Delhi–Amritsar–Katra Expressway is an under-construction Template:Convert long, 4-lane (expandable to 8 lanes) wide controlled-access expressway, which will connect Bahadurgarh border near Delhi with Katra in Jammu and Kashmir via Haryana and Punjab.[1][2] It will have a spur section which will connect Nakodar with Sri Guru Ram Das Ji International Airport located in Raja Sansi, Amritsar.[3] The Template:Convert long Delhi–Katra Expressway is National Expressway 5 (NE-5) and Template:Convert long Nakodar-Amritsar Expressway is National Expressway 5A (NE-5A). Once completed, it will reduce the current Delhi-Katra distance from Template:Convert to Template:Convert and the time travel will be reduced from 14 hours to 6 hours, and Delhi-Amritsar distance to Template:Convert and from the time travel will be reduced from 8 hours to only 4 hours.[3]

It will have a trauma centre, ambulances, fire brigades, traffic police, bus bays, truck stops, interchanges with refreshment, and recreational facilities. To be constructed as a part of the Bharatmala Pariyojana,[1] it is expected to cost 40,000 crores.[4] Detailed Project Report (DPR) was completed in November 2019,[5] and land acquisition commenced from January 2020.[6][7] M/S Feedback Infra Pvt Ltd. was appointed as DPR consultant to carry out alignment studies which submitted the final shortest proposed alignment report of Delhi–Nakodar–Gurdaspur section in September 2019,[8] Nakodar–Amritsar section in June 2020, and the survey is currently under progress in Jammu section.[9] It is part of Ludhiana-Delhi-Kolkata Industrial Corridor. There are 11 National industrial corridors and numerous state level industrial corridors in India.

File:11 Industrial Corridors.png
11 National Industrial Corridors of India.

Project details

It is a combination of greenfield and brownfield expressway which passes through Haryana, Punjab, and Jammu and Kashmir. It starts from Kundli Manesar Palwal (KMP) Expressway near Nilauthi village in Jhajjar district. It will lessen the workload of Grand Trunk Road. The Ministry of Road Transport and Highways of the NDA government planned to construct ten expressways in the country under Bharatmala Pariyojana, one of which would connect the national capital Delhi with Katra and Amritsar via Kharkhoda, Gohana, Jind, Sangrur, Malerkotla, Ludhiana, Jalandhar, Gurdaspur.

The Greenfield expressway splits into two near Nakodar. One greenfield section towards Amritsar would pass nearby Sultanpur Lodhi, Goindwal Sahib, Khadoor Sahib, TarnTarn and ends near Sri Guru Ram Das Ji International Airport.[10] The second section goes straight to Katra through Gurdaspur, bypassing Kathua and Jammu, and it consists of both greenfield and brownfield parts. Central and state governments also agreed to connect Dera Baba Nanak and Kartarpur Corridor with this expressway project. Nearly 14,000 acres of land in Punjab and 5,000 acres of Haryana will be acquired to construct these expressways. .

Construction

The NHAI has divided the construction work of Delhi–Amritsar–Katra Expressway into 2 phases with a total of 21 construction packages.

Phase 1

Sr. No. Package Segment Length Contractor
1. Nilauthi (Jhajjar)–Rukhi Pana (Sonipat) Template:Convert KCC Buildcon[11]
2. Rukhi Pana (Sonipat)–Gangana (Sonipat) Template:Convert CDS Infra Projects[11]
3. Gangana (Sonipat)–Alewa (Jind) Template:Convert KCC Buildcon[11]
4. Alewa (Jind)–Kharak Pandwa (Kaithal) Template:Convert NKC Projects[12]
5. Kharak Pandwa (Kaithal)–Ghagga (Patiala) Template:Convert CDS Infra Projects[12]
6. Ghagga (Patiala)–Bhawanigarh (Sangrur) Template:Convert Shiv Build India[13]
7. Bhawanigarh (Sangrur)–Bhogiwal (Malerkotla) Template:Convert Ceigall India[14]
8. Bhogiwal (Malerkotla)–Mullanpur Dakha (Ludhiana) Template:Convert Evrascon – MKCIL JV[14]
9. Mullanpur DakhaNakodarKang Sahbu Template:Convert Evrascon – MKCIL JV[12]
10. Kang Sahbu (Jalandhar)–Khojewal (Kapurthala) Template:Convert Evrascon – MKCIL JV[13]
11. Khojewal (Kapurthala)–Sri Hargobindpur Template:Convert Evrascon – MKCIL JV[15]
12. Sri HargobindpurGurdaspur Template:Convert Evrascon – MKCIL JV[16]

Nakodar–Amritsar spur

Sr. No. Package Segment Length Contractor
1. Nakodar (Jalandhar)–Dhunda (Tarn Taran) Template:Convert SP Singla Constructions
2. Dhunda (Tarn Taran)–Manawala Khurd (Tarn Taran) Template:Convert Ceigall India[15]
3. Manawala Khurd (Tarn Taran)–Harsha Chhina (Amritsar) Template:Convert Vozrozhdenie India[13]

Phase 2

Sr. No. Package Segment Length Contractor
13. Details awaited Template:Convert Tender Notice pending
14. Balsua (Gurdaspur)–Gurah Baildaran (Kathua) Template:Convert Megha Engineering & Infrastructures
15. Gurah Baildaran (Kathua) – Jakh (Samba) Template:Convert Vishwa Samudra Engineering
16. Jakh (Samba)–Jammu Airport (Jammu) Template:Convert Shivalaya Construction Company
17. Kunjwani (Jammu) – Sidhra (Jammu) & Domel (Udhampur) – Katra (Reasi) Template:Convert Apco Infratech
18. Details awaited Template:Convert Gawar Construction

Route alignment

Delhi to Nakodar (Main route)

The Phase-1 of Delhi–Amritsar–Katra Expressway consists of two sections, namely DelhiNakodarGurdaspur (NE-5) and NakodarAmritsar (NE-5A). The Phase-2 consists of GurdaspurKatra section. Following is the alignment agreed by the Governments of Haryana, Punjab, and Jammu and Kashmir with the NHAI.[7][17][3]

Delhi

Template:Anchor

Haryana to Kanjhawala (UER-II) extension: DPR was being prepared for this 20 km section in March 2025, which will be ready by Sept-Oct 2025, after which tenders for constructions will be invited.[18]

Alignment is from Nilothi-Kharkhoda–Gohana (west)–Jind (east)–Safidon (west)–Ratoli (Ambala–Narnaul)–Assandh (west)–Kalayat–Kaithal (west)–Barta. There is a proposal to extend it in Delhi from Nilothi to "Urban Extension Road II".

Nakodar to Amritsar (Spur-1)

First greenfield expressway spur (99 km long) from Nakodar to Amritsar through Sultanpur Lodhi, Goindwal Sahib, Khadur Sahib, Tarn Taran Sahib and ends at Sri Guru Ram Das Ji International Airport (Amritsar Airport).

Nakodar to Katra (Spur-2)

Second greenfield expressway spur from Nakodar to Katra passing through Kartarpur, Gurdaspur, and Dinanagar.

Inter-connectivity

Following provide the inter-connectivity:

Status updates

  • 2019 Nov: DPR of Delhi-Amritsar-Katra expressway completed by NHAI.[5]
  • 2020 Jun–Jul: In Haryana, Punjab, and Jammu and Kashmir, the land acquisition process started.[6][7][21][9]
  • 2021 Apr: Construction work awarded by NHAI for all 12 packages on 397.7 Km long Delhi-Nakodar-Gurdaspur section, and 2 out of 3 packages on 99km long Nakodar-Amritsar section.
  • 2021 Sep: NHAI announces the completion deadline is by October 2023.[22]
  • 2024 Aug: Likely completion date for Delhi-Ludhiana Katra is 31 December 2025 and 1 April 2026 for the Ludhiana-Amritsar spur. 669 km Delhi-Katra expressway almost complete in most states except Punjab due to the land acquisition issues in Punjab. Haryana and Jammu and Kashmir packages are 80-90% complete. In Punjab, where the completion rate for various packages is 3% to 90%, only 273 km is complete and 362 km is incomplete.[26] In Punjab of the total 295 km of land required, the land acquisition of 230 km is complete in 11 out of 13 districts except Ludhiana and Gurdaspur, the remaining 65 km will be acquired by the end of September 2024.[27]
  • 2025 Nov: Due to the land acquisition issues in some parts of Punjab the completion date of the expressway is pushed back to June 2026. NHAI is actively trying to resolve the issues with the farmers for the completion of the project without any further delay.

See also

References

  1. 1.0 1.1 Govt finds road construction easier for new expressways. Business Standard(1 November 2017). Retrieved 11 February 2018.
  2. Template:Cite report
  3. 3.0 3.1 3.2 3.3 3.4 Delhi to Chandigarh in two hours; NHAI clears deck for new highways. Hindustan Times(3 August 2020). Retrieved 3 August 2020.
  4. NHAI nod for Asr-Delhi highway extension. The Tribune(19 April 2017). Retrieved 2 October 2017.
  5. 5.0 5.1 Survey of 575-km-long Katra-Delhi express road corridor completed: Jitendra Singh - ET Auto. ETAuto.com.
  6. 6.0 6.1 Delhi-Amritsar-Katra Expressway project: NHAI to start work on 300 km stretch in Punjab; details(27 January 2020).
  7. 7.0 7.1 7.2 Punjab CM wants Expressway expedited, Sept 2018.
  8. Katra-Delhi Expressway DPR Consultants appointed: Dr Jitendra. Daily Excelsior(14 December 2017). Retrieved 3 June 2018.
  9. 9.0 9.1 जम्मू संभाग के 279 गांवों से गुजरेगा दिल्ली-कटरा एक्सप्रेस-वे, भूमि अधिग्रहण की अधिसूचना जारी. Amar Ujala. Retrieved 2020-07-12.
  10. Delhi-Amritsar-Katra Expressway: Amritsar to Delhi in 4 hours! Phase 1 of the expressway to cost Rs 25,000 crore. The Financial Express(2020-06-03). Retrieved 2020-07-12.
  11. 11.0 11.1 11.2 CDS and KCC lowest bidders for NHAI's DAK tender(8 March 2021).
  12. 12.0 12.1 12.2 Evrascon, NKC & CDS secure Delhi–Katra Expressway works(19 March 2021).
  13. 13.0 13.1 13.2 Shiv, Evrascon & Vozrozhdenie win Delhi–Amritsar Expressway's work(28 March 2021).
  14. 14.0 14.1 Ceigall & Evrascon win Delhi–Amritsar Expressway's packages 7 & 8(6 April 2021).
  15. 15.0 15.1 Evrascon & Ceigall win Delhi–Amritsar Expressway's work(20 April 2021).
  16. Evrascon wins Delhi–Amritsar Expressway's package 12(30 March 2021).
  17. Development of Haryana Section from Km 0+000 to Km 135+056 of Delhi–Amritsar-Katra Expressway. Environmentclearance.
  18. 18.0 18.1 18.2 NHAI preparing 3 DPR for better connectivity in Delhi, Times of India, 25 March 2025.
  19. DPR consultant appointed in December 2017.
  20. DPR consultant appointed, Business Starndard, July 2018.
  21. दिल्ली अमृतसर कटड़ा एक्सप्रेस वे का नोटिफिकेशन, जींद के 16 गांवों को होगा फायदा. Dainik Jagran.
  22. Delhi-Katra in 6 hours by road. Expressway to be launched in 2 years, Livemint. livemint.com(2021-09-16). Retrieved 2021-09-16.
  23. PM Modi to lay foundation stone of Delhi-Amritsar-Katra Expressway - Oneindia News. www.oneindia.com(2022-01-03). Retrieved 2022-01-04.
  24. PM @narendramodi Lays the Foundation Stone of the Delhi-Amritsar-Katra Expressway in ... - Latest Tweet by DD News | 📰 LatestLY. LatestLY(24 April 2022). Retrieved 2022-04-24.
  25. Will ensure Delhi-Katra Expressway gets completed before 2024 LS polls: Nitin Gadkari(11 April 2023).
  26. Barring Punjab, 669 km Delhi-Katra e-way almost complete in most states, The Tribune, 23 Aug 2024.
  27. [1], Hindustan Times, 28 Aug 2024.