The Artemis program is a robotic and human Moon exploration program led by the United States' National Aeronautics and Space Administration (NASA) along with five major partner agencies— the European Space Agency (ESA), the Japan Aerospace Exploration Agency (JAXA), the Canadian Space Agency (CSA), the Israel Space Agency (ISA) and the Australian Space Agency (ASA).[1][2][3] The Artemis program is intended to reestablish a human presence on the Moon for the first time since the Apollo 17 mission in 1972. The main parts of the program are the Space Launch System (SLS), the Orion spacecraft, the Lunar Gateway space station, and the commercial Human Landing Systems. The program's long-term goal is to establish a permanent base on the Moon to facilitate the feasibility of human missions to Mars.
The Artemis program is a collaboration of government space agencies and private spaceflight companies, bound together by the Artemis Accords and supporting contracts. As of July 2023, twenty-seven countries and one territory had signed the accords,[4] including traditional U.S. space partners (such as the European Space Agency and agencies from Canada, Japan, and the United Kingdom) and emerging space powers (such as Brazil, South Korea, India, and the United Arab Emirates).[5]
The Artemis program was formally established in 2017. Many of its parts, such as the Orion spacecraft, were developed during the previous Constellation program (2005–2010), and after its cancellation. Orion's first launch, and the first use of the Space Launch System, was originally set in 2016, but was rescheduled and launched on 16 November 2022 as the Artemis 1 mission, with robots and mannequins aboard. According to plan, the crewed Artemis 2 launch will take place in 2024, the Artemis 3 crewed lunar landing in 2025, the Artemis 4 docking with the Lunar Gateway in 2028, and future yearly landings on the Moon thereafter. However, some observers note that the program's cost and timeline are likely to be overrun and delayed.[6][7]
Overview
The Artemis program is organized around a series of Space Launch System (SLS) missions. These space missions will increase in complexity and are scheduled to occur at intervals of a year or more. NASA and its partners have planned Artemis 1 through Artemis 5 missions; later Artemis missions have also been proposed. Each SLS mission centers on the launch of an SLS launch vehicle carrying an Orion spacecraft. Missions after Artemis 2 will depend on support missions launched by other organizations and spacecraft for support functions.
SLS missions
Artemis 1 (2022) was the successful uncrewed test of the SLS and Orion, and was the first test flight for both craft.Template:Efn The Artemis 1 mission placed Orion into a lunar orbit and then returned to Earth. The SLS Block 1 design uses the ICPS second stage, which performs the trans-lunar injection burn to send Orion to lunar space. For Artemis 1, Orion braked into a polar distant retrograde lunar orbit and remained for about six days before boosting back toward Earth. The Orion capsule separated from its service module, re-entered the atmosphere for aerobraking, and splashed down under parachutes.[8]
Artemis 2 (2024) is planned to be the first crewed test flight of SLS and the Orion spacecraft.[9] The four crew members will perform extensive testing in Earth orbit, and Orion will then be boosted into a free-return trajectory around the Moon, which will return Orion back to Earth for re-entry and splashdown. Launch is scheduled no earlier than late November 2024.[10]
Artemis 3 (2025) is planned to be the first crewed lunar landing.[9] The mission depends on a support mission to place a Starship Human Landing System (HLS) in place in a near-rectilinear halo orbit (NRHO) of the Moon prior to the launch of SLS/Orion. After Starship HLS reaches NRHO, SLS/Orion will send the Orion spacecraft with a crew of four, which is intended to include the first woman and the first person of color to land on the Moon, to rendezvous and dock with HLS.Template:Efn Two astronauts will transfer to HLS, which will descend to the lunar surface and spend about 6.5 days on the surface. The astronauts will perform at least two EVAs on the surface before the HLS ascends to return them to a rendezvous with Orion. Orion will return the four astronauts to Earth. Launch is scheduled no earlier than December 2025.[11][12]
Artemis 4 (2028) is planned to be the second crewed lunar landing mission. Orion and an upgraded Starship HLS will dock with the Lunar Gateway station in NRHO prior to the landing. A prior support mission will deliver the first two gateway modules to NRHO. The extra power of this mission's SLS Block 1B will allow it to deliver the I-HAB gateway module for connection to the Gateway. Launch is scheduled no earlier than September 2028.[11][13]
Artemis 5 (2029) is planned to be the third crewed lunar landing, which will deliver four astronauts to the Gateway Space Station. The mission will deliver the European Space Agency's ESPRIT refueling and communications module and a Canadarm2 for the Gateway. Also delivered will be NASA's Lunar Terrain Vehicle. Launch is scheduled no earlier than September 2029. The mission will also be the first to use Blue Origin's Blue Moon lander to bring astronauts down to the Moon's surface.
Support missions
Support missions include robotic landers, delivery of Gateway modules, Gateway logistics, delivery of the HLS, and delivery of elements of the Moon base. Most of these missions are executed under NASA contracts to commercial providers.
Under the Commercial Lunar Payload Services (CLPS) program, several robotic landers will deliver scientific instruments and robotic rovers to the lunar surface after Artemis 1. Additional CLPS missions are planned throughout the Artemis program to deliver payloads to the Moon base. These include habitat modules and rovers in support of crewed missions.
A Human Landing System (HLS) is a spacecraft that can convey crew members from NRHO to the lunar surface, support them on the surface, and return them to NRHO. Each crewed landing needs one HLS, although some or all of the spacecraft may be reusable. Each HLS must be launched from Earth and delivered to NRHO in one or more launches. The initial commercial contract was awarded to SpaceX for two Starship HLS missions, one uncrewed and one crewed as part of Artemis 3. These two missions each require one HLS launch and multiple fueling launches, all on SpaceX Starship launchers. Template:As of, NASA has also exercised an option under the initial contract to commission an upgraded Starship HLS for Artemis 4 and a separate contract to Blue Origin to develop a third crewed lunar lander, which will make its first crewed flight as part of the Artemis 5 mission.
The first two Gateway modules (PPE and HALO) will be delivered to NRHO in a single launch using a Falcon Heavy launcher. Originally planned to be available prior to Artemis 3, as of 2021 it is planned for availability before Artemis 4.
The Gateway will be resupplied and supported by launches of Dragon XL spacecraft launched by Falcon Heavy. Each Dragon XL will remain attached to Gateway for up to six months. the Dragon XLs will not return to Earth, but will be disposed of, probably by deliberate crashes on the lunar surface.
History
Early history
The Artemis program incorporates several major components of previously canceled NASA programs and missions, including the Constellation program and the Asteroid Redirect Mission. Originally legislated by the NASA Authorization Act of 2005, Constellation included the development of Ares I, Ares V, and the Orion Crew Exploration Vehicle. The program ran from the early 2000s until 2010.[14]
In May 2009, President Barack Obama established the Augustine Committee to take into account several objectives including support for the International Space Station, development of missions beyond low Earth orbit (including the Moon, Mars, and near-Earth objects), and utilization of the commercial space industry within defined budget limits.[15] The committee concluded that the Constellation program was massively underfunded and that a 2020 Moon landing was impossible. Constellation was subsequently put on hold.[16]
On 15 April 2010, Obama spoke at the Kennedy Space Center, announcing the administration's plans for NASA and cancelling the non-Orion elements of Constellation on the premise that the program had become nonviable.[17] He instead proposed US$6 billion in additional funding and called for development of a new heavy-lift rocket program to be ready for construction by 2015 with crewed missions to Mars orbit by the mid-2030s.[18]
On 11 October 2010, Obama signed into law the NASA Authorization Act of 2010, which included requirements for the immediate development of the Space Launch System as a follow-on launch vehicle to the Space Shuttle, and continued development of a Crew Exploration Vehicle to be capable of supporting missions beyond low Earth orbit starting in 2016, while making use of the workforce, assets, and capabilities of the Space Shuttle program, Constellation program, and other NASA programs. The law also invested in space technologies and robotics capabilities tied to the overall space exploration framework, ensured continued support for Commercial Orbital Transportation Services, Commercial Resupply Services, and expanded the Commercial Crew Development program.[19]
On 30 June 2017, President Donald Trump signed an executive order to re-establish the National Space Council, chaired by Vice-President Mike Pence. The Trump administration's first budget request kept Obama-era human spaceflight programs in place: Commercial Resupply Services, Commercial Crew Development, the Space Launch System, and the Orion spacecraft for deep space missions, while reducing Earth science research and calling for the elimination of NASA's education office.[20]
Redefinition and naming as Artemis
On 11 December 2017, President Trump signed Space Policy Directive 1, a change in national space policy that provides for a U.S.-led, integrated program with private sector partners for a human return to the Moon, followed by missions to Mars and beyond. The policy calls for the NASA administrator to "lead an innovative and sustainable program of exploration with commercial and international partners to enable human expansion across the Solar System and to bring back to Earth new knowledge and opportunities". The effort intends to more effectively organize government, private industry, and international efforts toward returning humans to the Moon, and laying the foundation of eventual human exploration of Mars.[21] Space Policy Directive 1 authorized the lunar-focused campaign. The campaign (later named Artemis) draws upon legacy US spacecraft programs including the Orion space capsule, the Lunar Gateway space station, Commercial Lunar Payload Services, and also creates entirely new programs such as the Human Landing System. The in-development Space Launch System is expected to serve as the primary launch vehicle for Orion, while commercial launch vehicles will launch various other elements of the program.[22]
On 26 March 2019, Vice President Mike Pence announced that NASA's Moon landing goal would be accelerated by four years with a planned landing in 2024.[23] On 14 May 2019, NASA Administrator Jim Bridenstine announced that the new program would be named Artemis, after the goddess of the Moon in Greek mythology who is the twin sister of Apollo.[22][24] Despite the immediate new goals, Mars missions by the 2030s were still intended Template:Asof.[21]
In mid-2019, NASA requested US$1.6 billion in additional funding for Artemis for fiscal year 2020,[25] while the Senate Appropriations Committee requested from NASA a five-year budget profile[26] which is needed for evaluation and approval by Congress.[27][28]
In February 2020, the White House requested a funding increase of 12% to cover the Artemis program as part of its fiscal year 2021 budget. The total budget would have been US$25.2 billion per year with US$3.7 billion dedicated towards a Human Landing System. NASA Chief Financial Officer Jeff DeWit said he thought the agency has "a very good shot" to get this budget through Congress despite Democratic concerns around the program.[29] However, in July 2020 the House Appropriations Committee rejected the White House's requested funding increase.[30] The bill proposed in the House dedicated only US$700 million towards the Human Landing System, 81% (US$3 billion) short of the requested amount.[31]
In April 2020, NASA awarded funding to Blue Origin, Dynetics, and SpaceX for competing 10-month-long preliminary design studies for the HLS.[32][33][34]
Throughout February 2021, Acting Administrator of NASA Steve Jurczyk reiterated those budget concerns when asked about the project's schedule,[35][36] clarifying that "The 2024 lunar landing goal may no longer be a realistic target [...]".[37]
On 4 February 2021, the Biden Administration endorsed the Artemis program.[38] More specifically, White House Press Secretary Jen Psaki expressed the Biden administration's "support [for] this effort and endeavor".[39][40][41]
On 16 April 2021, NASA contracted SpaceX to develop, manufacture, and fly two lunar landing flights with the Starship HLS lunar lander.[42] Blue Origin and Dynetics protested the award to the GAO on 26 April.[43][44] After the GAO rejected the protests,[45] Blue Origin sued NASA over the award,[46][47] and NASA agreed to stop work on the contract until 1 November 2021 as the lawsuit proceeded. The judge dismissed the suit on 4 November 2021 and NASA resumed work with SpaceX.[48]
On 25 September 2021, NASA released its first digital, interactive graphic novel in celebration of National Comic Book Day. "First Woman: NASA's Promise for Humanity" is the fictional story of Callie Rodriguez, the first woman to explore the Moon.[49]
On 15 November 2021, an audit of NASA's Office of Inspector General estimated the true cost of the Artemis program at about $93 billion until 2025.[50]
In addition to the initial SpaceX contract, NASA awarded two rounds of separate contracts in May 2019[51] and September 2021,[52] on aspects of the HLS to encourage alternative designs, separately from the initial HLS development effort. It announced in March 2022 that it was developing new sustainability rules and pursuing both a Starship HLS upgrade (an option under the initial SpaceX contract) and new competing alternative designs. These came after criticism from members of Congress over lack of redundancy and competition, and led NASA to ask for additional support.[53][54]
Launch
Template:More Artemis 1 was originally scheduled for late 2016, and as delays accrued, eventually for late 2021, but the launch date was pushed back to 29 August 2022.[55] Engine sensor problems caused a delay on that date; the next launch window was September 3.[56] A fuel supply line leak in a quick disconnect arm on a ground tail service mast caused a further delay to a period between 23 September and 4 October.[57][58][59] While the leak was partially repaired to a satisfactory condition, weather delays due to Hurricane Ian forced NASA managers to begin preparing for the stack's rollback to the Vehicle Assembly Building and call off the September–early October launch window.[60][61][62]
In October 2022, NASA launch managers decided on a new launch date of 14 November, with backup options for 16 November and 19 November.[63] In early November, NASA launch managers ruled out the 14 November option and made preparations to secure the SLS at the pad for Hurricane Nicole, after which launch was planned for 16 November.[64][65]
On 16 November 2022, at 01:47:44 EST (06:47:44 UTC), Artemis 1 successfully launched from the Kennedy Space Center.[66]
Artemis 1 was completed at 09:40 PST (17:40 UTC) on 11 December 2022, when the Orion spacecraft splashed down in the Pacific Ocean, west of Baja California, after a record-breaking mission, which saw Artemis travel more than 1.4 million miles on a path around the Moon before returning safely to Earth. The splashdown occurred 50 years to the day since NASA's Apollo 17 Moon landing; the last astronaut mission to touch down on the lunar surface.[67]
Supporting programs
Implementation of the Artemis program will require additional programs, projects, and commercial launchers to support the construction of the Gateway, launch resupply missions to the station, and deploy numerous robotic spacecraft and instruments to the lunar surface.[68] Several precursor robotic missions are being coordinated through the Commercial Lunar Payload Services (CLPS) program, which is dedicated to scouting and characterization of lunar resources as well as testing principles for in-situ resource utilization.[68][69]
Commercial Lunar Payload Services
In March 2018, NASA established the Commercial Lunar Payload Services (CLPS) program with the aim of sending small robotic landers and rovers mostly to the lunar south pole region as a precursor to and in support of crewed missions.[69][70][71] The main goals include scouting of lunar resources, in situ resource utilization (ISRU) feasibility testing, and lunar science.[72] NASA is awarding commercial providers indefinite delivery/indefinite quantity contracts to develop and fly lunar landers with scientific payloads.[73] The first phase considered proposals capable of delivering at least Template:Cvt of payload by the end of 2021.[73] Proposals for mid-sized landers capable of delivering between Template:Cvt and Template:Cvt of cargo were planned to also be considered for launch beyond 2021.[74]
In November 2018, NASA announced the first nine companies that were qualified to bid on the CLPS transportation service contracts (see list below).[75] On 31 May 2019, three of those were awarded lander contracts: Astrobotic Technology, Intuitive Machines, and OrbitBeyond.[76] On 29 July 2019, NASA announced that it had granted OrbitBeyond's request to be released from obligations under the contract citing "internal corporate challenges".[77]
The first twelve payloads and experiments from NASA centers were announced on 21 February 2019.[78] On 1 July 2019, NASA announced the selection of twelve additional payloads, provided by universities and industry. Seven of these are scientific investigations while five are technology demonstrations.[79]
The Lunar Surface Instrument and Technology Payloads (LSITP) program was soliciting payloads in 2019 that do not require significant additional development. They will include technology demonstrators to advance lunar science or the commercial development of the Moon.[80][81]
In November 2019, NASA added five contractors to the group of companies who are eligible to bid to send large payloads to the surface of the Moon under the CLPS program: Blue Origin, Ceres Robotics, Sierra Nevada Corporation, SpaceX, and Tyvak Nano-Satellite Systems.[82][83]
In April 2020, NASA selected Masten Space Systems for a follow-on CLPS delivery of cargo to the Moon in 2022.[84][85] On 23 June 2021, Masten Space Systems announced it was delayed until November 2023. Dave Masten, the founder and chief technology officer, blamed the delay on the COVID pandemic and industry-wide supply chain issues.[86]
In February 2021, NASA selected Firefly Aerospace for a CLPS launch to Mare Crisium in mid-2023.[87][88]
VIPER
The VIPER (Volatiles Investigating Polar Exploration Rover) is a lunar rover by NASA planned to be delivered to the surface of the Moon in November 2024.[89] The rover will be tasked with prospecting for lunar resources in permanently shadowed areas in the lunar south pole region, especially by mapping the distribution and concentration of water ice. The mission builds on a previous NASA rover concept called Resource Prospector, which was cancelled in 2018.[90]
The VIPER rover is part of the Lunar Discovery and Exploration Program managed by the Science Mission Directorate at NASA Headquarters, and it is meant to support the crewed Artemis program.[91] NASA's Ames Research Center is managing the rover project. The hardware for the rover is being designed by the Johnson Space Center, while the instruments are provided by Ames Research Center, Kennedy Space Center, and Honeybee Robotics.[91] Template:Asof, the estimated cost of the mission is US$433.5 million.[92]
The VIPER rover will operate near the lunar south pole at Nobile Crater. VIPER is planned to travel several kilometers, collecting data on different kinds of soil environments affected by light and temperature — those in complete darkness, occasional light, and in constant sunlight. Once it enters a permanently shadowed location, it will operate on battery power alone and will not be able to recharge them until it drives to a sunlit area. Its total operation time will be approximately 100 Earth days.
Both the launcher and the lander to be used will be competitively provided through the Commercial Lunar Payload Services (CLPS) contractors, with Astrobotic delivering the Griffin lander and SpaceX providing the Falcon Heavy launch vehicle.[93]
| Qualification date | Company | Proposed services | Contract award | |
|---|---|---|---|---|
| Date | amount US$ millions | |||
| 29 November 2018 |
Astrobotic Technology | Peregrine lander | Template:Yes | 79.5[76] |
| Deep Space Systems | Rover; design and development services | [75] | ||
| Draper Laboratory | Series 2 lander | Template:Yes | 73[94] | |
| Firefly Aerospace | Blue Ghost lander | Template:Yes | 93.3[87] | |
| Intuitive Machines | Nova-C lander | Template:Yes | 77[76] | |
| Lockheed Martin Space | McCandless Lunar Lander | [75] | ||
| Masten Space Systems | XL-1 lander | Template:Yes | 75.9[84][75] | |
| Moon Express | MX-1, MX-2, MX-5, MX-9 landers; sample return. | [75] | ||
| OrbitBeyond | Z-01 and Z-02 landers | Template:Yes | 97 [76]Template:Efn | |
| 18 November 2019 |
Blue Origin | Blue Moon lander | [83] | |
| Ceres Robotics | [83] | |||
| Sierra Nevada Corporation | [83] | |||
| SpaceX | Starship cargo lander | [83] | ||
| Tyvak Nano-Satellite Systems | [83] | |||
International contractors
| Name | Country | Location | Program element | Services performed |
|---|---|---|---|---|
| Ispace | Template:Flag | Tokyo | Lunar in situ resource utilization | Hakuto-R lunar regolith transfer[95] |
| Ispace Europe | Template:Flag | Luxembourg City | Lunar in situ resource utilization | Lunar regolith transfer[96] |
| Toyota | Template:Flag | Toyota City | Crewed lunar rover | Lunar Cruiser[97] |
| ArianeGroup | Template:Flag | Gironde | Orion | Propulsion system components[98] |
| ESAB | Template:Flag | Laxå Municipality | Space Launch System | Fuel tank structures[99] |
| MT Aerospace | Template:Flag | Augsburg | Space Launch System | Cryogenic core stage dome core panels[100] |
| Schaeffler Aerospace Germany GmbH & Co. KG | Template:Flag | Schweinfurt | Space Launch System | Cronidur 30 in SLS propulsion systems, components for Orion spacecraft[101] |
| Magna Steyr | Template:Flag | Graz | Space Launch System | Pressurization lines for the SLS core stage[102] |
| Airbus | Template:Flag | Bremen | Orion | Orion European Service Module[103] |
| 7 Sisters Consortium (includes Fleet Space Technologies,[104] OZ Minerals, University of Adelaide,[105] University of New South Wales, and Unearthed) | Template:Flag | Adelaide, Perth, Sydney | Lunar exploration support | Companion program to Artemis to provide nanosatellite solutions and exploration support for crewed Artemis missions.[106] |
| MDA | Template:Flag | Brampton, Ontario | Lunar Gateway | Canadarm 3[107] |
Artemis Accords
On 5 May 2020, Reuters reported that the Trump administration was drafting a new international agreement outlining the laws for mining on the Moon.[108] NASA Administrator Jim Bridenstine officially announced the Artemis Accords on 15 May 2020. It consists of a series of bilateral agreements between the governments of participating nations in the Artemis program "grounded in the Outer Space Treaty of 1967".[109][110] The Artemis Accords have been criticized by some American researchers as "a concerted, strategic effort to redirect international space cooperation in favor of short-term U.S. commercial interests".[111] The Accords were signed by the United States, Australia, Canada, Japan, Luxembourg, Italy, the United Kingdom, and the United Arab Emirates on 13 October 2020,[111] and later signed by Ukraine.[112][113] In May 2021, South Korea joined as the 10th signatory state of the Artemis Accords,[114] with New Zealand following later the same month. Brazil became the 12th signatory country in June 2021. Poland became the 13th signatory country in October 2021. Mexico signed in December 2021. Israel signed in January 2022, Romania and Singapore in March 2022,[115] Colombia signed in May 2022,[116] France signed in June 2022,[117] followed by Saudi Arabia in July 2022.[118] In June 2023, India signed the Accords.[119] Argentina signed in July 2023.[120]
Exploration Ground Systems (EGS)
Template:Main The Exploration Ground Systems (EGS) Program is one of three NASA programs based at NASA's Kennedy Space Center in Florida. EGS was established to develop and operate the systems and facilities necessary to process and launch rockets and spacecraft during assembly, transport, and launch.[121] EGS is preparing the infrastructure to support NASA's Space Launch System (SLS) rocket and its payloads, such as the Orion spacecraft for Artemis 1.[122][123]
Gateway Logistics Services
Template:Main The Lunar Gateway is a station set to be constructed in lunar orbit, and the Gateway Logistics Services program will provide cargo and other supplies to the station, even when crews are not present.[124] Template:As of, only SpaceX's supply vehicle, known as Dragon XL, is planned to supply the Gateway. Dragon XL is a version of the Dragon spacecraft, to be launched by the Falcon Heavy. Unlike Dragon 2 and its predecessor, it is intended to be an expendable spacecraft.
Supporting Earth-launch vehicles
As of the early mission concepts outlined by NASA in May 2020 and refined by the HLS contract award in July 2021, the primary Earth-launch vehicles planned to support the Artemis program will include the NASA Space Launch System for the Orion vehicle, the Falcon Heavy for various components of the Lunar Gateway,[125] and the Starship HLS configuration for the eventual delivery of the HLS vehicle. Other standard SpaceX Starships may also possibly be used later on to meet other later and yet to be determined crew/ cargo handling mission needs.[126] Additional launch vehicles will also be employed later on for the various CLPS cargo services. The European Ariane 6 has also been proposed to be part of the program in July 2019.[127]
The Power and Propulsion Element (PPE) module and the Habitation and Logistics Outpost (HALO) of the Gateway, which were previously planned for the SLS Block 1B,[128] will now fly together on a Falcon Heavy in November 2024.[129][130] The Gateway will be supported and resupplied by approximately 28 commercial cargo missions launched by undetermined commercial launch vehicles.[131] The Gateway Logistics Services (GLS) will be in charge of the resupply missions.[131] GLS has also contracted for the construction of a resupply vehicle, Dragon XL, capable of remaining docked to the Gateway for one year of operations, providing and generating its own power while docked, and capable of autonomous disposal at the end of its mission.[131][132][133]
In May 2019, the plan was for components of a crewed lunar lander to be deployed to the Gateway on commercial launchers before the arrival of the first crewed mission, Artemis 3.[134] An alternative approach where the HLS and Orion dock together directly was discussed.[135][136]
As late as mid-2019, NASA considered use of Delta IV Heavy and Falcon Heavy to launch a crewed Orion mission given SLS delays.[137] Given the complexity of conversion to a different vehicle, the agency ultimately decided to use only the SLS to launch astronauts.[138]
| Launch vehicle |
Missions | Payload | Estimated cost per launch |
First launch | |
|---|---|---|---|---|---|
| LEO | TLI | ||||
| SLS Block 1 | Crew transportation | 95 t | 27 t | US$2 billion | 2022[65] |
| SLS Block 1B | Crew transportation, I-HAB Gateway Module |
105 t | 42 t | US$2 billion | In development (2028) |
| SLS Block 2 | Crew transportation, Heavy payloads |
130 t | 45 t | US$2 billion | In development (after 2029) |
| Falcon Heavy | Dragon XL launches, two Gateway modules, VIPER |
63.8 t | US$150 million (expendable)[139] |
2018 | |
| Vulcan Centaur | CLPS missions | 27.2 t | 12.1 t | US$82–200 million | In development (2023) |
| Falcon 9 | CLPS missions | 22.8 t | US$62 million[140] | 2010 | |
| Electron | CAPSTONE | 0.3 t | US$7.5 million[141][142] | 2017 | |
| Starship | Starship HLS, heavy CLPS payloads |
150 t | 150 tTemplate:Efn | US$2 million (goal)[143] | Under construction (2023) |
| Ariane 6 | EL3 | 21.6 t | €115 million[144][145] | In development (2024) | |
Space Launch System
The Space Launch System (SLS) is a United States super heavy-lift expendable launch vehicle, which has been under development since its announcement in 2011. The SLS is the main Earth-launch vehicle of the Artemis lunar program, Template:Asof. NASA is required by the U.S. Congress to utilize SLS Block 1, which will be powerful enough to lift a payload of Template:Cvt to low Earth orbit (LEO), and will launch Artemis 1, 2, and 3.[146][147][148] Starting in 2028, Block 1B is intended to debut the Exploration Upper Stage (EUS) and launch the notional Artemis 4-7.[149][150] Starting in 2029, Block 2 is planned to replace the initial Shuttle-derived boosters with advanced boosters and would have a LEO capability of more than Template:Cvt, again as required by Congress.[151] Block 2 is intended to enable crewed launches to Mars.[152] The SLS will launch the Orion spacecraft and use the ground operations capabilities and launch facilities at NASA's Kennedy Space Center in Florida.
In March 2019, the Trump Administration released its Fiscal Year 2020 Budget Request for NASA. This budget did not initially include any money for the Block 1B and Block 2 variants of SLS, but later a request for a budget increase of $1.6 billion towards SLS, Orion, and crewed landers was made. Block 1B is currently intended to debut on Artemis 4 and will be used mainly for co-manifested crew transfers and logistics rather than constructing the Gateway as initially planned. An uncrewed Block 1B was planned to launch the Lunar Surface Asset in 2028, the first lunar outpost of the Artemis program, but now that launch has been moved to a commercial launcher.[153] Block 2 development will most likely start in the late 2020s after NASA is regularly visiting the lunar surface and shifts focus towards Mars.[154]
In October 2019, NASA authorized Boeing to purchase materials in bulk for more SLS rockets ahead of the announcement of a new contract. The contract was expected to support up to ten core stages and eight Exploration Upper Stages for the SLS 1B to transfer heavy payloads of up to 40 metric tons on a lunar trajectory.[155]
SpaceX Starship
Template:Main The SpaceX Starship system is a fully-reusable super heavy-lift Earth-launch system which is under development. It consists of a first-stage booster named Super-Heavy and a second-stage space vehicle which is generally named Starship and which will have several variants. A Starship HLS mission will use three variants: a tanker, a propellant depot, and the Starship HLS itself which will be designed only for lunar landings and takeoffs, and not for Earth landings. Some variants will be able to return to Earth for reuse.
The second-stage Starships are fully self-contained spacecraft, complete with their own propulsion systems. The combined Starship system using standard Starship variants for its second-stage is planned to launch crews and cargo, which may then be used to support the various developmental needs of the Artemis program, and also to support the needs of other NASA and SpaceX programs.
The SpaceX Starship is also qualified to be bid for Commercial Lunar Payload Services (CLPS) launches, and in 2021 was the winning NASA bid for a crewed lunar landing.[156][157][158]
Falcon Heavy
Template:Main The SpaceX Falcon Heavy is a partially reusable heavy-lift launcher. It will be used to launch the first two Gateway modules into NRHO.[159] It will also be used to launch the Dragon XL spacecraft on supply missions to Gateway,[160] and it is qualified to be bid for other launches under the CLPS program. It was selected under CLPS to launch the VIPER mission.
CLPS launchers
Under the CLPS (Commercial Lunar Payload Service) program, qualified CLPS vendors can use any launcher that meets their mission requirements.
Space vehicles
Orion
Orion is a class of partially reusable spacecraft to be used in the Artemis program. The spacecraft consists of a Crew Module (CM) space capsule designed by Lockheed Martin and the European Service Module (ESM) manufactured by Airbus Defence and Space. Capable of supporting a crew of six beyond low Earth orbit, Orion is equipped with solar panels, an automated docking system, and glass cockpit interfaces modeled after those used in the Boeing 787 Dreamliner. It has a single AJ10 engine for primary propulsion, and others including reaction control system engines. Although designed to be compatible with other launch vehicles, Orion is primarily intended to launch atop a Space Launch System (SLS) rocket, with a tower launch escape system.
Orion was originally conceived by Lockheed Martin as a proposal for the Crew Exploration Vehicle (CEV) to be used in NASA's Constellation program. Lockheed Martin's proposal defeated a competing proposal by Northrop Grumman, and was selected by NASA in 2006 to be the CEV. Originally designed with a service module featuring a new "Orion Main Engine" and a pair of circular solar panels, the spacecraft was to be launched atop the Ares I rocket. Following the cancellation of the Constellation program in 2010, Orion was heavily redesigned for use in NASA's Journey to Mars initiative; later named Moon to Mars. The SLS replaced the Ares I as Orion's primary launch vehicle, and the service module was replaced with a design based on the European Space Agency's Automated Transfer Vehicle. A development version of Orion's CM was launched in 2014 during Exploration Flight Test-1, while at least four test articles were produced. By 2022, three flight-worthy Orion crew modules have been built, with an additional one ordered, for use in the Artemis program; the first of these was due to be launched on 30 November 2020, however Artemis 1 did not launch until 16 November 2022. It was reported that NASA and Lockheed Martin had found a failure with a component in one of the Orion spacecraft's power data units but NASA later clarified that it did not expect the issue to affect the Artemis 1 launch date.
Dragon XL
Human Landing System (HLS)
The Human Landing System (HLS) is a critical component of the Artemis mission. This system transports crew from lunar orbit (the Gateway or an Orion spacecraft) to the lunar surface, acts as a lunar habitat, and then transports the crew back to lunar orbit. In 2021 SpaceX's Starship HLS program was awarded the winning NASA bid for the production of a manned lunar landing vehicle.[156] In May 2023, Blue Origin was selected as the second provider for lunar lander services.[161][162]
Early developmental history of the HLS vehicle
Template:Main Bidding for NASA's HLS lunar landing vehicle began in 2019. At that time, NASA elected to have the HLS designed and developed by commercial vendors. Eleven competing contracts were initially awarded in May 2019. In April 2020, NASA awarded three competing design contracts, and in April 2021, NASA selected the Starship HLS to proceed to development and production.
Separate from its early design and development program for its first HLS spacecraft, NASA retains multiple smaller contracts to study various elements of alternative HLS designs.
Starship HLS
The Starship Human Landing System (Starship HLS) was the winner selected by NASA for potential use for long-duration crewed lunar landings as part of NASA's Artemis program.[42][163]
Starship HLS is a variant of SpaceX's Starship spacecraft optimized to operate on and around the Moon. In contrast to the Starship spacecraft from which it derives, Starship HLS will never re-enter an atmosphere, so it does not have a heat shield or flight control surfaces. In contrast to other proposed HLS designs that used multiple stages, the entire spacecraft will land on the Moon and will then launch from the Moon. Like other Starship variants, Starship HLS has Raptor engines mounted at the tail as its primary propulsion system. However, when it is within "tens of meters" of the lunar surface during descent and ascent, it will use high-thrust meth/ox RCS thrusters located mid-body instead of the Raptors to avoid raising dust via plume impingement. A solar array located on the nose below the docking port provides electrical power. Elon Musk stated that Starship HLS would be able to deliver "potentially up to 200 tons" to the lunar surface.
Starship HLS would be launched to Earth orbit using the SpaceX Super Heavy booster, and would use a series of tanker spacecraft to refuel the Starship HLS vehicle in Earth orbit for lunar transit and lunar landing operations. Starship HLS would then boost itself to lunar orbit for rendezvous with Orion. In the mission concept, a NASA Orion spacecraft would carry a NASA crew to the lander, where they would depart and descend to the surface of the Moon. After lunar surface operations, Starship HLS would lift off from the lunar surface acting as a single-stage-to-orbit (SSTO) vehicle and return the crew to Orion.
Blue Origin HLS
Template:Main On May 19 2023, NASA announced an additional contract to Blue Origin to develop a second crewed lunar lander, which will make its first crewed flight as part of the Artemis 5 mission. Blue Moon is smaller than the SpaceX HLS lander, having only 20 tons of payload capacity. The lander is fueled with a combination of liquid hydrogen and liquid oxygen propellants.[164]
Lunar Gateway
NASA's Gateway is an in-development mini-space station in lunar orbit intended to serve as a solar-powered communication hub, science laboratory, short-term habitation module, and holding area for rovers and other robots.[165] While the project is led by NASA, the Gateway is meant to be developed, serviced, and utilized in collaboration with commercial and international partners: Canada (Canadian Space Agency) (CSA), Europe (European Space Agency) (ESA), and Japan (JAXA).
The Power and Propulsion Element (PPE) started development at the Jet Propulsion Laboratory during the now canceled Asteroid Redirect Mission (ARM). The original concept was a robotic, high performance solar electric spacecraft that would retrieve a multi-ton boulder from an asteroid and bring it to lunar orbit for study.[166] When ARM was canceled, the solar electric propulsion was repurposed for the Gateway.[167][168] The PPE will allow access to the entire lunar surface and act as a space tug for visiting craft.[169] It will also serve as the command and communications center of the Gateway.[170][171] The PPE is intended to have a mass of 8-9 tonnes and the capability to generate 50 kW[172] of solar electric power for its ion thrusters, which can be supplemented by chemical propulsion.[173]
The Habitation and Logistics Outpost (HALO),[174][175] also called the Minimal Habitation Module (MHM) and formerly known as the Utilization Module,[176] will be built by Northrop Grumman Innovation Systems (NGIS).[177][178] A single Falcon Heavy equipped with an extended fairing[179] will launch the PPE together with the HALO in November 2024.[129] The HALO is based on a Cygnus Cargo resupply module[177] to the outside of which radial docking ports, body mounted radiators (BMRs), batteries and communications antennae will be added. The HALO will be a scaled-down habitation module,[180] yet, it will feature a functional pressurized volume providing sufficient command, control, and data handling capabilities, energy storage and power distribution, thermal control, communications and tracking capabilities, two axial and up to two radial docking ports, stowage volume, environmental control and life support systems to augment the Orion spacecraft and support a crew of four for at least 30 days.[178]
In March 2020, Doug Loverro, NASA's associate administrator for human exploration and operations at that time, removed the Gateway construction from the 2024 critical path to clear up funding for the HLS. He stated that the PPE could face delays and that moving it back to 2026 would allow for a more refined vehicle. It is also worth noting that the international partners on the Gateway would not have their modules ready until 2026. It was made a requirement that all Human Landing System proposals would be capable of free flight without the Gateway.[181]
On 30 April 2020, a key to NASA's vision for a "sustainable" crew presence on or near the Moon, the Gateway station, was announced to be optional, rather than required, in mission planning. NASA officials originally hoped the Gateway would be in position near the Moon in time for the Artemis 3 mission in 2024, allowing elements of the lunar lander to be assembled, or aggregated, at the Gateway before the arrival of astronauts on an Orion crew capsule. Jim Bridenstine told Spaceflight Now, the Artemis 3 mission will no longer go through the Gateway, but NASA is not backing away from the program.[136]
In late October 2020, NASA and European Space Agency (ESA) finalized their agreement to collaborate in the Gateway program. ESA will provide a habitat module in partnership with JAXA (I-HAB) and a refueling module (ESPRIT). In return, Europe will have three flight opportunities to launch crew aboard the Orion crew capsule, which they will provide the service module for.[182][183]
Astronauts
On 10 January 2020, NASA's 22nd astronaut group, nicknamed the "Turtles", graduated and were assigned to the Artemis program. The group includes two Canadian Space Agency (CSA) astronauts. The group earned their nickname from the prior astronaut group, "The 8-Balls", as is a tradition dating back to "The Mercury Seven" in 1962 which subsequently provided the "Next Nine" with their nickname. They were given this name, for the most part, because of Hurricane Harvey. Some of the astronauts will fly on the Artemis missions to the Moon and may be part of the first crew to fly to Mars.[184]
Artemis team
On 9 December 2020, then-Vice President Mike Pence announced the first group of 18 astronauts (all American, including 9 male and 9 female from different backgrounds), the 1st Artemis team, who could be selected as astronauts of early missions of the Artemis program:[185]
- Joe Acaba
- Kayla Barron
- Raja Chari
- Matthew Dominick
- Victor Glover
- Warren Hoburg
- Jonny Kim
- Christina Koch
- Kjell Lindgren
- Nicole Mann
- Anne McClain
- Jessica Meir
- Jasmin Moghbeli
- Kathleen Rubins
- Frank Rubio
- Scott Tingle
- Jessica Watkins
- Stephanie Wilson
Chief Astronaut Reid Wiseman said in August 2022, however, that all 42 active members of the NASA Astronaut Corps, and the ten more training as NASA Astronaut Group 23, are eligible for Artemis 2 and later flights.[186]
Artemis 2 Crew
On 3 April 2023, NASA announced the astronauts who will be the crew of the Artemis 2 mission.[187][188]
| Name | Position | Group |
|---|---|---|
| Gregory R. Wiseman | Commander | NASA Astronaut Group 20 |
| Victor J. Glover | Pilot | NASA Astronaut Group 21 |
| Christina Koch | Mission Specialist | NASA Astronaut Group 21 |
| Jeremy Hansen | Mission Specialist | 2009 CSA Group |
Planned surface operations
Artemis Base Camp
The Artemis Base Camp is the proposed lunar base to be established at the end of the 2020s. The Base camp is to be located in the south pole region near the two adjacent Shackleton and de-Gerlache craters,[189] due to this area's wide variety of lunar geography and also due to the abundance of water ice that is believed to exist in the lunar soils of the crater floors. The environs of these craters fall under the guidelines of the Outer Space Treaty.[190][191]
Most probably it will be a site that has already been visited by prior robotic missions. It will consist of three main modules:
- The Surface Habitat (SH) module, which is the initial dwelling structure and home base for the residents of the Base.
- The Lunar Terrain Vehicle (LTV), which is an unpressurized rover cart for transporting suited astronauts around in the vicinity of the Base.
- The Pressurized Rover (PR), a pressurized vehicle complete with longer range habitation facilities, thus enabling multi-day and longer-range explorations tens of kilometers away from the Base.[192]
The Artemis Base Camp will support missions of up to two months and will be used to study technologies to use on Mars. The Base may be used regularly for decades to come through both Government and commercial programs.
Surface Habitat (SH) module
Most of the information about the Surface Habitat (SH) comes from studies and launch manifests which manifests include a reference to its launch. It will be commercially built and commercially launched in 2028 along with the Pressurized Vehicle (PV).[193] The SH was formerly referred to as the Artemis Surface Asset. Current launch plans show that landing it on the surface would be similar to the HLS. The Surface Habitat would be sent to the Gateway where it would then be attached to a descent stage and subsequently transported down to the lunar surface with a commercial launcher. It would utilize the same lunar transfer stage as used for the HLS. Other designs from 2019 see it being launched from an SLS Block 1B as a single unit and landing directly on the surface. It would then be hooked up to a surface power system launched by a CLPS mission and tested by the Artemis 6 crew.[190][194]
Lunar Terrain Vehicle (LTV)
NASA has specified its need for an LTV that has a cargo capacity of 800 kg, traversal distances of up to 20 km without battery recharging, continuous operations for 8 hours within a 24-hour period, the ability to survive the lunar night, and the ability to traverse grades as steep as +/- 20 degrees.[192]
Pressurized Rover (PR)
The Pressurized Rover (PR) is a large pressurized rover used to transport crews across large distances. NASA had developed multiple pressurized rovers including what was formerly called the Space Exploration Vehicle (SEV). This rover was built for the Constellation program and was fabricated and then tested. In the 2020 flight manifest it was later referred to as the "Mobile Habitat" suggesting it could fill a similar role to the ILREC Lunar Bus. It would be ready for the crew to use on the surface but could also be autonomously controlled from the Gateway or other locations.
Mark Kirasich, who is the acting director of NASA's Advanced Exploration Systems, has stated that the current plan is to partner with JAXA and Toyota to develop a closed cabin rover to support crews for up to 14 days (currently known as Lunar Cruiser). "It's very important to our leadership at the moment to involve JAXA in a major surface element", he said. "... The Japanese, and their auto industry, have a very strong interest in rover-type things. So there was an idea to — even though we have done a lot of work — to let the Japanese lead development of a pressurized rover. So right now, that's the direction we're heading in".
In regards to the PR, senior-lunar-scientist Clive Neal said "Under Constellation NASA had a sophisticated rover put together. It's pretty sad if it's never going to get to the Moon". However Neal also said that he understands the different mission objectives of the Constellation Program vs: those of the Artemis Program and the need of the Artemis Program to focus more on international collaboration.[190][195][196][197][198]
Resource prospecting and research programs
As of February 2020, a lunar stay during a Phase 1 Artemis mission will be about seven days and will have five extravehicular activities (EVA). A notional concept of operations (i.e., a hypothetical but possible plan) would include the following: On Day 1 of the stay, astronauts touchdown on the Moon but do not conduct an EVA. Instead, they prepare for the EVA scheduled for the next day in what is referred to as "The Road to EVA". On Day 2, the astronauts open the hatch on the Human Landing System and embark on EVA 1 which will be six hours long. It will include collecting a contingency sample, conducting public affairs activities, deploying the experiment package, and acquiring samples. The astronauts will stay close to the landing site on this first EVA. EVA 2 begins on day 3. The astronauts characterize and collect samples from permanently shadowed regions. Unlike the previous EVA, the astronauts will go farther from the landing site, up to Template:Convert, and up and down slopes of 20°. Day 4 will not include an EVA but Day 5 will. EVA 3 may include activities such as collecting samples from an ejecta blanket. Day 6 will have the two astronauts deploy a geotechnical instrument alongside an environmental monitoring station for in-situ resource utilization (ISRU). Day 7 will have the final and shortest EVA; this EVA will only last one hour rather than the others' six hours in duration from egress to ingress and mostly comprises preparations for the lunar liftoff, including jettisoning hardware. Once the final EVA is concluded, the astronauts will return into the Human Landing System and the vehicle will launch from the surface and join up with Orion/Gateway.[199]
Specialized lunar equipment development
Moon rover
Lunar light vehicle development
In February 2020, NASA released two requests for information regarding both a crewed and uncrewed unpressurized surface rover. The LTV would be propositioned by a CLPS vehicle before the Artemis 3 mission. It would be used to transport crews around the exploration site and serve a similar function to the Apollo Lunar Rover. In July 2020, NASA will move to formally establish a program office for the rover at the Johnson Space Center in Houston.[190]Template:Update inline
Artemis space suits
The Artemis program will make use of two types of space suit revealed in October 2019: the Exploration Extravehicular Mobility Unit (xEMU),[200] and the Orion Crew Survival System (OCSS).[201]
On 10 August 2021, a NASA Office of Inspector General audit reported a conclusion that the spacesuits would not be ready until April 2025 at the earliest, likely delaying the mission from the planned late 2024.[202] In response to the IG report, SpaceX indicated that they could provide the suits.[203]
Commercial spacesuits
NASA published a draft RFP to procure commercially-produced spacesuits in order to meet the 2024 schedule.[204] On 2 June 2022, NASA announced that commercially produced spacesuits would be developed by Axiom Space and Collins Aerospace.[205]
Template:AnchorArtemis flights
Orion testing
Template:Further A prototype version of the Orion Crew Module was launched on Exploration Flight Test-1 on 5 December 2014[206][207] atop a Delta IV Heavy rocket. Its reaction control system and other components were tested during two medium Earth orbits, reaching an apogee of Template:Cvt and crossing the Van Allen radiation belts before making a high-energy reentry at Template:Cvt.[208][209]
The Ascent Abort-2 test on 2 July 2019 tested the final iteration of the launch abort system on a Template:Cvt Orion boilerplate at maximum aerodynamic load,[210][211][212] using a custom Minotaur IV-derived launch vehicle built by Orbital ATK.[212][213]
Early Missions
Template:As of, all crewed Artemis missions will launch on the Space Launch System from Kennedy Space Center Launch Complex 39B. Current plans call for some supporting hardware to be launched on other vehicles and from other launch pads.
| Mission | Patch | Launch date | Crew | Launch vehicle | Lander vehicle | Duration | Goal | Status |
|---|---|---|---|---|---|---|---|---|
| Artemis 1 | 16 November 2022[64][65] | Template:N/A | SLS Block 1 | Template:N/A | 25 days[214] | Uncrewed lunar orbit and return | Template:Success | |
| Artemis 2 | To be designed by the crew | November 2024[10] | Template:Flagicon Reid Wiseman Template:Flagicon Victor Glover Template:Flagicon Christina Koch Template:Flagicon Jeremy Hansen |
SLS Block 1 | Template:N/A | ~10 days | 4-person lunar flyby | Template:Planned |
| Artemis 3 | To be designed by the crew | December 2025[11] | Template:TBA | SLS Block 1 | Starship HLS Option A [13] | ~30 days | 4-person lunar orbit with 2-person lunar landing.[215] | Template:Planned |
| Artemis 4 | To be designed by the crew | September 2028[11] | Template:TBA | SLS Block 1B | Starship HLS Option B [13] | ~30 days | 4-person lunar orbit, lunar landing,[13] and delivery of the I-HAB module to the Lunar Gateway.[216] | Template:Planned |
| Artemis 5 | To be designed by the crew | September 2029[11] | Template:TBA | SLS Block 1B | Blue Origin Blue Moon[217] | ~30 days | Lunar landing with the Lunar Terrain Vehicle and delivery of the ESPRIT Refueling Module to the Lunar Gateway, followed by a crewed lunar landing. | Template:Planned |
| Artemis 6 | To be designed by the crew | September 2030[11][218] | Template:TBA | SLS Block 1B | Template:TBA | ~30 days | Lunar landing with the delivery of the Gateway Airlock Module. | Template:Planned |
Proposed missions
In November 2021, plans to return humans to the Moon in 2024 were cancelled, and the Artemis 3 mission was delayed until at least 2025.[219] However, Template:As of, plans remain in place for crewed Artemis 4 through 9 missions to launch yearly starting from 2028,[11][220][153] testing in situ resource utilization and nuclear power on the lunar surface with a partially reusable lander. Artemis 7 would deliver in 2031[11] a crew of four astronauts to a Surface lunar outpost known as the Foundation Habitat along with the Mobile Habitat.[153] The Foundation Habitat would be launched back to back with the Mobile Habitat by an undetermined super heavy launcher[153] and would be used for extended crewed lunar surface missions.[153][221][222] Prior to each crewed Artemis mission, various payloads to the Gateway, such as refueling depots and expendable elements of the lunar lander, would be deployed by commercial launch vehicles.[223][222] The most updated manifest includes missions suggested in NASA's timelines that have not been designed or funded from Artemis 4-9.[220][224][153][193]
| Mission | Launch date | Crew | Launch vehicle | Duration | Goal (proposed) |
|---|---|---|---|---|---|
| Artemis 7 | September 2031[11] | Template:TBA | SLS Block 1B | ~30 days | Lunar landing with the delivery of the Habitable Mobility Platform (Lunar Cruiser) to surface |
| Artemis 8 | 2032[218] | Template:TBA | SLS Block 1B | ~60 days | Lunar landing with the delivery of lunar surface logistics and the Foundational Surface Habitat |
| Artemis 9 | 2033 | Template:TBA | SLS Block 2 | ~60 days | Lunar landing with the delivery of lunar surface logistics |
| Artemis 10 | 2034 (planned) | Template:TBA | SLS Block 2 | <180 days | Expect a lunar landing, a long-term stay with the delivery of lunar surface logistics. |
| Artemis 11 | 2035 (planned) | Template:TBA | SLS Block 2 | ~365 days | Delivery of lunar surface base logistics and shift. |
Support missions
Artemis support missions are robotic missions flown through the CLPS program and Gateway program, and HLS demo and delivery missions.[153]
| Date Template:Efn | Mission objective | Mission name | Launch vehicle | Outcome |
|---|---|---|---|---|
| 28 June 2022[225] | NRHO Pathfinder mission CAPSTONE[226] | CAPSTONE | Electron | Template:Operational |
| 15 November 2023[227] | First launch of the Nova-C lunar lander by Intuitive Machines[125] | IM-1 | Falcon 9 | Template:Scheduled |
| Late 2023[228] | First launch of the Peregrine lunar lander by Astrobotic[229] | Peregrine Mission One | Vulcan Centaur[230] | Template:Planned |
| 2023[231] | ISRU tech demonstration converting lunar ice to H2O using Nova-C | PRIME-1[232] | Falcon 9[233] | Template:Planned |
| November 2024[89] | Delivery of NASA's VIPER rover on the Griffin lunar lander to the lunar surface by Astrobotic Technology[234] | VIPER | Falcon Heavy[235] | Template:Planned |
| November 2024[129] | Launch of the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) as an integrated assembly. First two Lunar Gateway modules. | Artemis support mission | Falcon Heavy | Template:Planned |
| Late 2024[236] | Starship HLS uncrewed HLS Demo landing mission | HLS Uncrewed Lunar Demo | Starship | Template:Planned |
| 2025[11] | Delivery of Starship HLS for Artemis 3 | HLS Crewed Lunar Demo | Starship | Template:Planned |
| 2027[11] | Lunar Surface Power Demo; Lunar Surface Scaled Construction Demo 1; ISRU Pilot Excavator; ISRU Subscale Demo | TO CT-1 | Commercial launch vehicle | Template:Planned |
| 2028[11] | Delivery of Starship HLS for Artemis 4 | Sustaining HLS Crewed Lunar Demo | Starship | Template:Planned |
| 2028[11] | TBD HLS uncrewed HLS Demo landing mission | TBD Sustaining HLS Uncrewed Lunar Demo | Commercial launch vehicle | Template:Planned |
| 2029[11] | Delivery of Blue Moon HLS for Artemis 5 | TBD Sustaining HLS Crewed Lunar Demo | New Glenn | Template:Planned |
| 2030[11] | Delivery of TBD HLS for Artemis 6 | TBD Sustaining HLS Services | Commercial launch vehicle | Template:Planned |
| 2030[11] | Lunar Surface Scaled Construction Demo 2; Autonomous Robotics Demo; Deployable Hopper 2; ISRU Subscale Demo 2 | TO CT-2 | Commercial launch vehicle | Template:Planned |
| 2030[11] | Fission Surface Power Demo | Artemis support mission | Commercial launch vehicle | Template:Planned |
| 2031[11] | Delivery of TBD HLS for Artemis 7 | TBD Sustaining HLS Services | Commercial launch vehicle | Template:Planned |
| 2032 | (Proposed) Moon landing support mission(s) for Artemis 8 | Artemis support mission | Commercial launch vehicle | Template:Varies |
Criticism
The Artemis program has received criticisms from several space professionals.
Mark Whittington, who is a contributor to The Hill and an author of several space exploration studies, stated in an article that the "lunar orbit project doesn't help us get back to the Moon".[237]
Aerospace engineer, author, and Mars Society founder Robert Zubrin has voiced his distaste for the Gateway which is part of the Artemis program as of 2027. He presented an alternative approach to a 2024 crewed lunar landing called "Moon Direct", a successor to his proposed Mars Direct. His vision phases out the SLS and Orion, replacing them with the SpaceX launch vehicles and SpaceX Dragon 2. It also proposes using a heavy ferry/lander that would be refueled on the lunar surface via in situ resource utilization and transfer the crew from LEO to the lunar surface. The concept bears a heavy resemblance to NASA's own Space Transportation System proposal from the 1970s.[238]
Apollo 11 astronaut Buzz Aldrin disagrees with NASA's current goals and priorities, including their plans for a lunar outpost. He also questioned the benefit of the idea to "send a crew to an intermediate point in space, pick up a lander there and go down". However, Aldrin expressed support for Robert Zubrin's "Moon Direct" concept which involves lunar landers traveling from Earth orbit to the lunar surface and back.[239]
House Authorization Bill of 2020
The leadership of the House Science Committee introduced a bipartisan NASA authorization bill on 24 January 2020 that would significantly alter NASA's current plans to return humans to the Moon and rather would focus on a Mars orbital mission in 2033. Bill H.R. 5666 would change the lunar landing date from 2024 to 2028 and put the program as a whole underneath a larger space exploration plan. The bill became stuck in the House Committee on Science, Space, and Technology, and there were no committee votes or further action for the remainder of the congressional term. Major proposed changes included:[240][241]
- Creation of a new Moon to Mars program office with a goal of landing humans on Mars "in a sustainable manner as soon as practicable"
- A 2028 target date for a lunar landing to allow the technology to mature
- A NASA developed expendable Human Landing System (HLS), something along the line of the Advanced Exploration Lander or the expendable Altair design
- Launching both the Orion and HLS on SLS 1B rockets rather than splitting them between SLS and a commercial vehicle
- The requirement of one uncrewed and one crewed test flight of the HLS before a lunar landing is attempted, something not currently required
- Once operational, the system would perform two lunar landings a year rather than one
- No base would be set up on the lunar surface rather, the missions would follow the "flag and footsteps" approach of Apollo
- Development of the Gateway as a separate program to test Mars transportation technologies and not be required for lunar operations
- ISRU technologies would be managed under a program separate from the Moon to Mars campaign and not be required for either mission
- International Space Station funding would be extended to 2030
Many of these changes, such as uncrewed HLS test flights[242] and the development of the Gateway as no longer essential to Artemis,[243] were implemented into the current timeline.
Gallery
-
Planned (outdated) missions of Artemis program
-
Phase 1 Gateway with an Orion and HLS docked on Artemis 3
-
Concept of surface operations
-
Artemis 1 planned flight path
See also
Template:Portal Template:Div col
- Template:Annotated link
- Chinese Lunar Exploration Program – Chinese crewed lunar program with international partners e.g. Russia.
- Template:Annotated link
- List of Artemis Astronauts
- Template:Annotated link
- Template:Annotated link
- First Lunar Outpost – Crewed lunar program proposal from the SEI
- Template:Annotated link
- Template:Annotated link
- NASA Astronaut Group 23
- Template:Annotated link
Notes
References
- ↑ International Cooperation in NASA’s Artemis I Program. US State Department(November 16, 2022). Retrieved July 15, 2023.
- ↑ About Canadarm3, Agency, Canadian Space. Canadian Space Agency(2020-06-26). Retrieved 2023-07-15.
- ↑ Headed to the moon: the Trailblazer program and NASA space act agreement. Department of Industry, Science, Energy and Resources(2021-10-13). Retrieved 8 August 2023.
- ↑ NASA: Artemis Accords. NASA. Retrieved 2023-06-26.
- ↑ Mexico joins Artemis Accords, Foust, Jeff. SpaceNews(2021-12-10). Retrieved 2022-08-28.
- ↑ NASA's management of the Artemis missions(15 November 2021). Retrieved 22 November 2021.
- ↑ NASA's Artemis program will return astronauts to the moon and give us the first female moonwalker, Davis, Jason. NBC News(June 11, 2019). Retrieved 2022-08-27.
- ↑ NASA will likely add a rendezvous test to the first piloted Orion space mission, Clark, Stephen. Spaceflight Now(18 May 2020). Retrieved 19 May 2020.
- ↑ 9.0 9.1 Artemis 1 and space communications. Qoqnoos Scientific Magazine({Template:Date).
- ↑ 10.0 10.1 NASA's Artemis 2 mission around Moon set for November 2024(7 March 2023). Retrieved 8 March 2023.
- ↑ 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 11.15 11.16 11.17 NASA planning to spend up to $1 billion on space station deorbit module, Foust, Jeff(13 March 2023). Retrieved 13 March 2023.
- ↑ NASA outlines plans for lunar lander development through commercial partnerships. SpaceNews(21 July 2019). Retrieved 17 July 2020.
- ↑ 13.0 13.1 13.2 13.3 Lunar landing restored for Artemis 4 mission, Foust, Jeff(30 October 2022). Retrieved 31 October 2022.
- ↑ NASA Stuck in Limbo as New Congress Takes Over, Moskowitz, Clara. Space.com(7 January 2011). Retrieved 19 October 2020.
- ↑ Template:Source-attribution
- ↑ Obama signs Nasa up to new future. BBC News(11 October 2010). Retrieved 30 September 2020.
- ↑ Template:Source-attribution
- ↑ Template:Source-attribution
- ↑ Template:Source-attribution
- ↑ Trump signs order reviving long-dormant National Space Council, Clark, Stephen. Spaceflight Now(30 June 2017). Retrieved 30 June 2017.
- ↑ 21.0 21.1 Template:Source-attribution
- ↑ 22.0 22.1 NASA administrator on new Moon plan: "We're doing this in a way that's never been done before", Grush, Loren. The Verge(17 May 2019). Retrieved 20 May 2019.
- ↑ NASA Names New Moon Landing Program Artemis After Apollo's Sister(14 May 2019). Retrieved 14 May 2019.
- ↑ For Artemis Mission to Moon, NASA Seeks to Add Billions to Budget. The New York Times(13 May 2019). Retrieved 21 July 2019.
- ↑ NASA boss pleads for steady moon mission funding. CBS News(17 July 2019). Retrieved 28 August 2019.
- ↑ Senate appropriators advance bill funding NASA despite uncertainties about Artemis costs. SpaceNews(27 September 2019). Retrieved 26 June 2022.
- ↑ Trump wants US$1.6 billion for a Moon mission and proposes to get it from college aid. Quartz(14 May 2019). Retrieved 14 May 2019.
- ↑ NASA reveals funding needed for Moon program, says it will be named Artemis, Berger, Eric. Ars Technica(14 May 2019). Retrieved 22 May 2019.
- ↑ NASA puts a price on a 2024 Moon landing — US$35 billion, Berger, Eric. Ars Technica(11 February 2020). Retrieved 11 February 2020.
- ↑ Template:Source-attribution
- ↑ House bill offers flat funding for NASA. SpaceNews(7 July 2020). Retrieved 30 September 2020.
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namednsf20200501 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedars20200430 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namednasapr20200430 - ↑ NASA has a lot to tackle this year as Biden takes charge. Here's what the agency's acting chief has to say., Bartels, Meghan. Space.com(5 February 2021). Retrieved 20 March 2021.
- ↑ NASA reassesses Trump's 2024 moon goal, Feldscher, Jacqueline. Politico(16 February 2021). Retrieved 20 March 2021.
- ↑ Acting NASA chief says 2024 Moon landing no longer a "realistic" target, Berger, Eric. Ars Technica(18 February 2021). Retrieved 20 March 2021.
- ↑ White House endorses Artemis program. SpaceNews(4 February 2021). Retrieved 29 April 2021.
- ↑ Press Briefing by Press Secretary Jen Psaki and National Security Advisor Jake Sullivan, February 4, 2021. whitehouse.gov(4 February 2021). Retrieved 19 March 2021.
- ↑ Artemis: Biden administration backs US Moon shot, Rincon, Paul. BBC News Online(5 February 2021). Retrieved 19 March 2021.
- ↑ The Biden administration has set out to dismantle Trump's legacy, except in one area: Space. The Washington Post(2 March 2021). Retrieved 19 March 2021.
- ↑ 42.0 42.1 Cite error: Invalid
<ref>tag; no text was provided for refs namedars20210416 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedsn20210426 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedsn20210427 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedsn20210730 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedverge20210816 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedcnbc20210816 - ↑ "Bezos' Blue Origin loses NASA lawsuit over SpaceX $2.9 billion lunar lander contract"(November 4, 2021). Retrieved November 4, 2021.
- ↑ "NASA Releases Interactive Graphic Novel "First Woman"" Template:Webarchive. NASA, September 25, 2021.
- ↑ Template:Cite report
- ↑ NASA awards US$45.5 million to 11 American companies to "advance human lunar landers". mlive.com(22 May 2019). Retrieved 24 March 2022.
- ↑ NASA Selects Five U.S. Companies to Mature Artemis Lander Concepts. NASA(14 September 2021). Retrieved 24 March 2022.
- ↑ NASA Provides Update to Astronaut Moon Lander Plans Under Artemis. NASA(23 March 2022). Retrieved 24 March 2022.
- ↑ NASA wants another moon lander for Artemis astronauts, not just SpaceX's Starship, Wall, Mike. Space.com(23 March 2022). Retrieved 24 March 2022.
- ↑ NASA's moon rocket rolls back to Vehicle Assembly Building for repairs, Clark, Stephen(26 April 2022). Retrieved 26 April 2022.
- ↑ Next Artemis 1 launch attempt set for Sept. 3, Foust, Jeff. SpaceNews(2022-08-31). Retrieved 2022-08-31.
- ↑ Second Artemis 1 launch attempt scrubbed, Foust, Jeff. SpaceNews(3 September 2022). Retrieved 4 September 2022.
- ↑ Artemis I Launch Attempt Scrubbed. NASA blog. NASA(3 September 2022). Retrieved 3 September 2022.
- ↑ NASA discusses path to SLS repairs as launch uncertainty looms for September, October, Gebhardt, Chris. NASASpaceflight(8 September 2022). Retrieved 8 September 2022.
- ↑ Artemis I Managers Wave Off Sept. 27 Launch, Preparing for Rollback – Artemis, Kraft, Rachel. NASA Blogs(24 September 2022). Retrieved 24 September 2022.
- ↑ NASA to Roll Artemis I Rocket and Spacecraft Back to VAB Tonight – Artemis. blogs.nasa.gov(26 September 2022). Retrieved 2022-09-27.
- ↑ SLS to roll back to VAB as hurricane approaches Florida, Foust, Jeff. SpaceNews(26 September 2022). Retrieved 27 September 2022.
- ↑ NASA Sets Date for Next Launch Attempt for Artemis I Moon Mission(12 October 2022). Retrieved 13 October 2022.
- ↑ 64.0 64.1 NASA's Artemis I mission delayed again as storm barrels toward launch site. CNN(November 8, 2022). Retrieved November 9, 2022.
- ↑ 65.0 65.1 65.2 Cite error: Invalid
<ref>tag; no text was provided for refs namednasa-20221108 - ↑ Lift off! Artemis Moon rocket launch kicks off new era of human exploration - NASA's Artemis I has entered Earth orbit. It will test a rocket and capsule that could return astronauts to the Moon after 50 years.. Nature({Template:Date).
- ↑ Splashdown! NASA's Orion Returns to Earth After Historic Moon Mission. www.nasa.gov.uk. NASA(11 December 2022). Retrieved 11 December 2022.
- ↑ 68.0 68.1 NASA aims for quick start to 2024 Moon landing via newly named Artemis Program, Burghardt, Thomas. NASASpaceFlight.com(14 May 2019). Retrieved 28 August 2019.
- ↑ 69.0 69.1 NASA taps three companies for commercial moon missions. CBS News(31 May 2019). Retrieved 28 August 2019.
- ↑ NASA awards contracts to three companies to land payloads on the moon. SpaceNews(31 May 2019). Retrieved 26 June 2022.
- ↑ NASA courts commercial options for Lunar Landers. NASASpaceFlight.com(19 March 2018). Retrieved 18 October 2018.
- ↑ Template:Source-attribution
- ↑ 73.0 73.1 NASA emphasizes commercial lunar lander plans with Resource Prospector cancellation, Foust, Jeff. SpaceNews(28 April 2018). Retrieved 18 October 2018.
- ↑ NASA to begin buying rides on commercial lunar landers by year's end, Werner, Debra. spacenews.com. SpaceNews(24 May 2018). Retrieved 18 October 2018.
- ↑ 75.0 75.1 75.2 75.3 75.4 Template:Source-attribution
- ↑ 76.0 76.1 76.2 76.3 NASA chooses three companies to send landers to the moon. upi.com. Retrieved 1 June 2019.
- ↑ Commercial lunar lander company terminates NASA contract. SpaceNews(30 July 2019). Retrieved 26 June 2022.
- ↑ NASA selects experiments to fly aboard commercial lunar landers, Richardson, Derek. Spaceflight Insider(26 February 2019). Retrieved 28 August 2019.
- ↑ Template:Source-attribution
- ↑ Template:Source-attribution
- ↑ Template:Source-attribution
- ↑ NASA partners with SpaceX, Blue Origin, and more to send large payloads to the Moon, Grush, Loren. The Verge(18 November 2019). Retrieved 11 December 2019.
- ↑ 83.0 83.1 83.2 83.3 83.4 83.5 Template:Source-attribution
- ↑ 84.0 84.1 NASA selects Masten Space Systems to deliver cargo to the Moon in 2022. Techcrunch. Retrieved 12 April 2020.
- ↑ Masten Space Systems Awarded $76M to Help NASA Deliver Lunar Sci-Tech Payloads - GovCon Wire(9 April 2020). Retrieved 3 May 2020.
- ↑ Masten delays first lunar lander mission, Foust, Jeff. SpaceNews(2021-06-23). Retrieved 2022-07-17.
- ↑ 87.0 87.1 Template:Cite press release
- ↑ Lunar Lander(1 February 2021). Retrieved 4 February 2021.
- ↑ 89.0 89.1 NASA Replans CLPS Delivery of VIPER to 2024 to Reduce Risk(18 July 2022). Retrieved 18 July 2022.
- ↑ Moon VIPER: NASA Wants to Send a Water-Sniffing Rover to the Lunar South Pole in 2022, Bartels, Meghan. Space.com(16 October 2019). Retrieved 10 December 2020.
- ↑ 91.0 91.1 Template:Source-attribution
- ↑ VIPER lunar rover mission cost increases. SpaceNews(3 March 2021). Retrieved 5 March 2021.
- ↑ Astrobotic selects Falcon Heavy to launch NASA's VIPER lunar rover, Foust, Jeff. SpaceNews(13 April 2021). Retrieved 13 April 2021.
- ↑ NASA Selects Draper to Fly Research to Far Side of Moon(July 21, 2022). Retrieved May 23, 2023.
- ↑ NASA Picks U.S., Japanese Companies for Lunar Soil Collection(December 3, 2020). Retrieved November 10, 2022.
- ↑ NASA Selects Companies to Collect Lunar Resources for Artemis, Potter, Sean. NASA(2020-12-03). Retrieved 2021-02-18.
- ↑ Meet 'Lunar Cruiser': Japan's big moon rover for astronauts gets a nickname, September 2020, Mike Wall 01. Space.com(September 2020). Retrieved 2021-02-18.
- ↑ Key Propulsion System Components To Be Delivered By ArianeGroup for Artemis 3 Moon Mission(September 28, 2020). Retrieved November 10, 2022.
- ↑ Boeing selects ESAB for space launch system project(September 10, 2013). Retrieved November 10, 2022.
- ↑ Boeing extends partnership with OHB's MT Aerospace(July 8, 2021). Retrieved November 10, 2022.
- ↑ Sky busters, Krone, Lars(April 2021). Retrieved November 10, 2022.
- ↑ Space Launch System Highlights. Nasa.gov(September 2016). Retrieved 26 June 2022.
- ↑ Orion European Service Module. Airbus(18 October 2021). Retrieved November 10, 2022.
- ↑ Fleet Space Technologies Shoot for the Moon and Mars(March 15, 2022).
- ↑ Scientists part of resource mission to the Moon(December 17, 2020). Retrieved November 10, 2022.
- ↑ NASA Artemis moon mission to be supported by Seven Sisters consortium(December 17, 2020). Retrieved November 10, 2022.
- ↑ About Canadarm3. Canadian Space Agency(August 22, 2022). Retrieved November 10, 2022.
- ↑ Exclusive: Trump administration drafting 'Artemis Accords' pact for moon mining. Reuters(6 May 2020). Retrieved 15 May 2020.
- ↑ NASA lays out 'Artemis Accords' for responsible Moon exploration(15 May 2020). Retrieved 16 May 2020.
- ↑ Template:Source-attribution
- ↑ 111.0 111.1 US and seven other countries sign NASA's Artemis Accords to set rules for exploring the Moon, Grush, Loren. The Verge(13 October 2020). Retrieved 13 October 2020.
- ↑ Україна стала дев'ятою країною, яка підписала Домовленості в рамках програми "Артеміда". nkau.gov.ua. Retrieved 15 November 2020.
- ↑ NASA Administrator Signs Statement of Intent with Brazil on Artemis Cooperation(14 December 2020). Retrieved 15 December 2020.
- ↑ Republic of Korea Joins List of Nations to Sign Artemis Accords, Potter, Sean. NASA(2021-05-27). Retrieved 27 May 2021.
- ↑ Republic of Singapore Signs the Artemis Accords. United States Department of State. Retrieved 2022-06-21.
- ↑ Colombia signs the Artemis Accords for peaceful space exploration, Howell, Elizabeth. Space.com(2022-05-12). Retrieved 2022-07-16.
- ↑ France Signs Artemis Accords as French Space Agency Marks Milestone, Potter, Sean. NASA(2022-06-07). Retrieved 2022-07-16.
- ↑ Saudi Arabia Signs Artemis Accords, Potter, Sean. NASA(2022-07-14). Retrieved 2022-07-16.
- ↑ India joins NASA's Artemis Accords for collaborative lunar exploration, Singh, Jagmeet. TechCrunch(2023-06-22). Retrieved 2023-06-26.
- ↑ NASA Welcomes Argentina as Newest Artemis Accords Signatory. NASA(2023-07-27). Retrieved 2023-08-09.
- ↑ Exploration Ground Systems. NASA(August 21, 2018). Retrieved October 10, 2018.
- ↑ Exploration Ground Systems Overview. NASA(June 20, 2018). Retrieved October 19, 2018.
- ↑ Exploration Ground Systems, Jacobs practice building SLS boosters in the VAB. NASASpaceFlight.com(April 17, 2018). Retrieved February 26, 2019.
- ↑ NASA issues call for proposals for Gateway logistics, Foust, Jeff. SpaceNews(2019-08-19). Retrieved 2022-12-11.
- ↑ 125.0 125.1 NASA picks three companies to attempt Moon landings in 2020 and 2021, Berger, Eric. Ars Technica(31 May 2019). Retrieved 17 December 2019.
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedcnbc20200430 - ↑ Airbus propose un remorqueur translunaire, Barensky, Stefan. Aerospatium(24 July 2019). Retrieved 10 January 2020.
- ↑ NASA updates Lunar Gateway plans, Sloss, Philip. NASASpaceFlight.com(11 September 2018). Retrieved 17 October 2018.
- ↑ 129.0 129.1 129.2 Template:Cite press release
- ↑ Template:Cite press release
- ↑ 131.0 131.1 131.2 NASA determining the best course for commercial Lunar Gateway resupply, Gebhardt, Chris. NASASpaceFlight.com(17 June 2019). Retrieved 28 August 2019.
- ↑ Template:Source-attribution
- ↑ Template:Source-attribution
- ↑ NASA Has a Full Plate of Lunar Missions Before Astronauts Can Return to Moon, Weitering, Hanneke. Space.com(23 May 2019). Retrieved 28 August 2019.
- ↑ Nelson: "Watch the Chinese", Smith, Marcia(26 May 2021). Retrieved 26 May 2021.
- ↑ 136.0 136.1 Blue Origin wins lion's share of NASA funding for human-rated lunar lander. spaceflightnow.com. Spaceflight Now(30 April 2020). Retrieved 30 April 2020.
- ↑ NASA considering flying Orion on commercial launch vehicles(March 13, 2019). Retrieved November 11, 2022.
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedverge20190718 - ↑ Elon Musk says the new SpaceX Falcon Heavy rocket crushes its competition on cost(February 12, 2018). Retrieved May 24, 2018.
- ↑ SpaceX targets 2021 commercial Starship launch(28 June 2019). Retrieved 10 September 2021.
- ↑ A Small Rocket Maker is Running a Different Kind of Space Race(3 February 2020). Retrieved 8 October 2020.
- ↑ Virginia has a rocket launch site, and it's about to grow with the most successful startup since SpaceX. The Washington Post(2 October 2020). Retrieved 8 October 2020.
- ↑ SpaceX's Starship May Fly for Just $2 Million Per Mission, Elon Musk Says(19 November 2019). Retrieved 19 June 2020.
- ↑ Europe Complains: SpaceX Rocket Prices Are Too Cheap to Beat. The Motley Fool(2 June 2018). Retrieved 12 May 2020.
- ↑ Ariane 6, un chantier européen pour rester dans la course spatiale. Le Monde.fr(1 December 2014). Retrieved 18 February 2015.
- ↑ SLS – Artemis. blogs.nasa.gov(29 July 2022). Retrieved 2022-12-14.
- ↑ First Flight With Crew Important Step on Long-Term Return to Moon, Hambleton, Kathryn. NASA(2018-08-27). Retrieved 2022-12-14.
- ↑ NASA Commits to Future Artemis Missions With More SLS Rocket Stages, Loff, Sarah. NASA(2019-10-15). Retrieved 2022-12-14.
- ↑ Space Launch System. aerospaceguide.net(26 June 2016). Retrieved 11 December 2019.
- ↑ NASA completes Exploration Upper Stage CDR, focuses new office on SLS Block 1B development, Sloss, Philip. NASASpaceFlight.com(2021-02-17). Retrieved 2022-12-14.
- ↑ Template:Source-attribution
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namednsf-20170406 - ↑ 153.0 153.1 153.2 153.3 153.4 153.5 153.6 Template:Source-attribution
- ↑ NASA's Space Launch System, Kyle, Ed. spacelaunchreport(16 May 2019). Retrieved 22 May 2019.
- ↑ Template:Source-attribution
- ↑ 156.0 156.1 As Artemis Moves Forward, NASA Picks SpaceX to Land Next Americans on Moon NASA. Apr 16, 2021. By Monica Witt. Retrieved 2023-04-16.
- ↑ SpaceX. SpaceX. Retrieved 2022-12-12.
- ↑ Starship Users Guide V1.0. SpaceX(March 2020).
- ↑ NASA plans to launch first two Gateway elements on same rocket(May 6, 2020). Retrieved 30 September 2020.
- ↑ SpaceX wins NASA commercial cargo contract for lunar Gateway(March 27, 2020). Retrieved March 27, 2020.
- ↑ NASA Selects Blue Origin as Second Artemis Lunar Lander Provider, O’Shea, Claire. NASA(2023-05-19). Retrieved 2023-05-19.
- ↑ Jeff Bezos' Blue Origin wins NASA contract to build astronaut lunar lander. Reuters(2023-05-19). Retrieved 2023-05-19.
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedNASAannouncementApril16 - ↑ NASA Selects Blue Origin as Second Artemis Lunar Lander Provider, O’Shea, Claire. NASA(2023-05-19). Retrieved 2023-05-20.
- ↑ Template:Source-attribution
- ↑ Template:Source-attribution
- ↑ NASA closing out Asteroid Redirect Mission. spacenews.com. SpaceNews(14 June 2017). Retrieved 30 May 2019.
- ↑ Template:Source-attribution
- ↑ NASA awards Artemis contract for lunar gateway power, propulsion. aerotechnews.com(25 May 2019). Retrieved 30 May 2019.
- ↑ Deep Space Gateway and Transport: Concepts for Mars, Moon Exploration Unveiled | Space Exploration. sci-news.com(4 April 2017). Retrieved 30 May 2019.
- ↑ NASA chooses Maxar to build keystone module for lunar Gateway station, Clark, Stephen. Spaceflight Now(24 May 2019). Retrieved 30 May 2019.
- ↑ NASA issues study contracts for Deep Space Gateway element, Foust, Jeff. SpaceNews(3 November 2017). Retrieved 11 December 2019.
- ↑ NASA finally sets goals, missions for SLS – eyes multi-step plan to Mars, Gebhardt, Chris. NASASpaceFlight.com(6 April 2017). Retrieved 9 April 2017.
- ↑ ISS partners endorse modified Gateway plans, Foust, Jeff. SpaceNews(30 August 2019). Retrieved 11 December 2019.
- ↑ Template:Source-attribution
- ↑ Humans in Deep Space. planetary.org. Retrieved 6 August 2019.
- ↑ 177.0 177.1 NASA to sole source Gateway habitation module to Northrop Grumman, Foust, Jeff. SpaceNews(23 July 2019). Retrieved 11 December 2019.
- ↑ 178.0 178.1 Template:Source-attribution
- ↑ Template:Source-attribution
- ↑ NASA Awards Contract to Northrop Grumman for Lunar Gateway Habitat Module, Messier, Doug. Parabolic Arc(23 July 2019). Retrieved 11 December 2019.
- ↑ NASA takes Gateway off the critical path for 2024 lunar return. spacenews.com. SpaceNews(13 March 2020). Retrieved 16 March 2020.
- ↑ Template:Source-attribution
- ↑ Europe will help build NASA's moon-orbiting Gateway space station, Wall, Mike. Space.com(27 October 2020). Retrieved 28 October 2020.
- ↑ NASA graduates new class of astronauts to join Artemis-era missions, Pearlman, Robert Z.. Space.com(10 January 2020). Retrieved 10 January 2020.
- ↑ Meet the Artemis Team. NASA(4 June 2019). Retrieved 9 December 2020.
- ↑ The time has finally come for Artemis 1, Foust, Jeff. The Space Review(2022-08-22). Retrieved 2022-08-23.
- ↑ Who Will Fly Around the Moon? Introducing the Artemis II Astronauts LIVE (Official NASA Broadcast).
- ↑ Meet the Crew.
- ↑ Where will NASA set up its moon base? August 18, 2022. By Leonard David. Retrieved 2023-04-18.
- ↑ 190.0 190.1 190.2 190.3 Template:Cite report
- ↑ Artemis Plan - NASA's Lunar Exploration Program Overview. NASA(September 2020). Retrieved November 10, 2022.
- ↑ 192.0 192.1 Artemis Deep Space Habitation: Enabling a Sustained Human Presence on the Moon and Beyond August, 2022. By Paul Kessler. Retrieved 2023-04-18.
- ↑ 193.0 193.1 NASA has a plan for yearly Artemis moon flights through 2030. The first one could fly in 2021., Weitering, Hanneke. Space.com(12 February 2020). Retrieved 20 February 2020.
- ↑ NASA's full Artemis plan revealed: 37 launches and a lunar outpost, Berger, Eric. Ars Technica(20 May 2020). Retrieved 24 May 2020.
- ↑ NASA to seek ideas for an Artemis lunar rover. SpaceNews(20 November 2019). Retrieved 26 June 2022.
- ↑ Template:Source-attribution
- ↑ NASA's first lunar habitat may be an RV-like rover built by Toyota, Berger, Eric. Ars Technica(15 July 2020). Retrieved 16 July 2020.
- ↑ NASA eyes closed-cabin rover "like an RV for the Moon" in first step toward long-term lunar presence, Bullard, Benjamin. syfy.com(15 July 2020). Retrieved 16 July 2020.
- ↑ Template:Source-attribution
- ↑ A Next Generation Spacesuit for the Artemis Generation of Astronauts, Mahoney, Erin. NASA(4 October 2019). Retrieved 24 October 2019.
- ↑ Orion Suit Equipped to Expect the Unexpected on Artemis Missions, Crane, Aimee. NASA(15 October 2019). Retrieved 24 October 2019.
- ↑ NASA's development of next-generation spacesuits(10 August 2021). Retrieved 10 August 2021.
- ↑ Elon Musk offers for SpaceX to make NASA spacesuits, after watchdog says program to cost $1 billion. CNBC(10 August 2021). Retrieved 25 September 2021.
- ↑ NASA Empowers Industry in Spacesuit Plan for Artemis, Space Station. NASA(27 July 2021). Retrieved 25 September 2021.
- ↑ NASA just picked these 2 companies to build next-gen spacesuits for the moon, space station. Space.com(1 June 2022).
- ↑ Orion Returns to Earth after Successful Test Flight, Davis, Jason. The Planetary Society(5 December 2014). Retrieved 25 May 2019.
- ↑ Orion spacecraft's flawless test flight puts Mars exploration one step closer(5 December 2014). Retrieved 25 May 2019.
- ↑ Splashdown! NASA's Orion Spaceship Survives Epic Test Flight as New Era Begins, Kramer, Miriam. Space.com(5 December 2014). Retrieved 17 October 2018.
- ↑ Orion Exploration Flight Test No. 1 timeline. Spaceflight Now(4 December 2014). Retrieved 17 October 2018.
- ↑ NASA Orion AA-2 vehicle at the launch pad for July test, Sloss, Philip. NASASpaceFlight.com(24 May 2019). Retrieved 25 May 2019.
- ↑ Image: The Orion test crew capsule. Phys.org(3 August 2018). Retrieved 17 October 2018.
- ↑ 212.0 212.1 NASA's Ascent Abort-2 Flight Test Successfully Completed. NASA(July 2, 2019). Retrieved November 10, 2022.
- ↑ Orbital to Provide Abort Test Booster for NASA Testing. Northrop Grumman(11 April 2007). Retrieved 25 May 2019.
- ↑ NASA: Artemis I. NASA. Retrieved 2022-11-16.
- ↑ NASA delays human lunar landing to at least 2025, Foust, Jeff(9 November 2021). Retrieved 9 November 2021.
- ↑ FY 2022 Budget Estimates – Gateway – Program Projects – International Habitat (I-Hab)(6 May 2021). Retrieved 9 July 2021.
- ↑ NASA Selects Blue Origin as Second Artemis Lunar Lander Provider, O’Shea, Claire. NASA(2023-05-19). Retrieved 2023-05-24.
- ↑ 218.0 218.1 Artemis I – IV Mission Overview / Status | Artemis Planning Manifest(31 October 2022). Retrieved 18 November 2022.
- ↑ NASA delays astronaut moon landing to 2025(9 November 2021). Retrieved 11 December 2021.
- ↑ 220.0 220.1 NASA Exploration Production and Operations Long-Term Sustainability Request for Information (RFI)(25 October 2021). Retrieved 6 November 2021.
- ↑ Template:Harvard citation no brackets. "This decade-long plan, which entails 37 launches of private and NASA rockets, as well as a mix of robotic and human landers, culminates with a "Lunar Surface Asset Deployment" in 2028, likely the beginning of a surface outpost for long-duration crew stays".
- ↑ 222.0 222.1 Template:Harvard citation no brackets. "NASA's "notional" plan for a human return to the Moon by 2024, and an outpost by 2028".
- ↑ Template:Harvard citation no brackets. "After Artemis 3, NASA would launch four additional crewed missions to the lunar surface between 2025 and 2028. Meanwhile, the agency would work to expand the Gateway by launching additional components and crew vehicles and laying the foundation for an eventual Moon base".
- ↑ Independent report concludes 2033 human Mars mission is not feasible(18 April 2019). Retrieved 6 December 2019.
- ↑ CAPSTONE Mission Launch No Longer Targeting June 13, Figliozzi, Gianine(8 June 2022). Retrieved 9 June 2022.
- ↑ Template:Cite press release
- ↑ Intuitive Machines sets mid-November launch date for first lunar lander, Foust, Jeff(14 August 2023). Retrieved 15 August 2023.
- ↑ ULA delays 1st Vulcan rocket launch to late 2023 after explosion during test, Howell, Elizabeth(13 July 2023). Retrieved 1 August 2023.
- ↑ Template:Source-attribution
- ↑ Astrobotic Selects United Launch Alliance Vulcan Centaur Rocket to Launch its First Mission to the Moon. ulalaunch.com. United Launch Alliance. Retrieved 17 December 2019.
- ↑ Lonestar emerges from stealth with plans for lunar data centers, Rainbow, Jason(19 April 2022). Retrieved 15 May 2022.
- ↑ Template:Source-attribution
- ↑ Intuitive Machines picks SpaceX for second Moon mission(2021-01-13). Retrieved 2021-01-13.
- ↑ Template:Source-attribution
- ↑ Astrobotic selects Falcon Heavy to launch NASA's VIPER lunar rover(13 April 2021). Retrieved 14 April 2021.
- ↑ SpaceX is now building a Raptor engine a day, NASA says(2 November 2022). Retrieved 2 November 2022.
- ↑ NASA's unnecessary US$504 million lunar orbit project doesn't help us get back to the Moon(16 June 2018). Retrieved 20 December 2018.
- ↑ Moon Direct — The New Atlantis(28 April 2021). Retrieved 26 June 2022.
- ↑ Advisory group skeptical of NASA lunar exploration plans(16 November 2018). Retrieved 20 December 2018.
- ↑ House introduces NASA authorization bill that emphasizes Mars over moon. SpaceNews(25 January 2020). Retrieved 27 January 2020.
- ↑ Bipartisan House bill spurns 2024 Moon landing goal, favoring focus on Mars, Clark, Stephen. Spaceflight Now. Retrieved 27 January 2020.
- ↑ Three winning bids for NASA's human landing system. spacepolicyonline.com. Retrieved 3 July 2020.
- ↑ NASA's "critical path" to the Moon no longer requires a Lunar Gateway, Gohd, Chelsea. Space.com(16 March 2020). Retrieved 3 July 2020.
Sources
- NASA administrator on new Moon plan: "We're doing this in a way that's never been done before". The Verge(17 May 2019). Retrieved 25 May 2019.
- NASA's full Artemis plan revealed: 37 launches and a lunar outpost, Berger, Eric. Ars Technica(20 May 2019a). Retrieved 23 May 2019.
- NASA Has a Full Plate of Lunar Missions Before Astronauts Can Return to Moon, Foust, Jeff. Space.com(24 May 2019a). Retrieved 25 May 2019.
- This is Lockheed Martin's idea for a reusable lander that carries people and cargo to the Moon, Grush, Loren. The Verge(3 October 2018). Retrieved 18 October 2018.
- Template:Source attribution
External links
- Moon to Mars portal at NASA
- Artemis program at NASA
- Monthly report by the Exploration Systems Development (ESD)
Template:Artemis program Template:Orion program Template:NASA space program Template:Moon spacecraft Template:US human spaceflight programs Template:Portal bar