Template:Infobox station Andheri (station code: A (Western)/AD (Harbour)/ADH (Indian Railways)) is a passenger rail station located at Andheri suburb of Mumbai. It serves the Western line and Harbour lines of the Mumbai Suburban Railway. It is also a stop for some express trains and August Kranti Rajdhani Express. The station also inter-connects the Line 1 of the Andheri metro station.[1] Andheri station first came under prominence after the development of Salsette–Trombay Railway services in 1928 by the British Empire of India during the pre-independence period.[2]
With a pre-eminent number of passengers boarding daily, it has been termed "one of the busiest stations" in Mumbai surpassing Ghatkopar station on the Central line.[3] In 2014, the station, along with Template:Stnlnk and Template:Stnlnk stations, was re-developed and expanded with the expenditure of Template:INRConvert.[4] In addition, the station has two bus stations operating more than 30 bus routes.[5]
History
Salsette–Trombay railway service
The Indian Railways was first established by British Empire of India in 1853 and it connected its first railway service between Bombay (now Mumbai) and Thane. In 1928, the British Empire connected Andheri station with Trombay by the Great Indian Peninsular Railway under the Bombay Improvement Trust as "Salsette–Trombay Railway line" with a view for the opening up of a railway line running West to South-east and linking up Andheri and Kurla station.[2][6] However, in 1934 the line had shut down due to the development of Santacruz Airport.[7]
Metro–Local connection
In February 2014, It was proposed by the Mumbai Metropolitan Region Development Authority to integrate the Andheri metro station with the suburban station with the development of the skywalk and the same was proposed for the Ghatkopar metro station.[8]
After the establishment of Mumbai Metro services In June 2014, a skywalk of Template:Convert has been developed by the MMRDA for the passengers traveling from local station to the metro station.[9][10] The skywalk has been built opposite to the auto-rickshaw terminal of the station with an expenditure of Template:INRConvert.[11]
Proposed expansion and re-development
The Harbour line of the Andheri station towards Chhatrapati Shivaji Terminus and Template:Stnlnk serves a total number of 36 trains per day.[12] The development of the Harbour line extension till Goregaon station has been announced under the Mumbai Urban Transport Project scheme in 2011.[13] However, in 2014 the development of the project had been stopped due to a Template:Convert stretch, which was used by the railways for laying of tracks between Andheri and Goregaon stations.[14]
The station was renovated in early 2015 with the establishment of automated escalators and new Automated Ticket Vending Machines (ATVM) for the ease of booking tickets to the daily passengers.[15][16][17] According to the statistics of April 2014 to January 2015, the number of passengers using vending machines was 6,933, whereas in April 2015 to January 2016, it had the higher number of bookings with a total number of 18,316 passengers.[18] Due to the increasing number of passengers travelling on the rooftop of the train coaches, Commissioner of Railway Safety (CRS) electrified the train coaches rooftops containing 25,000 volts.[19][20]
The station has nine platforms, with platform number 1 and 2 serving the Harbour line. Further, the Harbour lines now serves a 12-coach train services.[21] In 2012, it was proposed by the Mumbai Railway Vikas Corporation that the Harbour line trains may get an extension of 12-coaches for the ease of passengers boarding daily from the Western lines.[21] However the MRVC announced that extension of some stations has been completed and the services may start from 2016.[22]
In February 2016, it was reported that the main road of the eastern zone of the station will be re-constructed in according for development of a long delayed elevated auto-rickshaw terminal. The Bombay High Court had ordered to evict the stalls blocking the road. Counsel Anil Sakhare had stated to the court that the stall vendors blocked the construction and infrastructure development and most of the vendors opposed the eviction notice given to them.[23] The work was originally started in 2011 and was to complete in December 2013 but as the corporation was unable to evict the stalls, the work was kept on hold. However, the Brihanmumbai Municipal Corporation had removed the stalls from the road and the construction for the terminal had been started.[24] It has a two-lane terminal measuring the height of Template:Convert and a width of Template:Convert which connects the Andheri-Kurla road.[25] Under the second phase of MUTP, three escalators and 2 lifts will be installed.[26]
Traffic
Andheri is the busiest station on the Western Railway network. Over 99.6 million passengers' journeys originated at the station during the 2016–17 fiscal year. During the same period, the station sold Template:INRConvert worth of tickets (or 9% of all tickets sold on the Western Line) and 890,000 season passes, earning WR a total revenue of Template:INRConvert. An average of 66,152 tickets and 2,441 season passes were sold at the station daily, and an average of 256,561 passengers began their journeys at Andheri per day contributing Template:INRConvert of average daily revenue.[27]
Station layout

| Stations | Stations between platforms | |
| Platforms (HR)/(WR) |
Direction (Harbour line) | ← Harbour line towards Chhatrapati Shivaji Terminus or Template:Stnlnk ← |
| Side platform, directions on the left | ||
| Direction (Western line) | ← Western line towards Template:Stnlnk ← | |
| Platforms (WR) |
Direction (Western line) | → Western line towards Dahanu → |
| Side platform, directions on the right | ||
The station consists of a Template:Convert-long auto-rickshaw terminal at the eastern zone of Andheri. It has been built between the northern and middle foot-over bridges of the station and its connected to the northern bridge and continues down a road to the MV Road. In addition, the auto-rickshaw services are used for the passengers crossing through the Nityanand Road from the northern bridge to get down the road at the eastern bridge of the station. However, the designed structure was used for commuters serving as the only foot overbridge for the metro station as the terminal was kept unused.[28]
Bus connections
The Oshiwara depot serves as a major hub and transfer point for Andheri bus routes serving the western area. All routes pull into the station's busway off Yari Road bus station, though some can be caught at Goregaon via the station's bus depot entrance as well. The eastern area is connected by buses between Agarkar Chowk Depot and Majas Depot, Ghatkopar Depot, Kurla Depot and Mulund Depot. But due to the increment of the Mumbai Metro service fare rates, the Ghatkopar-Andheri bus services proved to be a beneficial deal for the passengers.[29]
References
- ↑ Mumbai's first metro may chug in March 2013. DNA India(6 May 2012). Retrieved 12 June 2012.
- ↑ 2.0 2.1 History Of Andheri. Nearfox(9 December 2014). Retrieved 5 March 2016.
- ↑ Andheri station zone is busiest transit point(10 June 2014). Retrieved 13 February 2016.
- ↑ 3 stations set for a 103-crore makeover, Mehta, Manthan K(4 December 2011). Retrieved 3 September 2014.
- ↑ Unclog Mumbai: Andheri station at breaking point(25 November 2015). Retrieved 16 January 2016.
- ↑ Report of the Bombay Development Committee. Government of Bombay, 1914. Retrieved 20 March 2012.
- ↑ Railway Gauges in India. IRFCA. Retrieved 20 March 2012.
- ↑ Mumbai Metro-local integration awaits nod(5 February 2014). Retrieved 12 February 2016.
- ↑ MMRDA, Railways work together to close gap between railway, Metro stations at Andheri & Ghatkopar(20 May 2014). Retrieved 16 January 2016.
- ↑ Mumbai Metro to be Thrown Open to the Public Tomorrow. NDTV(7 June 2014). Retrieved 12 February 2016.
- ↑ SKYWALK TO LINK ANDHERI RAILWAY, METRO STATIONS(3 August 2015). Retrieved 13 February 2016.
- ↑ WORK TO START IN JAN TO EXTEND CST'S HARBOUR PLATFORMS FOR 12 CARS(21 September 2014). Retrieved 16 January 2016.
- ↑ Harbour line to reach Goregaon(5 September 2011). Retrieved 16 January 2016.
- ↑ Land snag hits Harbour's Goregaon route(21 May 2014). Retrieved 16 January 2016.
- ↑ Highest number of mobile tickets booked in Andheri(10 July 2015). Retrieved 21 January 2016.
- ↑ Rs 2,000-crore makeover for 20 Mumbai railway stations(10 January 2015). Retrieved 16 January 2016.
- ↑ Mumbai railway stations set for redevelopment(18 July 2015). Retrieved 16 January 2016.
- ↑ Mumbai: Andheri 'smartest' station on Western Railway. Retrieved 10 March 2016.
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedelctroz - ↑ Mumbai: 25,000 volts to 'shock' rooftop travellers. CNN-IBN(30 January 2012). Retrieved 18 January 2016.
- ↑ 21.0 21.1 All Harbour line trains to get 12 coaches(28 January 2012). Retrieved 18 January 2016.
- ↑ Don't expect 12-coach trains on Harbour line before 2016(22 January 2015). Retrieved 18 January 2016.
- ↑ Andheri station may soon get elevated auto deck(7 February 2016). Retrieved 12 February 2016.
- ↑ Finally, BMC removes stalls outside Andheri (E) station to make way for auto ramp(10 February 2016). Retrieved 12 February 2016.
- ↑ Demolition outside Andheri station gets BMC thumbs-up from commuters(13 February 2016). Retrieved 15 February 2016.
- ↑ MUTP-I officially ends(31 March 2016). Retrieved 16 April 2016.
- ↑ Andheri remains WR's busiest station, accounts for 9% of tickets sold | Latest News & Updates at Daily News & Analysis. DNA(8 April 2017). Retrieved 9 April 2017.
- ↑ Mumbai: Hawkers look to take over Rs 8-crore Andheri auto deck(11 July 2015). Retrieved 18 January 2016.
- ↑ BEST route sees surge in commuters after Metro hikes fare(18 January 2015). Retrieved 18 January 2016.
External links
- Andheri railway station at WR official portal
- Andheri station at Go4Mumbai
Template:Railway stations in Maharashtra Template:Mumbai – Suburban Railway, Western Template:Mumbai – Suburban Railway, Harbour