Created by Camorabug
Last edited March 28, 2026

Template:Pp-semi-indef Template:Good article Template:Pp-extended


Template:Infobox airport

Kempegowda International Airport Template:Airport codes is an international airport serving Bengaluru, the capital of the Indian state of Karnataka. Spread over Template:Convert, it is located about Template:Convert north of the city, near the suburb of Devanahalli. It is owned and operated by Bengaluru International Airport Limited (BIAL), a public–private consortium. The airport opened in May 2008, as an alternative to the increasingly congested HAL Airport, the original commercial airport serving the city. It is named after Kempe Gowda I, the founder of Bengaluru. It is Karnataka's first fully solar powered airport, developed by CleanMax Solar.[1][2]

The airport is the third-busiest in India,[3] behind the airports in Delhi and Mumbai. It is the 26th busiest airport in Asia and the 54th busiest airport in the world as of 2024.[4] In FY2024-25, the airport handled over 41.87 million passengers and Template:Convert of cargo.[5][6] The airport offers connecting flights to all 6 inhabited continents, and direct flights to 5.

The airport has two passenger terminals that handle both domestic and international operations, and two runways, the second of which was commissioned on 6 December 2019.[7][8] The second terminal was inaugurated by Prime Minister Narendra Modi on 11 November 2022.[9][10] There is also a cargo village with 3 cargo terminals.

The airport serves a hub for Air India, Alliance Air, DHL Aviation, FedEx Express and Star Air,[11] as well as an operating base for Air India Express, Akasa Air and IndiGo.

History

Planning (1991–2004)

The original airport serving Bengaluru was HAL Airport, located Template:Convert from the city centre. It was the primary airport in the city until 2008. Originally established in 1942 for military and defence purposes, HAL began domestic operations for the first time in the late 1970s. The unexpected popularity of newly offered domestic flights encouraged rapid expansion of the airport. In the late 1990s, the first international services begun, with Air India flights to Singapore.[12] In 2000, the first foreign carrier, Royal Nepal Airlines, commenced operations with flights to Kathmandu,[13] followed by Lufthansa's A340 service to Germany a year later.[14] Several other major international carriers such as British Airways and Air France started serving the old airport by 2005.[15][16]

An expansion of the airport's international terminal was impossible, since there was no space in the surrounding environment, and the airport apron could only park six aircraft.[17] In March 1991, former Chairman of the National Airports Authority of India (NAAI), S. Ramanathan, convened a panel to select a site for the new airport. The panel decided on Devanahalli, a village about Template:Convert north of Bengaluru.[18][19] The State Government drafted a proposal to build the airport with private assistance, which the Union Government approved in 1994.[20] In 1995, the Airports Authority of India (AAI) and the Government of Karnataka decided to call for international consortia to own, build and operate the new greenfield airport.[21]

In December 1995, a consortium made up of the Tata Group, Raytheon and Singapore Changi Airport signed a memorandum of understanding (MoU) with the State Government regarding participation in the project. In June 1998, however, the consortium announced it was pulling out of the project due to delays in government approval. These included disputes over the location of the new airport and the fate of HAL Airport.[18][22]

In May 1999, the Airports Authority of India (AAI) and the Karnataka State Industrial and Infrastructure Development Corporation (KSIIDC) signed a memorandum of understanding (MoU) regarding the project. It would be a public–private partnership, with AAI and KSIIDC holding a 26% share and private companies holding the remaining 74%.[20] In January 2001, the State Government created the company Bengaluru International Airport Limited (BIAL) as a special purpose entity, and began searching for partners.[23] By November, the project had attracted Zürich Airport, Siemens Project Ventures and Larsen & Toubro.[24] Construction was expected to begin in October 2002;[25] however, governmental delays persisted.[26][27] The Union Cabinet approved the project in February 2000.[28] The concession agreement between the State Government, the Union Government and BIAL was signed in July 2004, and it required the closure of HAL Airport.[29][30]

It took nearly a decade to progress from the initial stages of land allocation and acquisition, to the signing of shareholder agreements in 2002 and the start of construction.[21]

Design

When the project was initiated, BIAL anticipated traffic of approximately 5 million passengers per annum in the first few years of operations. However, the scale of air traffic growth in the city meant that the figure was already breached by 2008. It took more than 9 months to redesign the project and gain permission for expansion. By the time the approvals for the reworked project were sanctioned, construction was half completed. Despite the challenges, BIAL expected the airport to be operational by the initially proposed date of completion.[21]

The revised increase in capacity catered to 11 million passengers per annum, more than doubling the previous estimates. BIAL's modified plan was to build a terminal with 8 passenger boarding bridges, 1 double arm aerobridge, 9 remote bus gates and a single, Template:Convert long runway. BIAL also planned to build an apron with 42 Code-C aircraft stands (with 8 contact stands), as well as an air and land-side road system. The estimated cost for the entire project at the time was Template:INRConvert.[21]

Construction and opening (2005–2008)

Construction commenced on 2 July 2005, and was completed in 32 months. BIAL set the launch date for 30 March 2008.[31][32] However, due to delays in establishing air traffic control services at the airport, the launch date was pushed to 11 May,[33] and further to 24 May 2008.[34]

Public criticism arose with the opening of the new airport, mainly due to the closure of HAL Airport. In March 2008, AAI employees initiated a massive strike against the closure of HAL Airport in Bengaluru and Begumpet Airport in Hyderabad, fearing they would lose their jobs.[35] The Bangalore City Connect Foundation, a group of citizens and businessmen, staged a rally in mid-May, claiming the new airport was too small for the latest demand projections.[36][37] On 23 May, a hearing was held at the Karnataka High Court over poor connectivity between the city and the airport. Ultimately, the State Government decided to go ahead with inaugurating the new airport and closing HAL Airport.[38]

The first commercial flight, Air India Flight 609 (AI609) from Mumbai, was allowed to land at 10:40PM on 23 May,[39] the day before the official inauguration, as it would be continuing to Singapore shortly after midnight. The airport became the third greenfield airport to open under a public–private partnership (PPP) model in India, after Rajiv Gandhi International Airport in Hyderabad and Cochin International Airport in Kochi.[40]

Renaming and expansion (2009–present)

The airport was originally called 'Bengaluru International Airport'.[41] In February 2009, the State Government sent a proposal to the Union Government to rename the airport after the founder of the city, Kempe Gowda I.[42] When no action was taken, the State Government passed a resolution for the name change in December 2011.[43] The Union Government accepted the proposal in 2012,[44] and formally approved it in July 2013.[43] The airport was officially renamed 'Kempegowda International Airport' on 14 December 2013, alongside the inauguration of the expanded terminal building.[45]

Kingfisher Airlines used the airport as a hub, and was one of the largest airlines at the airport. Following its collapse in October 2012, other airlines stepped in to fill the gap in domestic connectivity and establish hubs.[46] Air Pegasus and AirAsia India started using the airport as a hub from 2014.[47][48]

The first phase of expansion was launched in June 2011 and completed in December 2013.[49][50] The Template:INRConvert project doubled the size of the passenger terminal to Template:Convert. It included the construction of additional check-in, immigration, security and baggage reclaim facilities.[50][51] 1 domestic gate and 3 international gates were added to increase capacity. A large, sweeping roof was built to connect the original building with the expansion.[52] The expanded terminal, dubbed "Terminal 1A", raised the capacity of the airport to 25 million passengers per annum.[53]

In October 2019, Ethiopian Airlines began flights to Addis Ababa with Boeing 737 MAXs, marking the first nonstop connection between Bengaluru and Africa.[54] In January 2021, Air India began flights to San Francisco with Boeing 777s, marking the first nonstop connection between Bengaluru and North America.[55] In September 2022, Qantas began flights to Sydney with Airbus A330s, marking the first nonstop connection between Bengaluru and Oceania.[56][57] The following month, Emirates began serving the airport with its Airbus A380, the world's largest passenger plane, with daily flights to Dubai, marking the airport's first A380 service.[58]

The now-completed second phase of expansion encompassed the construction of a second runway and a second passenger terminal in 2 phases. Since completion, the airport has been able to handle 55-60 million passengers per year.[59][60] The approximately Template:INRConvert project received clearance from India's Ministry of Environment, Forest and Climate Change (MoEFCC) in September 2014.[61][62]

Ownership

The airport is owned and operated by Bengaluru International Airport Limited (BIAL), a public limited company.[63] The Government of India has granted BIAL the rights to operate the airport for 30 years, with the option to continue for an additional 30 years.[64] The company is a public–private consortium.[65]

Zürich Airport sold its 5% stake in the airport to Fairfax Financial in April 2016 for Template:INRConvert.[66]

Indian conglomerate GVK Group initially owned 43% of the shares of Bengaluru Airport, but divested 33% of its stake to Fairfax Financial for Template:INRConvert in 2016.[67][68] GVK closed the deal in March 2017.[69] In January 2018, GVK decided to sell its remaining 10% in shares to Fairfax India Holdings for Template:INRConvert, and exited BIAL completely.[70]

26% of shares are held by government entities Karnataka State Industrial Investment and Development Corporation (13%) and the Airports Authority of India (13%). 74% is held by private companies Fairfax Financial (54%) and Siemens Project Ventures (20%).[71]

In March 2021, the Airports Authority of India announced their intention to sell their 13% stake in order to raise funds. Between FY22–25, the government aims to raise up to Template:INRConvert through aviation. This process will begin with the auction of shares held in Bengaluru Airport, followed by the sales of shares held in the airports of Hyderabad, Mumbai and Delhi.[72]

Facilities

File:DutyFree-BLR-Airport.jpg
Duty free at the old international arrivals area

Runways

Kempegowda International Airport has two parallel runways in operation.[73]

Active runways at Kempegowda International Airport
Runway designation Length Width Approach lights/ILS
09L/27R Template:Convert Template:Convert CAT III / CAT III[74]
09R/27L Template:Convert Template:Convert[75] CAT III / CAT III[76]

Four years after it was opened, the first runway (now designated 09L/27R) was entirely resurfaced due to a serious decline in quality.[77] From 11 March to 3 April 2012, it was closed daily between 10:30AM and 5:30PM.[78] BIAL accused construction company Larsen & Toubro of building the runway poorly.[79]

The construction of the second runway (09R/27L) at the airport was completed and the runway inaugurated on 6 December 2019, with the departure of IndiGo Flight 466 (6E466) to Hyderabad.[80] The runway can cater to Code-F aircraft such as the Airbus A380 and Boeing 747-8. It is equipped with CAT IIIB ILS. The runway also features a parallel taxiway and two cross-field taxiways in the east, linking the new runway to the old runway and the aprons at Terminal 1 and Terminal 2. The original runway (09L/27R) was also upgraded as part of the expansion work.[81]

The old runway (09L/27R) was closed from 22 June 2020 for nine months for rehabilitation and strengthening.[82] It was opened for operations again on 31 March 2021, along with the operational south runway. On doing so, KIA became the first airport in South India to facilitate parallel runway operations.[83]

The north runway (09L/27R) is approved for and capable of low-visibility takeoffs, allowing aircraft movement even when the runway visual range (RVR) is as low as 125m. Civil works to also equip this runway with a CAT IIIB ILS system were completed in December 2024.[84] The calibration for the ILS was completed in January 2025 and full CAT IIIB ILS capability was made operational in May 2025.[85] With runway upgrades on the Northern runway completed, both runways and associated taxiways are capable of handling Code-F aircraft such as the Airbus A380 and Boeing 747-8.[86]

Terminals

Terminal 1

Template:Multiple image The original terminal building can handle 35 million passengers per annum, and handles all domestic flights operated by IndiGo, Akasa Air, Alliance Air and SpiceJet.[51] Check-in and baggage reclaim is situated on the lower floor, while departure gates are located on the lower & upper floors. Boarding gates 1&2, 12–18 and 28–43 on the upper floor are equipped with jet bridges. Boarding gates 3–9 and 19–25 on the lower floor form the Western and Eastern bus gates respectively.[87] Gates 41–42 are equipped to serve the world's largest passenger aircraft, the Airbus A380.[88]

Since 12 September 2023, with the shift of all international flights to Terminal 2, Terminal 1 has become a domestic-only operation.[89]

In 2019, BIAL retracted the rights of Above Ground Level and Plaza Premium to operate the lounges in Terminal 1, and decided to operate them by themselves. Following this decision, and the transfer of international flights, there are now only two lounges in Terminal 1: the BLR Domestic Lounge and the new 080 Domestic Lounge (which is split into 2 disconnected lounges, as 1 used to serve the erstwhile international departures).[90] Named "080" after the trunk dial code of the city, the new lounge aims to pay an ode to the culture of Bengaluru with local artistry, regional culture-inspired interiors and botanical elements. Both lounges are operated by Travel Food Services on behalf of the airport.[91]

Terminal 2

Template:Multiple image The airport's second terminal was designed as a tribute to the 'Garden City' title of Bengaluru by Skidmore, Owings & Merrill, and was constructed by Larsen & Toubro. Construction of the first phase commenced in 2018, but the project faced delays owing to the COVID-19 pandemic.[92] It was inaugurated on 11 November 2022 by Prime Minister of India Narendra Modi, and began operations in January 2023. The first phase of Terminal 2, built at a cost of Template:INRConvert, is Template:Convert and will help augment the capacity of the airport by an additional 25 million passengers per annum.[93] The second phase of Terminal 2 is under construction to increase capacity by an additional 20 million passengers per annum.[94]

Arrivals are situated on the ground floor, while departures are on the first floor. The first phase of Terminal 2 features 95 check-in counters, 17 security lanes, 9 baggage claim belts, 34 conventional and 6 electronic immigration gates. With provisions for Code-F gates to handle larger aircraft like the Airbus A380 and the Boeing 747-8, the first phase of Terminal 2 began domestic operations on 15 January 2023, with Star Air Flight 117 (S5117) to Kalaburagi being the first scheduled flight to use the new terminal.[95] On 12 September 2023, Terminal 2 began handling all international operations, with Saudia Flight 867 (SV867) from Jeddah operating the first international arrival and subsequent departure.[96] In addition to handling all international operations, Terminal 2 also handles all domestic flights operated by Air India, Air India Express and Star Air.[89]

Aviation fuel services

The airport has a fuel farm spread over Template:Convert, west of the cargo village and passenger terminal. It was built by Indian Oil Skytanking Ltd (IOSL), but is shared by multiple oil companies.[97] In October 2008, IndianOil commissioned a Template:Convert fuel pipeline between its storage terminal in Devanagonthi and Kempegowda International Airport.[98]

Cargo facilities

The airport has 3 cargo terminals. One is operated by AISATS Ltd. (Air India Singapore Airport Terminal Services Limited) and includes a facility for storing pharmaceuticals.[99] DHL and Blue Dart Aviation jointly operate a Template:Convert terminal.[100]

The third cargo terminal is operated by Menzies Aviation Bobba (Bangalore) Pvt. Ltd, a joint venture between Menzies Aviation and Bobba Group (a sales agency for Lufthansa Cargo). The Template:Convert cargo terminal began operations in May 2008. Additionally, a greenfield domestic cargo terminal spanning Template:Convert opened in February 2025.[101] Combined, the terminal has the capacity to handle Template:Convert tons of cargo annually.[102]

Altogether, the airport has the capacity to process up to Template:Convert of cargo annually and currently sees ~Template:Convert handled per year.[103] The airport processes the highest amount of perishable cargo in the country.[104]

BIAL inaugurated a separate cargo village in December 2008. The village is spread over Template:Convert and includes office spaces, conference rooms, a cafeteria for staff and parking space for nearly 80 trucks.[105]

Other facilities

IndiGo iFly Training Academy

On 4 September 2019, India's biggest airline IndiGo announced that it would extend its learning academy, iFly, to Bengaluru, its 2nd such facility in the country.[106] From 6 September 2019 onwards, iFly began facilitating training to IndiGo flight crew. With over 27,000 employees, there are over 100 instructors in the academy who conduct workshops and training exercises on a regular basis.[107]

Maintenance, Repair and Overhaul Facilities

IndiGo's second MRO facility to service their fleet of Airbus jets is located at KIA. The Template:Convert facility has capacity for narrow-body aircraft and houses a single bay catering for widebody aircraft.[108] The MRO became operational in November 2022.[109] As of May 2025, IndiGo is currently in the process of constructing a second MRO of roughly Template:Convert at the airport, in order to service wide-body aircraft.[110]

Aligning with their vision to establish a hub at the airport, Air India signed a memorandum of understanding (MoU) in February 2024 to build Maintenance, Repair, and Overhaul (MRO) facilities at Kempegowda International Airport, for airframe maintenance of both wide-body and narrow-body jets, including heavy structural checks.[111] The MRO will be built on a Template:Convert parcel of land, and is expected to be operational by early 2026.[112]

Central Kitchen

Food services provider SATS set up their first central kitchen in India at the airport on 16 March 2024. A Template:Convert facility, it was built with an investment of Template:INRConvert,[113] to cater to demand in the region. SATS already has a long-standing partnership with the airport, through its aviation catering associate TajSATS and ground handling associate AISATS.

Future plans

As part of the airport's masterplan, the completion of Terminal 2's Phase 2 will add an additional capacity of 20 million passengers per annum. There are also plans to build an APM (Automated People Mover) system that will seamlessly connect passengers between all terminals.[114]

The final phase of the master plan involves identifying a location for Terminal 3, though this is only expected in the late 2020s or early 2030s depending on passenger traffic. With Terminal 3, the airport is eyeing a capacity of 90-100 million passengers per annum.[115][116] In the interim, several infrastructure projects such as the construction of the Airport's Metro & Suburban Rail stations, as well as the Airport City, are planned.[117][118]

As of August 2025, the airport's new Western cross-field taxiway is under construction, with civil works set to complete by H12026. Approximately Template:Convert in length, the 2 parallel taxiways will link the airport's 2 runways on the Western side of the airfield and will be able to accommodate Code-F aircraft. The taxiway will cross the main access road, the North cargo road and the upcoming Airport line.[84]

Airlines and destinations

Passenger

File:Kempegowda International Airport2.png
Kempegowda International Airport passenger destinations

Template:Airport destination list

Cargo

Template:Airport destination list

Statistics

Busiest domestic routes from BLR (2024–25)[119]
Rank Airport Carriers Passengers
1 Delhi Air India, Air India Express, Akasa Air, IndiGo, SpiceJet 4,681,042
2 Mumbai, Maharashtra Air India, Akasa Air, IndiGo 4,114,574
3 Kolkata, West Bengal Air India Express, Akasa Air, IndiGo 2,326,777
4 Hyderabad, Telangana Air India, Air India Express, Akasa Air, Alliance Air, IndiGo, Star Air 2,293,602
5 Pune, Maharashtra Air India Express, Akasa Air, IndiGo 1,881,109
6 Kochi, Kerala Air India Express, Alliance Air, IndiGo 1,482,441
7 Chennai, Tamil Nadu Air India, Air India Express, IndiGo 1,474,948
8 Goa–Dabolim, Goa Air India Express, IndiGo 1,163,301
9 Ahmedabad, Gujarat Air India, Akasa Air, IndiGo 980,653
10 Varanasi, Uttar Pradesh Air India Express, Akasa Air, IndiGo 882,200
Busiest international routes from BLR (2024–25)[120]
Rank Airport Carriers Passengers
1 Dubai, United Arab Emirates Emirates, IndiGo 889,571
2 Singapore IndiGo, Singapore Airlines 587,319
3 Abu Dhabi, United Arab Emirates Air India Express, Akasa Air, Etihad Airways, IndiGo 482,525
4 London–Heathrow, United Kingdom Air India, British Airways, Virgin Atlantic 397,722
5 Doha, Qatar IndiGo, Qatar Airways 331,936
6 Bangkok–Suvarnabhumi, Thailand IndiGo, Thai Airways International 301,026
7 Frankfurt, Germany Lufthansa 297,496
8 Kuala Lumpur, Malaysia AirAsia, Batik Air Malaysia, Malaysia Airlines, IndiGo 252,161
9 Paris–Charles de Gaulle, France Air France 204,236
10 Colombo–Bandaranaike, Sri Lanka IndiGo, SriLankan Airlines 161,197

Ground transport

File:BIAL trumpet interchange.JPG
The trumpet interchange between NH44 and the road leading to the airport.
File:BIAL Volvo buses.JPG
BMTC's erstwhile Volvo buses that served the Vayu Vajra routes.

Road

Template:Main Kempegowda International Airport is connected to Bengaluru by National Highway 44 (NH44). In January 2014, a six-lane flyover above NH44 was completed to connect Hebbal and the airport, helping to reduce travel time to and from the city.[121][122] Two alternative routes run through Thanisandra and Budigere.[123] The airport has 4 parking lots located at ground level.[124] Alongside BIAL's own taxi service, ride-sharing companies Ola and Uber have dedicated 'taxi zones' outside both terminals.[125][126]

The Bengaluru Metropolitan Transport Corporation (BMTC) has a dedicated pick-up zone outside both terminals and provides bus transportation to all parts of the city through the Vayu Vajra (Kannada for "Diamond in the Air") service.[127] It is operated using a fleet of Switch EiV12 buses.[128]

Additionally, the Karnataka State Road Transport Corporation (KSRTC) operates a nonstop bus service called "Flybus" between Kempegowda International Airport and Mysore, as well as a route to Manipal via Mangaluru.[129]

Upcoming projects include the construction of an Eastern Tunnel Access Road which will decongest the route taken by passengers arriving from Whitefield, thus reducing travel times by 30%. It is expected to cost Template:INRConvert and finish construction by 2027. BIAL is also considering the construction of access roads that link the airport to the new Satellite Town Ring Road.[130]

Rail

A halt at the KIA boundary commenced operations in January 2021.[131] The train halt is connected to the airport terminal via 5-minute shuttle buses. 5 trains from the city operate daily to Devanahalli station at the KIA halt.[132] Future plans include turning Devanahalli station into a mega rail terminal to decongest the city's railway stations and serve as the hub for the Template:Convert circular rail network and high-speed rail (HSR) lines.[133][134]

The Airport and Airport City will also be connected to the city by the Sampige line of the under-construction Bengaluru Suburban Rail Project (BSRP). It is expected to be operational by December 2027.[135]

The plan to build a metro link between Bengaluru and its airport was revived in 2020, and is now under construction as part of the Blue Line.[136] The project will link Bengaluru with the airport under Phase 2 of the Namma Metro project, and is Template:Convert long. The line connects with the Red & Orange Lines at Hebbal, the Pink Line at Nagawara, the Purple Line at K.R. Puram and the Yellow Line at Central Silk Board, thus serving the entire city. The project is expected to open in 3 phases between June and December 2026.[137]

There are 2 metro stations being built in the airport campus; 1 to serve the upcoming Airport City and the other one in the Multi Modal Transport Hub opposite Terminal 2. The cost of building these 2 stations is estimated to be Template:INRConvert.[136]

Air

Bengaluru-based startup Sarla Aviation has signed a memorandum of understanding (MoU) with BIAL to establish 'air taxi' operations between Electronic City in Bengaluru South and the airport using eVTOL aircraft. Tickets are expected to cost Template:INRConvert and the service is expected to cover the Template:Convert stretch in just 19 minutes.[138]

See also

References

  1. CleanMax Solar to power Chennai Metro – Times of India. The Times of India.
  2. Kempegowda International Airport. Retrieved 19 September 2017.
  3. Top 5 Airports of India by cargo traffic in 2020(7 September 2020). Retrieved 14 June 2021.
  4. 2023 Airport Traffic Report(April 2024).
  5. Annexure III – Passenger Data. aai.aero. Retrieved 26 April 2025.
  6. Annexure IV – Freight Movement Data. aai.aero. Retrieved 20 April 2024.
  7. L&T bags Bengaluru airport contract to build terminal two. Economic Times(3 October 2018). Retrieved 7 August 2019.
  8. First flight takes off from second runway at Bengaluru airport. The Hindu(6 December 2019). Retrieved 9 December 2019.
  9. PM inaugurates swanky Terminal-2 of Bengaluru airport. The New Indian Express(11 November 2022). Retrieved 13 November 2022.
  10. All international flights from Bengaluru airport will move to Terminal 2 from September 1. The Times of India(9 June 2023). Retrieved 13 June 2023.
  11. DHL Express opens its EUR22 million expanded Bengaluru Gateway to support e-commerce growth. enmobile.prnasia.com. Retrieved 1 February 2022.
  12. Bangalore Airport History. Retrieved 5 January 2022.
  13. Royal Nepal Airlines to Bangalore. Retrieved 5 January 2022.
  14. Lufthansa to fly to Bangalore from September 1. Rediff.com(20 March 2001). Retrieved 11 March 2025.
  15. British Airways celebrates 10 years of flying to Bengaluru. Press Trust of India(13 October 2015). Retrieved 11 March 2025.
  16. Air France-KLM veut faire de Roissy la nouvelle porte de l'Inde. Les Echos(16 December 2005). Retrieved 11 March 2025.
  17. Hard times ahead for city airport authorities. The Hindu(31 October 2005). Retrieved 9 March 2016.
  18. 18.0 18.1 Grounded by politics. India Today(31 January 1997). Retrieved 30 March 2016.
  19. Cover Story: Bangalore. India Today(7 November 2005). Retrieved 30 March 2016.
  20. 20.0 20.1 Airport Projects: Bangalore International Airport. Infrastructure Development Department, Government of Karnataka. Retrieved 9 March 2016.
  21. 21.0 21.1 21.2 21.3 Realising the new Bangalore Airport. International Airport Review(28 September 2007). Retrieved 23 February 2025.
  22. This flight is delayed. India Today(20 July 1998). Retrieved 30 March 2016.
  23. Hunt for Devanahalli airport partners begins. The Hindu Business Line(9 January 2001). Retrieved 9 March 2016.
  24. Siemens team wins bid to build international airport in Bangalore: Reuters. Rediff(1 November 2001). Retrieved 22 July 2015.
  25. Devanahalli airport work has begun. The Hindu(7 May 2005). Retrieved 9 March 2016.
  26. Grounded at the word go. Live Mint(11 February 2008). Retrieved 9 March 2016.
  27. Ministry clears Bangalore airport project – BIAL seeks review of draft version of concession pact. The Hindu Business Line(18 March 2004). Retrieved 9 March 2016.
  28. Cabinet nod for Devanahalli airport project. Deccan Herald(2 February 2000). Retrieved 5 May 2024.
  29. Concession agreement for airport signed. The Hindu(5 July 2004). Retrieved 9 March 2016.
  30. All clear now for new Bangalore airport. The Hindu(15 June 2004). Retrieved 30 March 2016.
  31. Bangalore airport work to begin on July 2. The Hindu Business Line(27 June 2005). Retrieved 9 March 2016.
  32. Bangalore international airport launch set for March 30. The Hindu Business Line(23 October 2007). Retrieved 9 March 2016.
  33. BIAL relents, sets May 11 as new date for airport opening. Oneindia(13 March 2008). Retrieved 9 March 2016.
  34. Bengaluru airport wait gets longer. mydigitalfc.com(2008). Retrieved 9 March 2016.
  35. Slow take-off for airport stir. Gulf News(13 March 2008). Retrieved 30 March 2016.
  36. Citizen's body protests closure of old Bangalore airport. Live Mint(17 May 2008). Retrieved 30 March 2016.
  37. Battle over new Bangalore airport. BBC News(16 May 2008). Retrieved 30 March 2016.
  38. Decks cleared for new Bangalore airport. Rediff(23 May 2008). Retrieved 30 March 2016.
  39. Bangalore airport takes wings. Rediff(24 May 2008). Retrieved 9 March 2016.
  40. India's airport sector vibrant, with tenders for six PPP concessions: CAPA Mumbai Summit, 3/4 Feb. CAPA – Centre for Aviation(20 January 2015). Retrieved 9 April 2016.
  41. Bangalore's new airport almost ready for use. anna.aero(16 May 2008). Retrieved 30 March 2016.
  42. Karnataka govt proposes renaming Bengaluru International Airport. Times of India(27 February 2009). Retrieved 14 March 2016.
  43. 43.0 43.1 Bangalore airport named after city founder Kempe Gowda. Business Standard(17 July 2013). Retrieved 14 March 2016.
  44. Centre accepts proposal to name Bengaluru International Airport after Kempegowda. The Economic Times(6 April 2012). Retrieved 14 March 2016.
  45. Bangalore International Airport Ltd will be Kempegowda International Airport from December 14. The Economic Times(24 November 2013). Retrieved 14 March 2016.
  46. Bangalore Airport looks to woo domestic airlines to set up hub. Indian Express(12 July 2013). Retrieved 31 March 2016.
  47. Air Pegasus 3rd airline to take off from Bangalore. Times of India(21 January 2014). Retrieved 31 March 2016.
  48. AirAsia launches India ops from Bangalore. The Hindu(12 June 2014). Retrieved 31 March 2016.
  49. Work on Bangalore International Airport expansion set to begin in June. Daily News and Analysis(24 May 2011). Retrieved 12 March 2016.
  50. 50.0 50.1 New terminal inaugurated at airport. Deccan Chronicle(15 December 2013). Retrieved 11 October 2015.
  51. 51.0 51.1 Bangalore Airport: Terminals, facilities, and food outlets, Meharchandani, Dhwani. Housing News(16 November 2023). Retrieved 29 December 2024.
  52. Master plan to develop airport real estate. The Hindu(14 December 2013). Retrieved 13 March 2016.
  53. Bangalore unveils its new international airport terminal. India Today(16 December 2013). Retrieved 11 October 2015.
  54. Bengaluru gets 1st direct flight to Africa. The Times of India(29 October 2019). Retrieved 29 December 2024.
  55. First non-stop connecting flight from the US touches down in Bengaluru, Nair, Shalini. Airport Technology(11 January 2021). Retrieved 29 December 2024.
  56. Qantas announces direct flights from Sydney-Bengaluru. The Hindu(8 April 2022). Retrieved 6 July 2022.
  57. Qantas to start Bengaluru-Sydney nonstop flights from September 14. The Times of India(9 April 2022). Retrieved 6 July 2022.
  58. Bengaluru's Nikhil and Sandeep who piloted Emirates A380 on cloud nine after historic flight to city. The Indian Express(22 October 2022). Retrieved 8 November 2022.
  59. India's Bengaluru airport to construct second terminal and runway in 2016. Airport Technology. Retrieved 22 January 2016.
  60. Bengaluru airport T2 phase-1 by 2021, will handle 20 mn more flyers. Business Standard(19 January 2016). Retrieved 21 January 2016.
  61. Work on Terminal 2 at KIA begins. The Hindu(5 April 2016). Retrieved 8 April 2016.
  62. Clearance for Airport Expansion. New Indian Express(5 September 2014). Retrieved 15 March 2016.
  63. Template:Cite press release
  64. Extension of term of the Concession Agreement in respect of Kempegowda lnternational Airport, Bengaluru.. Ministry of Civil Aviation(1 July 2021). Retrieved 2 March 2025.
  65. Kempegowda International Airport had over 33 million passengers in 2019. The Hindu(27 January 2020). Retrieved 2 March 2025.
  66. Zurich Airport sells 5% stake in Bangalore airport to Fairfax for $48.9 mn. The Hindu Business Line(18 April 2016). Retrieved 3 June 2016.
  67. GVK to sell stake in Bangalore Airport for Rs 2,149 crore. The Economic Times(28 March 2016). Retrieved 2 March 2025.
  68. Template:Cite press release
  69. GVK Power jumps over 5% on selling residual stake in Bangalore airport. The Economic Times(5 June 2017). Retrieved 2 March 2025.
  70. GVK to sell 10% stake in Bengaluru airport to Fairfax for ₹1,290. Business Line(11 January 2018). Retrieved 21 April 2022.
  71. Fairfax India Holdings Corporation. Retrieved 21 November 2019.
  72. Government to exit Hyderabad & Bengaluru JV airports. The Times of India(21 September 2021). Retrieved 27 November 2021.
  73. Kempegowda International Airport, Bengaluru, India. Airport Technology(7 June 2023). Retrieved 23 February 2025.
  74. VOBL – Kempegowda Int/ Bengaluru Airport(26 May 2016). Retrieved 3 June 2016.
  75. Technical Information. Airports Authority of India. Retrieved 6 October 2023.
  76. Technical Information. Airports Authority of India. Retrieved 12 March 2016.
  77. Bangalore airport to close down for repairs. Sunday Guardian(4 March 2012). Retrieved 12 March 2016.
  78. No flights at BIA for 7 hrs from today. Times of India(11 March 2012). Retrieved 12 March 2016.
  79. Bangalore airport turns the heat on L&T over runway. Business Standard(6 March 2012). Retrieved 12 March 2016.
  80. First flight takes off from second runway of KIA. Deccan Herald(6 December 2019). Retrieved 14 December 2019.
  81. KIA begins work on 2nd runway; to be linked to Terminal 2 apron. Deccan Herald(November 2016). Retrieved 17 March 2017.
  82. Closed Kempegowda International Airport runway to begin operations by March-end. The New Indian Express(8 February 2021). Retrieved 6 April 2021.
  83. Bengaluru: Kempegowda International Airport gets parallel runways, first in south India. The Times of India(26 March 2021). Retrieved 6 April 2021.
  84. 84.0 84.1 Bengaluru airport's elevated taxiway work to commence in Q1 2025: BIAL. MoneyControl(4 October 2024). Retrieved 5 October 2024.
  85. AAI successfully calibrates ILS on KIA's north runway, set for full operation by May 2025. The New Indian Express(11 January 2025). Retrieved 11 January 2025.
  86. Both runways at KIA Bengaluru can now handle Airbus A380 aircraft. The Hindu(5 September 2025). Retrieved 16 September 2025.
  87. Terminal Maps.
  88. Bangalore airport named after city founder Kempegowda. NDTV(15 December 2013). Retrieved 15 March 2016.
  89. 89.0 89.1 KIA's Terminal-2 will handle both international and domestic flights. The Hindu(10 September 2023). Retrieved 12 September 2023.
  90. BLR Airport Lounge Guide: Kempegowda International. LoungePair. Retrieved 29 December 2024.
  91. Bengaluru airport unveils '080 Lounge' at terminal one(9 June 2022). Retrieved 15 September 2022.
  92. Pandemic delays completion of Bengaluru airport's Terminal II. The Indian Express(17 September 2021). Retrieved 10 November 2022.
  93. Bengaluru's Kempegowda International Airport gets SWANKY new Terminal 2: All you need to KNOW - Design, Features, Capacity. Zee News. Retrieved 10 November 2022.
  94. KIA's garden-themed Terminal-2 massive in size. Deccan Herald(15 January 2018). Retrieved 10 November 2022.
  95. Bengaluru airport's Terminal 2 to begin domestic operations on January 15. Indian Express(10 January 2023). Retrieved 11 January 2023.
  96. International flight operations to commence from Terminal 2 of Bengaluru airport Tuesday. Indian Express(11 September 2023). Retrieved 12 September 2023.
  97. Fuel deals: Indian Oil JV eyes Mumbai, Delhi airports. Rediff(19 August 2008). Retrieved 12 March 2016.
  98. IOC does its groundwork for Devanahalli airport. The Hindu(15 October 2008). Retrieved 12 March 2016.
  99. Menzies opens pharma cold zone in Bangalore. Air Cargo World(25 August 2014). Retrieved 12 March 2016.
  100. DHL and Blue Dart open integrated terminal at Bangalore airport. Bangalore Aviation(21 November 2008). Retrieved 31 March 2016.
  101. Bengaluru airport gets country's largest greenfield domestic cargo terminal, new facility spread over 7 acres. The Indian Express(28 February 2025). Retrieved 2 March 2025.
  102. Mezies Aviation Cargo. Retrieved 23 November 2022.
  103. Bengaluru Airport cargo handled up 7% in FY2024. www.itln.in(16 April 2024). Retrieved 29 December 2024.
  104. Bengaluru airport tops in perishable exports from India for fourth year. The Economic Times(4 July 2024). Retrieved 29 December 2024.
  105. Cargo village takes off at B'lore airport. Business Standard(10 December 2008). Retrieved 31 March 2016.
  106. IndiGo launches 2nd ifly facility in Bengaluru. The Economic Times(4 September 2019). Retrieved 1 January 2025.
  107. IndiGo launches second iFLY facility in Bengaluru(4 September 2019). Retrieved 26 February 2022.
  108. IndiGo Expands Maintenance Capabilities To Bangalore(26 July 2022). Retrieved 15 September 2022.
  109. IndiGo inaugurates second MRO facility at Bengaluru airport. The Economic Times(23 November 2022). Retrieved 25 November 2022.
  110. IndiGo to build another MRO facility at Kempegowda International Airport in Bengaluru. The Hindu(30 May 2025). Retrieved 2 August 2025.
  111. Air India and Tata Advanced Systems sign an MOU with Government of Karnataka, to invest INR 2300 Crore. Kempegowda International Airport Press Releases(19 February 2024). Retrieved 19 February 2024.
  112. Air India MRO in Bengaluru will be ready by early 2026, says CEO Wilson. The Hindu(4 September 2024). Retrieved 5 October 2024.
  113. SATS to establish Rs 210 cr central kitchen in India at Bengaluru airport(26 July 2021).
  114. Bengaluru airport likely to get automated people mover for seamless transfers between terminals. Moneycontrol(30 November 2023). Retrieved 9 January 2024.
  115. Bengaluru airport to roll out its master plan with renovation of T1, new place for T3 by 2030. The Indian Express(1 December 2023). Retrieved 9 January 2024.
  116. With T3, Kempgowda airport eyeing a traffic of 90-100 million passengers. Deccan Herald. Retrieved 29 December 2024.
  117. Namma Metro Blue Line To KIA: Airport City Metro Station Construction Underway. One India(25 December 2023). Retrieved 9 January 2024.
  118. Air India & Tata Advanced Systems to invest Rs 2,300 cr in Karnataka. Economic Times(19 February 2024). Retrieved 19 February 2024.
  119. Home | Directorate General of Civil Aviation | Government of India. www.dgca.gov.in. Retrieved 15 June 2025.
  120. International Air Transport: Statistics for Q1 2025. Retrieved 5 July 2025.
  121. Hebbal to Kempegowda International Airport in 20 minutes. The Times of India(30 January 2014). Retrieved 13 March 2016.
  122. Drive to airport to be smoother by month-end. The Hindu(2 January 2014). Retrieved 10 March 2016.
  123. Two alternate roads from the east to the airport by March 2017. The Hindu(18 October 2016). Retrieved 18 October 2016.
  124. Bangalore International Airport, India. Airport Technology. Retrieved 9 March 2016.
  125. Ola signs pact with Kempegowda international airport. The Hindu Business Line(19 May 2016). Retrieved 20 May 2016.
  126. Uber too, gets space at Bengaluru international airport. The Times of India(25 May 2016). Retrieved 25 May 2016.
  127. Vayu Vajra bleeds BMTC of Rs 5 lakh a day. Bangalore Mirror(3 November 2008). Retrieved 13 March 2016.
  128. Bengaluru's BMTC begins trial runs of AC electric buses. MoneyControl(11 January 2025). Retrieved 15 January 2025.
  129. KSRTC to operate Flybus between Manipal and KIA. The Hindu(17 August 2015). Retrieved 12 March 2016.
  130. BIAL to build 2.5 km tunnel road to help decongest Bengaluru's eastern parts. Deccan Herald(1 December 2024). Retrieved 29 December 2024.
  131. Bengaluru-Kempegowda airport suburban train to finally start from Monday(3 January 2021). Retrieved 3 January 2021.
  132. Trains between Bengaluru city and Kempegowda International Airport: All you need to know(5 January 2021). Retrieved 12 February 2021.
  133. Proposed mega rail terminal near Bengaluru airport moves forward, site identified. Deccan Herald. Retrieved 29 December 2024.
  134. Bengaluru Circular Rail Link project work starts. Key updates, routes and other details. The Economic Times(1 July 2024). Retrieved 29 December 2024.
  135. K-RIDE sets ball rolling for suburban railway line from Majestic to Bengaluru airport. Deccan Herald. Retrieved 29 December 2024.
  136. 136.0 136.1 BMRCL will spend Rs 800 crore for infra for two Metro stations to airport, line will be ready by December 2024. The New Indian Express(12 October 2021). Retrieved 8 November 2021.
  137. 𝐁𝐚𝐧𝐠𝐚𝐥𝐨𝐫𝐞 𝐀𝐢𝐫𝐩𝐨𝐫𝐭 𝐌𝐞𝐭𝐫𝐨 | Namma Metro Blue Line - Route, Map, & Cost. Magicbricks Blog(15 March 2023). Retrieved 29 December 2024.
  138. Bengaluru Airport to Electronics City in just 19 minutes: Electric flying taxis to launch soon with Rs 1,700 fare. The Economic Times(17 October 2024). Retrieved 29 December 2024.

Template:Commons-inline

Template:Portal bar Template:Airports in India