List of high-speed railway lines in India

Created by Ajay Kumar
Last edited September 26, 2023


Template:Main India currently does not have any High-speed rail lines operational, but has several lines planned, one of which is currently under construction. The following article lists all the lines in various stages of completion.[1]

Classification

The Indian Ministry of Railways has classified railway line speeds into five categories:[2][3][4]

  • Conventional lines: The routes which support an operational speed of less than Template:Convert are conventional rail lines.
  • Group B lines: The routes which support an operational speed between Template:Convert are classified as Group B lines.
  • Group A lines: The routes that support the speeds between Template:Convert are classified as Group A lines.
  • High-speed lines: The routes that support speeds beyond semi-high speeds are considered as High-speed lines.

Overview

Under construction and proposed high speed rail lines.
Map of corridors according to National Rail Plan
File:Potential HSR Lines in India 2.gif
Potential High Speed Rail lines (2011)[5][6]

The network is proposed to have top speeds of Template:Convert, and are envisaged to run on elevated corridors to isolate high-speed train tracks to prevent trespassing.[7] Multiple feasibility studies have been done[8] by Systra, Italferr, RITES Limited, Mott MacDonald, INECO, PROINTEC, Ayesa, Japan External Trade Organization (JETRO), Parsons Brinckerhoff.[9][10][11][12]

Template:Legend inline
Template:Legend inline
Template:Legend inline

Summary of proposed and under construction high-speed rail lines in India (standard gauge)
High-speed Corridor Speed Length Further extension Status Planned opening (According to NRP)[1]
km/h mph km mi
North India[13]
Delhi–Varanasi high-speed rail corridor Template:Convert Template:Convert DPR* under preparation 2031
Delhi–Amritsar high-speed rail corridor Template:Convert Template:Convert (Via Chandigarh) Approved[14] 2051
Delhi–Ahmedabad high-speed rail corridor Template:Convert Template:Convert (Via Udaipur) Land acquisition to begin 2031
Amritsar–Jammu high-speed rail corridor Template:Convert Template:Convert (Via Pathankot) Proposed[15] 2051
East India
Varanasi–Howrah high-speed rail corridor Template:Convert Template:Convert (Via Patna) DPR under preparation[16] 2031
Patna–Guwahati high-speed rail corridor Template:Convert Template:Convert Proposed 2051
West India
Mumbai–Ahmedabad high-speed rail corridor Template:Convert Template:Convert (Via Surat, Bilimora) Under Construction 2026 (Surat-Bilimora)

2028 (full completion)

Mumbai–Nagpur high-speed rail corridor Template:Convert Template:Convert (Via Nashik, Aurangabad) DPR under preparation 2051
Mumbai–Hyderabad high-speed rail corridor[17] Template:Convert Template:Convert (Via Pune, Solapur) DPR under preparation 2051
Pune–Nashik rail line[18] Template:Convert Template:Convert (Via Narayangaon, Sangamner) Land acquisition initiated 2027
Ahmedabad–Rajkot high-speed rail corridor[19] Template:Convert Template:Convert (Via Limbdi) DPR Prepared TBD
Central India
Nagpur–Varanasi high-speed rail corridor Template:Convert Template:Convert Proposed 2041
South India
Chennai–Mysuru high-speed rail corridor Template:Convert Template:Convert (Via Bengaluru)[14] DPR under preparation 2031
Hyderabad–Bengaluru high-speed rail corridor Template:Convert Template:Convert Proposed 2041
Silver Line (Thiruvananthapuram–Kasaragod)[20] Template:Convert Template:Convert (Via Ernakulam) DPR Prepared TBD
Total
15 corridors Average speed : ≈300 kmph Template:Convert 0/15 2051

*DPR = Detailed Project Report


300–350 km/h

Mumbai-Ahmedabad

Template:Main

File:Map high-speed line Mumbai–Ahmedabad.png
Map of Mumbai-Ahmedabad high-speed rail corridor.

Template:Routemap


Mumbai–Ahmedabad high-speed rail corridor is the first of the twelve lines proposed and also the first one to be under-construction, it connects India's economic hub Mumbai with the city of Ahmedabad.[21]

Delhi-Varanasi

Template:Main The Delhi-Varanasi High-Speed Rail Corridor is India's second bullet train project after the Mumbai-Ahmedabad Corridor. The Template:Convert stretch will connect Varanasi to Delhi through 12 stations via Lucknow & Ayodhya.[22]

Delhi-Ahmedabad

Template:Main

Chennai-Mysuru

Template:Main

Mumbai-Nagpur

Template:Main

Mumbai-Hyderabad

Template:Main

Varanasi-Howrah

Template:Main

Hyderabad-Bengaluru

Template:Main

Nagpur-Varanasi

Template:Main

Delhi-Amritsar

Template:Main

Patna-Guwahati

Template:Main

Amritsar-Jammu

Template:Main

200–250 km/h

Ahmedabad-Rajkot (220 km/h)

Template:Main

Thiruvananthapuram-Kasargod (200 km/h)

Template:Main

Pune-Nashik (200 km/h)

Template:Main

Diamond quadrilateral

Template:Main

File:Potential Diamond Quadrilateral HSR route map.JPG
Potential Diamond Quadrilateral route map.

Diamond quadrilateral is an ambitious plan from India to connect its major cities of New Delhi, Kolkata, Chennai and Mumbai via a high-speed rail network. Sections of this project are either already under construction or approved.[23]

See also

References

  1. 1.0 1.1 Railway Budget 2021: Indian Railways to focus on new bullet train networks in coming years?(23 January 2021).
  2. Railway Minister Launches High Speed Rail Corporation of India Limited (HSRC). Disha Diary(29 October 2013). Retrieved 13 November 2013.
  3. Indian Railways Classification of Lines as A , B , C , D , E - Railways FAQ - Railway Enquiry. indiarailinfo.com. Retrieved 4 May 2023.
  4. Classification of Railway Lines in India. BrainKart. Retrieved 4 May 2023.
  5. Indian Railways: Vision 2020. Indian Railways(December 2009). Retrieved 29 November 2014.
  6. Dedicated Freight Corridors & High Speed Rails, India's Ultra Low Carbon Mega Rail Projects – Anjali Goyal, Executive Director (Budget), India.
  7. INTRODUCTION OF HIGH SPEED CORRIDORS ON I.R.: IMPACT AND CHALLENGES BEFORE CIVIL ENGINEERS – Parmod Kumar, EDCE(G)/Railway BoardTemplate:Dead link
  8. India holds talks with Japan on high speed train corridors. Retrieved 2 February 2012.
  9. India, Japan sign MoU for feasibility study of high speed railway system in India, says, Bastich(9 October 2013).
  10. Feasibility study for Mumbai – Ahmedabad high speed line agreed – Railway Gazette.
  11. [1] Template:Webarchive
  12. Mumbai-Ahmedabad bullet train? Chinese team visits CST(16 September 2014).
  13. Delhi likely to get 2 stations under 3 proposed Bullet train projects. Business Standard India(31 January 2021).
  14. 14.0 14.1 Aarvee-GSL Wins Chennai-Mysuru HSR's LiDAR & Alignment Design, Agarwal, Anshu(22 February 2021).
  15. Railway Budget 2021: Indian Railways to focus on new bullet train networks in coming years?(23 January 2021).
  16. Growever Wins Varanasi – Howrah HSR's LiDAR & Alignment Design(9 April 2021).
  17. High speed rail corridor: Travel time from Mumbai to Hyderabad and Nagpur to reduce by 50 percent(31 January 2020). Retrieved 11 June 2020.
  18. Big boost for city as Pune-Nashik high-speed rail project gets Centre's in-principle approval. Hindustan Times(2023-02-05). Retrieved 2023-04-20.
  19. Ahmedabad-Rajkot new rail link approved; to help Saurashtra region avail Bullet Train services. The Financial Express. Retrieved 2023-04-20.
  20. A Silverline Project to connect entire Kerala, Shah, Narendra. Metro Rail News(2022-12-23). Retrieved 2023-04-20.
  21. JICA presents draft report on bullet train project to joint committee.
  22. Delhi to Agra bullet train every hour might turn into a reality by 2029!. Times of India(27 October 2021).
  23. Address by The President of India to the Joint sitting of Parliament 2014.

Template:High-speed rail in India Template:Railways in Western India Template:Ahmedabad topics