Created by Rxsolution
Last edited February 2, 2026


This article lists all the previous and planned launches by ISRO using Small Satellite Launch Vehicle (SSLV).

SSLV flight D2 during rollout.

Launch statistics

Script error: No such module "Chart".

Decade-wise summary of SSLV launches
Decade Successful Partial success Failure Total
2020s 2 0 1 3


Launch history

2022–2029

Date/Time
(UTC)
Payload Launch site Regime Status
Flight Number Operator Function
Remarks
7 August 2022
03:48
Template:Flagicon EOS 02Template:Line breakTemplate:Flagicon AzaadiSAT[1]
Template:Cvt
Satish Dhawan FLP LEO (intended)Template:Line breakTAO (achieved) Template:Failure
SSLV-D1 ISRO Earth observation
The first developmental flight of SSLV. The mission target was a circular orbit of altitude 356.2 km with 37.2° inclination. The mission carried two satellite payloads. The 135 kg EOS 02, an Earth observation satellite and the 8 kg AzaadiSAT CubeSat.[2][3][4] Due to sensor failure coupled with shortcomings of onboard software, the stage as well as the two satellite payloads were injected into an unstable transatmospheric Earth orbit measuring 356×76 km and subsequently destroyed upon reentry. According to S. Somanath, an anomaly lasting 2 seconds in one of the accelerometers during second stage separation initiated salvage mode by onboard computer. Guidance, navigation, and control software switched from 'closed loop guidance' where it received real-time feedback from all sensors to an 'open loop guidance' where accelerometer data gets isolated and a predetermined path is followed.[5] This resulted in velocity shortfall from the required 7.3 km/s to 7.2 km/s. Being in salvage mode, Velocity-Trimming Module didn't rectify this shortfall which led to mission failure.
10 February 2023
03:48[6][7][8]
Template:Flagicon EOS-07Template:Line breakTemplate:Flagicon Janus-1Template:Line breakTemplate:Flagicon AzaadiSAT-2
Template:CvtTemplate:Line breakTemplate:CvtTemplate:Line breakTemplate:Cvt
Satish Dhawan FLP LEO Template:Success
SSLV-D2 ISRO Earth observation
Second developmental flight of the SSLV.[9][10][11] The purpose of SSLV-D2 is to launch EOS-07, Janus-1 and AzaadiSAT-2 into a 450-kilometer circular orbit and showcase the in-flight performance of the SSLV vehicle systems.[12] According to SSLV-D1 fault evaluation study, six onboard accelerometers detected vibrations that were longer in duration and more intense during the second stage of separation. In order to ensure that this problem doesn't occur again, the second stage detachment system in SSLV-D2 was modified to reduce vibrations. Furthermore, the system was redesigned to navigate utilizing NavIC data and readings will now be monitored for a longer time before entering rescue mode.[13] The separation mechanism, the equipment bay, and the on-board system for identifying malfunctioning sensors were further modified and five new pieces of hardware were installed. The electronics in SSLV-D2 worked successfully, as did the launch vehicle's new, affordable guidance and navigation system.[14]
16 August 2024
03:47[15][16]
Template:Flagicon EOS-08Template:Line breakTemplate:Flagicon SR-0 DEMOSAT
Template:CvtTemplate:Line breakTemplate:Cvt
Satish Dhawan FLP LEO Template:Success
SSLV-D3 ISRO Earth observation
Third developmental flight and completion of SSLV Development Project.[17][18] The development team will continue to search for specific operational activities in the VTM stage before ISRO supplies the industry with SSLV technology for serial production. Any necessary fine-tuning will be finished prior to the technology transfer.[19][20] Repeatable flight performance of the SSLV vehicle systems has also been demonstrated by SSLV-D3.[21]

Future launches

Date / time (UTC) Rocket,
Configuration
Launch site Payload Orbit User
By Q1 2026[22] SSLV SHAR Template:Flagicon TBD
Template:Flagicon PARIKSHIT
ISRO
Flight L1. First serial flight of the SSLV.[16]
NET 2026[23] SSLV SHAR Template:Flagicon TBD
Template:Flagicon Azista60°
ISRO
Flight L2.[16]
2026[24] SSLV SHAR Template:Flagicon Optimus LEO Space Machines Company
Space MAITRI (Mission for Australia-India's Technology, Research and Innovation). First dedicated commercial SSLV launch. Payload weight 450 kg.[25]
TBD[26] SSLV SHAR Template:Flagicon BlackSky Global-5, 6, and two others LEO Spaceflight Industries
Manifested on a future SSLV commercial flight, four 56 kg Blacksky Global satellites to ~500 km circular orbit with 50° inclination.[27][28]

See also

References

  1. AzaadiSAT – Space Kidz India. Retrieved 2022-07-08.
  2. SSLV-D1/EOS-2 Mission Brochure. Retrieved 4 August 2022.
  3. ISRO's mini launcher SSLV is unborn but has 2 flights booked. The Hindu(2019-08-07). Retrieved 2019-08-16.
  4. Department of Space, Annual Report 2020-2021. Retrieved 6 March 2021.
  5. ISRO chief S. Somanath interview | 'An anomaly for two seconds led to SSLV mission's underperformance'. The Hindu(2022-08-11). Retrieved 2022-08-11.
  6. SSLV 2nd mission to carry US Sat, EOS-7; OneWeb Sats set to arrive Friday, Kumar, Chethan(26 January 2023). Retrieved 27 January 2023.
  7. ISRO planning to launch second development SSLV flight in Feb: S Somanath. mint(2023-01-04). Retrieved 2023-01-04.
  8. Sslv Hardware Ready, Launch Likely In '23 | Bengaluru News - Times of India. The Times of India(Dec 5, 2022). Retrieved 2022-12-05.
  9. Second development flight of Small Satellite Launch Vehicle likely this year. The Hindu(12 October 2022). Retrieved 13 October 2022.
  10. SSLV-D2/EOS-07 MISSION. www.isro.gov.in. Retrieved 2023-02-05.
  11. SSLV-D2/EOS-07 Mission: Second Developmental Flight of SSLV. www.isro.gov.in. Retrieved 2023-02-05.
  12. Isro’s SSLV-D2/EOS-07 mission successful; three satellites placed in orbits. The Times of India(2023-02-10). Retrieved 2024-08-16.
  13. Mission accomplished: ISRO’s SSLV-D2 launch explained, Singh, Abhinav. The Week(10 February 2023). Retrieved 2024-08-16.
  14. SSLV-D2 places three small satellites in orbit, Dutt, Anonna. The Indian Express(2023-02-10). Retrieved 2024-08-16.
  15. Loksabha Q&A. DEPARTMENT OF SPACE(2023-04-05).
  16. 16.0 16.1 16.2 Integrated Launch Manifesto for 2023-24 (Q4) & 2024-25(2024-02-08).
  17. SSLV-D3/EOS-08 Mission. ISRO. Retrieved 2024-08-16.
  18. SSLV development complete, says Isro chairman Somanath after today’s launch. The Indian Express(2024-08-16). Retrieved 2024-08-16.
  19. ISRO successfully launches EOS-08 Earth Observation Satellite. The Hindu(2024-08-16). Retrieved 2024-08-16.
  20. SSLV development complete, says Isro chairman Somanath after today’s launch, Dutt, Anonna. The Indian Express(2024-08-16). Retrieved 2024-08-16.
  21. Isro's SSLV-D3 mission successful, EOS-08 and SR-0 Demosat satellites placed in orbit. The Times of India(2024-08-16). Retrieved 2024-08-16.
  22. ISRO reveals new schedule, 7 launches planned in next 5 months. News9live(2025-11-04). Retrieved 2025-11-22.
  23. Unstarred Question No. 406: Space Programmes and Missions. Parliament of India(24 July 2024). Retrieved 28 July 2024.
  24. SSLV's first dedicated commercial launch to put Australia-built satellite into orbit in 2026(26 June 2024). Retrieved 28 July 2024.
  25. NSIL and SMC_SSLV (1).pdf
  26. SSLV | BlackSky Global 5 & 6. Next Spaceflight. Retrieved 2023-09-06.
  27. Application for Earth Exploration Satellite Service by BlackSky Global, LLC. FCC(25 July 2019). Retrieved 28 July 2019. Template:PD-notice
  28. BlackSky Global to launch four earth observation satellites on board ISRO SSLV-D2. The Tech Outlook(2021-02-25). Retrieved 2023-09-06.