cvt |
See also
- Transport in India
- List of national highways in India
- Ring roads in India
- India–China Border Roads
- Setu Bharatam
- High-speed rail in India
- Urban rail transit in India
- Sagar Mala project
References
- ↑ Wayback Machine. tis.nhai.gov.in. Retrieved 2025-06-26.
- ↑ Wayback Machine. www.indiacode.nic.in. Retrieved 2025-06-26.
- ↑ Wayback Machine. nhai.gov.in. Retrieved 2025-06-26.
- ↑ 4.0 4.1 Mumbai-Pune Expressway: History, Structure, Missing Link And More – My India, Shekhawat, Aditya(2025-01-22). Retrieved 2025-06-26.
- ↑ 80km route of Del-Mum eway opens, to boost connectivity(18 December 2024).
- ↑ Template:Cite magazine
- ↑ History of Road Development in India. Retrieved 5 May 2018.
- ↑ Roadways in India - Road Industry, Network, Projects & FDI. www.investindia.gov.in. Retrieved 2021-09-07.
- ↑ 'Noida jinx' to keep Akhilesh Yadav away from PM event(29 December 2015).
- ↑ Wayback Machine. egazette.nic.in. Retrieved 2025-06-26.
- ↑ By 2022, govt to lay 18,637km of expressways. The Times of India(23 November 2009). Retrieved 10 January 2020.
- ↑ National Highways Development Project Map. National Highways Institute of India.
- ↑ Wayback Machine. archive.pib.gov.in. Retrieved 2025-06-27.
- ↑ Maharashtra, UP to drive state-led capex in road sector in next 3 yrs. The Times of India(2019-05-07). Retrieved 2025-06-27.
- ↑ Explained: Politics of Uttar Pradesh expressways. The Indian Express(2021-11-23). Retrieved 2025-06-27.
- ↑ IAF successfully test-lands Mirage on Yamuna e-way. The Times of India(22 May 2015).
- ↑ Govt’s Vision ‘47 set to target 50,000km of expressways. mint(2024-01-05). Retrieved 2025-06-27.
- ↑ Nod to elevated corridor on Greenfield Expressway, budget likely to rise by 48%. The Tribune. Retrieved 2025-06-27.
- ↑ Brownfield National Highway Project | CEPT - Portfolio. portfolio.cept.ac.in. Retrieved 2025-06-27.
- ↑ 20.0 20.1 20.2 IRC SP 099: Manual of Specification and Standards for Expressways{{#if:Indian Roads Congress|, Indian Roads Congress}(2013)
- ↑ Wayback Machine. law.resource.org. Retrieved 2025-06-26.
- ↑ Tyre Speed Rating vs Legal Speed Limit in India. Vredestein Tyres. Retrieved 2025-06-27.
- ↑ Tyre Speed Rating vs Legal Speed Limit in India. Vredestein Tyres. Retrieved 2025-06-28.
- ↑ Toll taxes across Indian highways set to increase from April 1. Details inside. India Today(2025-04-01). Retrieved 2025-06-28.
- ↑ Toll tax on national highways, expressways hiked by up to 5 percent, Bhatnagar, Viraaj. Autocar India. Retrieved 2025-06-28.
- ↑ FAQs on NETC FASTag. Retrieved 27 December 2021.
- ↑ FASTags mandatory for all 4 wheelers from today; hybrid lanes to accept cash till February 15 - BusinessToday. Business Today(2021-01-01). Retrieved 2025-06-28.
- ↑ NHAI’s Innovative Strategy to Attract Global Expertise for World-Class Highway Amenities. Park+. Retrieved 2025-06-28.
- ↑ Budget 2024 | Road sector budget sees a nominal hike of 2.7%. The Hindu(2024-02-01). Retrieved 2025-06-28.
- ↑ Toll mopup rises 12.5% in FY25 to an all-time high. The Economic Times(2025-04-04). Retrieved 2025-06-28.
- ↑ Ahmedabad Vadodara Expressway to be ready by March-Source-Business Standard. Retrieved 30 December 2021.
- ↑ Amritsar – Jamnagar Economic Corridor – Information & Status. The Metro Rail Guy. Retrieved 2025-06-29.
- ↑ Bengaluru-Chennai Expressway to be fully operational by June 2026. The Hindu(2025-03-17). Retrieved 2025-06-25.
- ↑ Prime Minister Narendra Modi inaugurates 118-km Bangalore-Mysore Expressway. The Telegraph(12 March 2023). Retrieved 13 March 2023.
- ↑ Delhi-Dehradun expressway status: Travel from Delhi to Dehradun in 2.5 hours soon - details here. The Times of India(2024-09-03). Retrieved 2025-06-30.
- ↑ Delhi Faridabad Expressway.
- ↑ Excess cars made tolling a taxing truth at first: Expressway builder. Express India. Retrieved 2010-09-16.
- ↑ Delhi-Meerut Expressway open for public, cuts travel time to 45 minutes.
- ↑ Delhi-Mumbai Expressway Set To Open For All by 2025. India.com(2024-08-02). Retrieved 2024-08-02.
- ↑ Completion of Delhi-Panipat corridor allows commuters to breathe easy. The Hindu(2023-07-08). Retrieved 2025-06-30.
- ↑ {{cite web| url=https://www.magicbricks.com/blog/kona-expressway/133175.html | title=Kona Expressway - Route, Speed, & Real-Estate Impact | publisher=magicbricks | date=19 October 2023
- ↑ Haryana: Six Lane Ambala - Narnaul Expressway Opened For Public, To Ease Traffic In Delhi NCR. Swarajya(1 August 2022). Retrieved 1 August 2022.
- ↑ 43.0 43.1 Ahmedabad Dholera Expressway: Opening Date & Latest Updates (2025). Latest Global Construction Industry Projects (2024) - Blackridge Research & Consulting(2025-06-24). Retrieved 2025-07-01.
- ↑ Amas - Darbhanga Expressway - Information & Status. The Metro Rail Guy. Retrieved 2025-07-01.
- ↑ Amas Darbhanga Expressway Bihar - Greenfield Expressway NH 119D. Magicbricks Blog(2024-01-08). Retrieved 2025-07-01.
- ↑ Shamli to Ambala: Connecting Small Cities with Big Dreams!. www.instagram.com. Retrieved 2025-06-30.
- ↑ GRAP norms bring NHAI projects to halt. The Tribune. Retrieved 2025-06-30.
- ↑ PNC Wins Kanpur Lucknow Expressway's Contract. The Metro Rail Guy(2022-02-23). Retrieved 2022-04-25.
- ↑ Lucknow News Roundup | Awadh Expressway to be ready by June, temp to drop in next 48 hrs & more, Shewaramani, Jatin. Knocksense(2025-01-02). Retrieved 2025-06-25.
- ↑ Bangalore–Vijayawada Expressway – Information & Status. The Metro Rail Guy. Retrieved 14 March 2024.
- ↑ PM Modi Inaugurates, Lays Foundation Stone For 112 National Highway Projects(11 March 2024). Retrieved 14 March 2024.
- ↑ Full Guide to the Delhi–Jaipur Expressway: Timeline, Route, Real Estate Growth - Times Property. timesproperty. Retrieved 2025-06-30.
- ↑ Delhi - Jaipur Super Expressway – Information & Status. The Metro Rail Guy. Retrieved 2025-06-30.
- ↑ Delhi-Katra in 6 hours by road. Expressway to be launched in 2 years, Livemint. livemint.com(2021-09-16). Retrieved 2021-09-16.
- ↑ Barring Punjab, 669 km Delhi-Katra e-way almost complete in most states, The Tribune, 23 Aug 2024.
- ↑ Chhattisgarh Infrastructure: Durg set for major infra boost with expressways, metro, and industrial projects. propnewstime.com. Retrieved 2025-07-01.
- ↑ Project Details. NHAI(27 December 2022).
- ↑ Delhi-NCR news: BIG update on long-pending Faridabad-Noida-Ghaziabad expressway, authorities agree to..., Tamta, Prashant. DNA India. Retrieved 2025-06-30.
- ↑ FNG Expressway: Route, Status And Construction Timeline. www.91infra.com. Retrieved 2025-06-30.
- ↑ 60.0 60.1 Ghaziabad-Kanpur Expressway to link 9 UP districts, may be extended to Jewar Airport. Moneycontrol. Retrieved 2025-07-01.
- ↑ Gadkari Carries Out Aerial Inspection Of 33-Km Stretch Of High-Speed Indore-Hyderabad Corridor, Bharat, E. T. V.. ETV Bharat News(2025-01-10). Retrieved 2025-06-30.
- ↑ Indore-Hyderabad Economic Corridor – Information & Status Update. The Metro Rail Guy. Retrieved 2025-06-30.
- ↑ Salient Features – GR Bandikui Jaipur Expressway Private Limited. Retrieved 2025-06-29.
- ↑ From July, travel time between Delhi and Jaipur to reduce by an hour. Retrieved 26 June 2025.
- ↑ Work begins to build Ludhiana-Bathinda national highway at Rs 1,555 crore. The Tribune. Retrieved 2025-06-30.
- ↑ 66.0 66.1 Nagpur-Vijayawada Economic Corridor – Information & Status Update. The Metro Rail Guy. Retrieved 2025-06-30.
- ↑ 67.0 67.1 Six-lane highway project in Alwar integrates 23 animal underpasses. The Times of India(24 February 2025).
- ↑ PM Inaugurates, Lays Foundation Stones in Raipur. Drishti IAS. Retrieved 2025-06-30.
- ↑ Raipur-Dhanbad expressway and rail upgrades to reshape Coal Capital's future. propnewstime.com. Retrieved 2025-06-30.
- ↑ 70.0 70.1 Raipur-Hyderabad Expressway to cut down travel time between the cities by 2025. The Times of India(2025-01-17). Retrieved 2025-07-01.
- ↑ 71.0 71.1 Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates. MagicBricks(13 April 2022). Retrieved 14 March 2023.
- ↑ 72.0 72.1 PM Modi lays foundation stone for Karnataka section of 6-lane Surat-Chennai Expressway. Times Now(19 January 2023). Retrieved 12 March 2023.
- ↑ Delhi Urban Extension Road 2 – Information & Status. The Metro Rail Guy. Retrieved 2025-06-30.
- ↑ Delhi’s 3rd Ring Road to open by August. Hindustan Times(7 June 2025).
- ↑ Varanasi Ranchi Kolkata Expressway 6 Lane E-Way To Reduce Time By 6 Hours. Magicbricks(23 February 2024). Retrieved 23 February 2024.
- ↑ NHAI's Ambitious 610-Km Varanasi-Kolkata Expressway To Be Operational By 2027. Swarajya(9 December 2022). Retrieved 10 December 2022.
- ↑ Bhopal to boast India's best transport system: Multi-state travel within 12 hours. Patrika News(2025-02-25). Retrieved 2025-07-01.
- ↑ Chambal Expressway aka Atal Progressway Complete Project Details. Retrieved 16 March 2023.
- ↑ Six-Lane Expressway Connecting Raxaul To Haldia Coming Up By 2028, To Cost Rs 54,000 Crore. News18. Retrieved 2025-07-01.
- ↑ Kharagpur-Visakhapatnam Expressway to change Eastern India's road connectivity. The Times of India. Retrieved 2025-06-30.
- ↑ Shelved Ludhiana-Bathinda highway project back on track. The Tribune. Retrieved 2025-07-01.
- ↑ NHAI awards 251-km Hyderabad-Nagpur corridor for Rs 6,661 cr under TOT model. The Economic Times(2024-09-20). Retrieved 2025-07-01.
- ↑ Bhopal: Cabinet gives nod to 906-km Narmada Expressway construction. Free Press Journal.
- ↑ Rs 6,700 crore boost for road development in Kerala. The New Indian Express(2025-06-05). Retrieved 2025-07-01.
- ↑ Haryana's Ambitious 300km Highway Project: Dabwali to Panipat Expressway. en.theharyanastory.com(2025-02-04). Retrieved 2025-07-01.
- ↑ Pune Bengaluru Expressway - Route, Map, Cost, Progress, and More - Infra Info Hub(2025-05-23). Retrieved 2025-05-23.
- ↑ Ranchi Jamshedpur highway. magicbricks(22 April 2025).
- ↑ No plans to go ahead with greenfield NH projects, says Centre. The Hindu(2024-12-12). Retrieved 2025-07-01.
- ↑ Bangalore Satellite Town Ring Road – Information & Status. The Metro Rail Guy. Retrieved 2025-07-01.
- ↑ NHAI mulls linking service roads along bypass from Madhavaram to Irumbuliyur. The New Indian Express(2024-10-02). Retrieved 2025-07-01.
- ↑ Gurgaon: Kundli-Manesar expressway inauguration today. Retrieved 5 Nov 2018.
- ↑ PM Modi to inaugurate Western Peripheral Expressway: All you need to know.
- ↑ Dwarka Expressway – Information & Status Update. The Metro Rail Guy. Retrieved 2025-07-01.
- ↑ ORR: Ghatkesar – Shameerpet stretch opens. TOI(15 July 2016). Retrieved 5 July 2016.
- ↑ Rising crime on Belghoria expressway(19 August 2009).
- ↑ Lucknow's pivotal project, Outer Ring Road all set to be inaugurated in March(28 February 2024).
- ↑ Elevated Road: An unwanted ‘white elephant’ in the making. The Tribune. Retrieved 2025-07-01.
- ↑ Mumbai Trans Harbour Link Inauguration Live Updates: PM Modi inaugurates Atal Setu bridge. The Times of India(12 January 2024). Retrieved 12 January 2024.
- ↑ UltraTech Cement Limited || Projects || PimpalGaon-Nashik-Gonde Road Project. Ultratechcement.com. Retrieved 2013-07-23.
- ↑ India's longest flyover inaugurated. Projects Today(17 July 2008).
- ↑ Allahabad Bypass Expressway, Map of Allahabad Bypass. www.mapsofindia.com. Retrieved 2025-07-01.
- ↑ 1st phase of ring road to be over before Mahakumbh. The Times of India(2023-03-16). Retrieved 2025-07-01.
- ↑ One lane of Ganga bridge in Kashi set to open by May end. The Times of India(2024-03-07). Retrieved 2025-07-01.
- ↑ 104.0 104.1 22 Firms Qualify for Kanpur Ring Road Packages 2A & 2B's Contracts. The Metro Rail Guy(2024-10-25). Retrieved 2025-07-01.
- ↑ Road projects: land acquisition to be a daunting task for AP. The Hindu(7 December 2015). Retrieved 3 March 2016.
- ↑ Centre approves ring road, elevated highway projects | Patna News. The Times of India.
- ↑ PM Modi to lay stone for Outer Ring Road in Thiruvananthapuram on April 25 - The New Indian Express. www.newindianexpress.com. Retrieved 2023-06-27.
- ↑ DND Flyway steers clear of usual hurdles, connects Delhi to Noida. India Today(2001-02-05). Retrieved 2026-01-20.