The Green Line or Line 2 is one of the two lines of Chennai Metro, Phase 1 Project. The line stretches from Template:Metro to Template:Metro. Out of the 17 stations, 9 stations are underground and 8 are elevated .
History
Extension History
| colspan="6" style="background:#Template:Chennai Metro color;" | History | ||||
|---|---|---|---|---|
| Extension date | Termini | Length | Stations | |
| 29 June 2015 | Template:Metro | Template:Metro | 7 | |
| 14 October 2016 | Template:Metro | St. Thomas Mount | 1 | |
| 15 May 2017[1] | Template:Metro | Template:Metro | 7 | |
| 25 May 2018 | Template:Metro | Template:Metro | 2 | |
| Total | St. Thomas Mount | Template:Metro | 17 | |
Map
Stations
Green Line
The line connects the central, the western and the southern ends of the city. The stations include :
| align="center" colspan="7" style="background:#Template:Chennai Metro color;" | Green Line | ||||||
|---|---|---|---|---|---|---|
| S.No | Station Name | Connections | Layout | Opened | Coordinates | |
| English | Tamil | |||||
| 1 | Template:Metro | புரட்சித் தலைவர் டாக்டர். எம்.ஜி. இராமச்சந்திரன் சென்ட்ரல் | Template:Color box Blue Line, Puratchi Thalaivar Dr. M.G. Ramachandran Central Railway Station, Chennai Park Suburban, Chennai Park Town MRTS, Chennai Moore Market Suburban | Underground | 25 May 2018 | Template:Coord |
| 2 | Egmore | எழும்பூர் | Chennai Egmore railway station | Underground | 25 May 2018 | |
| 3 | Template:Metro | நேரு பூங்கா | None | Underground | 15 May 2017 | Template:Coord |
| 4 | Template:Metro | கீழ்ப்பாக்கம் மருத்துவ கல்லூரி | Chetput railway station | Underground | 15 May 2017 | Template:Coord |
| 5 | Template:Metro | பச்சையப்பன் கல்லூரி | None | Underground | 15 May 2017 | Template:Coord |
| 6 | Template:Metro | ஷெனாய் நகர் | None | Underground | 15 May 2017 | Template:Coord |
| 7 | Template:Metro | அண்ணா நகர் கிழக்கு | None | Underground | 15 May 2017 | Template:Coord |
| 8 | Template:Metro | அண்ணா நகர் கோபுரம் | None | Underground | 15 May 2017 | Template:Coord |
| 9 | Template:Metro | திருமங்கலம் | None | Underground | 15 May 2017 | Template:Coord |
| 10 | Template:Metro | கோயம்பேடு | None | Elevated | 29 June 2015 | Template:Coord |
| 11 | Template:Metro | புரட்சித் தலைவி டாக்டர். ஜெ. ஜெயலலிதா புறநகர் பேருந்து நிலையம் | Puratchi Thalaivar Dr. M.G.R Bus Terminus | Elevated | 29 June 2015 | Template:Coord |
| 12 | Template:Metro | அரும்பாக்கம் | None | Elevated | 29 June 2015 | Template:Coord |
| 13 | Template:Metro | வடபழனி | None | Elevated | 29 June 2015 | Template:Coord |
| 14 | Template:Metro | அசோக் நகர் | None | Elevated | 29 June 2015 | Template:Coord |
| 15 | Template:Metro | ஈக்காட்டுத்தாங்கல் | None | Elevated | 29 June 2015 | Template:Coord |
| 16 | Template:Metro | அறிஞர் அண்ணா ஆலந்தூர் | Template:Color box Blue Line | Elevated | 29 June 2015 | |
| 17 | St. Thomas Mount | பரங்கிமலை | Template:Rint Southern Suburban Railways | Elevated | 14 October 2016 | |
Status and Fare
Status
The Green Line is currently functioning from Template:Metro to Template:Metro.
Fare
The Current system of fare for Green line is as follows :
See also
- Chennai
- Blue Line
- Chennai Metro
- List of Chennai metro stations
- Chennai Monorail
- Chennai Mass Rapid Transit System
- Chennai Suburban Railway
- Transport in Chennai
- List of rapid transit systems in India
- List of metro systems
Template:Div col end Template:Clear
References
- ↑ Chennai Metro's 8 km Koyambedu – Nehru Park Section Inaugurated. The Metro Rail Guy(14 May 2017).
External links
Template:Commons Template:Wikivoyage
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
Template:Chennai topics Template:Chennai Metro Template:Transport in Chennai Template:Rapid transit in India Template:Rapid transit in Asia